Interim Deficiency Rept Re Loose Sway Strut Bushings, Initially Reported 800627.Investigations Are Being Conducted to Determine Cause & Develop Plan for Corrective Action
ML20003C914
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 02/26/1981
From: Koester G
KANSAS GAS & ELECTRIC CO.
To: Seidle W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
10CFR-050.55E, 10CFR-50.55E, KMLNRC-81-061, NUDOCS 8103180704
Download: ML20003C914 (2)


Text

-

PDR LPDR u '

s TIC KANSAS GAS AND ELECTRIC COA tiSIC CEflTRA!. FILES r

Ea me: -

O L E N as L ACESTER w<t**ss.os=f wwcesan February 26, 1981 Mr. W.C. Seidle, Chief Reactor Construction and Engineering Support Branch U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive Suite 1000 Arlington, Texas 76011 KMLNRC 81-061 Re:

Docket No. 50-482 9

~

fa Ref:

1) Letter of 6/27/80 from GLKoester, KG&E, to

() g V, q g

WCSeidle, NRC i

s

2) Letter of 8/29/80 from GLKoester, KG&E, to

't Yk' f<

WCSeidle, NRC b

/,-

?

3) Letter of 11/12/80 from GLKoester, KG&E, to = j h,7 WCSeidle, NRC A

er L'

Subj: Interim Report - Potential 50.55(e)

%, ' t Loose Sway Strut Bushings o)

Dear Mr. Seidle:

This letter is written to update the status of loose sway strut bushings as reported in the References.

Loose and displaced bushings were identified in 12 sway struts furnished by Bergen-Patterson and ITT Grinnel to the Wolf Creek Site.

Although none of the bushings have as yet become disengaged from the strut assemblies, the potential exists for such disengagement to occur with the possible result that certain piping assemblies will be overstressed. On this basis, this matter is being treated as a potential Significant Deficiency under 10CFR 50.55(e) definition. We are advised that recently completed inspections at the Callaway Site have identified similar difficulties with eleven (11)

Bergen-Patterson furnished sway struts at that site.

These inspection findings were also reported to the NE' by Union Electric as reportable Significant Deficiency under 10CFR 50.55 (3) criteria.

Further investigations are being undertaken in conjunction with Union Electric to determine the cause of these difficulties and to develop a meaningful plan of corrective action.

Inasmuch as these problems are common 810818070'/

s

=.

~.

Mr. W.C. Seidle KMLNRC 81-061 February 26, 1981 to both SNUPPS Sites, a generic report involving the Bergen-Patterson units will be submitted by SNUPPS on behalf of both Kansas Gas and Electric Cogany and Union Electric Cc=pany. We anticipate a final report being issued to the NRC on or before June 1,1981.

~

Please advise if you require additional information.

Sincerely, ps, l Vd ~'

a~

GLK:bb cc: TIandel (NRC Site Inspector) s