Text
,i
a
-
[
(
UNITED STATES
NUCLEAR REGULATORY COMMISSION
-
o
3
8
REGION I
%
[
631 PARK AVENUE
.....[
KING OF PRUSSIA, PENNSYLVANIA 19406
JAN 2 81981
Docket Nos. 50-245
4 %.',g
50-336
17
'
Northeast Naclear Energy Company
)
f ,d'?g
ATTN: Mr. W. G. Counsil
.
y6
c
u,,ky/pgg c';
Senior Vice President - Nuclear
s
'
' y' '
Engineering and Operations
u
W *./
P.O. Box 270
t
Hartford, Connecticut 06101
,
-N
&
Gentlemen:
--
Subject: Combined Inspection 50-245/80-24 and 50-336/80-23
This refers to the routine inspection conducted by Mr. J. Shedlosky of this
office on November 9 through December 31, 1980 at the Millstone Nuclear Power
Station, Waterford, Connecticut, of activities authorized by NRC License
Nos. OPR-21 and DPR-65 and to the discussions of our findings held by
Mr. Shedlosky with Mr. Mroczka and other members of your staff periodically
during the inspection.
Areas examined during this inspection are described in the Office of Inspection
and Enforcement Inspection Report which is enclosed with this letter.
Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, measurements raade by the
inspector, and observations by the inspector.
Within the scope of this inspcction, no items of noncompliance were observed.
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If this
report contains any information that you (or your contractor) believe to be
proprietary, it is necessary that you make a written application within 20 days
to this office to withhold such information from public disclosure. Any such
application must be accompanied by an affidavit executed by the owner of the
infonnation, which identifies the document or part sought to be withheld, and
which contains a statement of reasons which addresses with specificity the
items which will be considered by the Commission as listed in subparagraph (b)(4)
of Section 2.790. The infonnation sought to be withheld shall be incorporated
as far as possible into a separate part of the affidavit.
If we do not hear
from you in this regard within the specified period, the report will be placed
in the Public Document Room.
810318 0M
9
.
.
._
-
_
_
_.
_
.
.
Northeast Nuclear Energy Company
2
JAN 2 81981
No reply to this letter is required; however, if you should have any
questions concerning this inspection, we will be pleased to discuss them
with you.
Sincerely,
_ _
_o
1
. Brunner, Chief
Re tor Operations and Nuclear
SppportBranch
Enclosure: Office of Inspection and Enforcement Combined
Inspection Report Number 50-245/80-24 and 50-336/80-23
cc w/ encl:
J. F. Opeka, System Superintendent Nuclear Operations
E. J. Mroczka, Station Superintendent
D. G. Diedrick, Manager of Quality Assurance
J. R. Himmelwright, Licensing Safeguards Engineer
.,
i.
-