ML20003C753
| ML20003C753 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 01/20/1981 |
| From: | Robert Carlson NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Hukill H METROPOLITAN EDISON CO. |
| Shared Package | |
| ML20003C754 | List: |
| References | |
| NUDOCS 8103180204 | |
| Download: ML20003C753 (2) | |
See also: IR 05000289/1980031
Text
.
_.
_
_
,
er
.,k[
g
UNITED STATES
'k
NUCLEAR REGULATORY COMMis5,:ON
f -l )h I,
REGION I
3g,
- e
sai paax avenue
g
j
muc o,
aussia. eesusuva~ia i,*.
2 0 JAN 1091
p
@.
Docket No. 50-289
N/
79
IMg j g ISB
Metropolitan Edison Company
ATTN: Mr. H. D. Hukill
t-
u.s.Dyguro/ s ;
Vice President and Director of TMI-1
A
m
,, @
P. O.' Box 480
.
$
Middletown, Pennsylvania 17057
/
fd.
Gentlemen:
Subject:
Inspection 50-289/80-31
This refers to the routine inspection conducted by Mr. A. D. Sassani, Jr. of
this office on December 16-19, 1980 of activities authorized by NRC License No.
DPR-50 and to the discussions of our findings held by Mr. Sassani with Mr. L.
Zubey of your staff at the conclusion of the inspection.
Areas examined during this inspection are described in the Office of Inspection
and Enforcement Inspection Report which is enclosed with this letter.
Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and cbservations by the
inspector.
Within the scope of this inspection, no items of noncompliance were observed.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclosed inspection
report will be placed in the NRC's Public Document Room.
If this report contains
any information that you (or your contractor) believe to be proprietary, it is
,
necessary that you make a written application within 20 days to this office to
!
-withhold such information from public disclosure. Any such application must be
l
accompanied by an affidavit executed by the owner of the information, which
l
identifies the document or part sought to be withheld, and which contains a
statement of reasons which addresses with specificity the items which will be
considered by the Coninission as listed in subparagraph (b) (4) of Section 2.790.
The information sought to be withheld shall be incorporated as far as possible
into a separate part of the affidavit.
If we do not hear from you in this
regard within the specified period, the report will be placed in the Public
Document Room.
8108180 M
.
=g
er
-v
,m.
v
-,
.
%
Metropolitan cdison Company
2
No reply to this letter is required; however, should you have any questions
concerning this inspection, we will be pleased to discuss them with you.
Sincerely,
_
.
- f
+
.obert T. Car son, Chief
Reactor Construction and Engineering
Support Branch
Enclosure: Office of Inspection and Enforcement Inspection
Report Number 50-289/80-31
cc w/ encl:
R. J. Toole, Manager, TMI-1
L. W. Harding, TMI-1 Licensing Supervisor
E. G. Wallace, PWR Licensing Manager
l
L. Zubey, Construction Manager
B. Ballard, QA Modifications / Operations Manager
J. B. Liberman, Esquire
G. F. Trowbridge, Esquire
Ms. Mary V. Southard, Chairperson, Citizens for a Safe Environment (Without
i
!
Report)
l'
,
,
I
(
.
eeas
e
c
y
e
-
T r
~*w'-