ML20003C753

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-289/80-31 on 801216-19.No Noncompliance Noted
ML20003C753
Person / Time
Site: Crane Constellation icon.png
Issue date: 01/20/1981
From: Robert Carlson
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Hukill H
METROPOLITAN EDISON CO.
Shared Package
ML20003C754 List:
References
NUDOCS 8103180204
Download: ML20003C753 (2)


See also: IR 05000289/1980031

Text

.

_.

_

_

,

er

.,k[

g

UNITED STATES

'k

NUCLEAR REGULATORY COMMis5,:ON

f -l )h I,

REGION I

3g,

- e

sai paax avenue

g

j

muc o,

aussia. eesusuva~ia i,*.

2 0 JAN 1091

p

@.

Docket No. 50-289

N/

79

IMg j g ISB

Metropolitan Edison Company

ATTN: Mr. H. D. Hukill

t-

u.s.Dyguro/ s ;

Vice President and Director of TMI-1

A

m

,, @

P. O.' Box 480

.

$

Middletown, Pennsylvania 17057

/

fd.

Gentlemen:

Subject:

Inspection 50-289/80-31

This refers to the routine inspection conducted by Mr. A. D. Sassani, Jr. of

this office on December 16-19, 1980 of activities authorized by NRC License No.

DPR-50 and to the discussions of our findings held by Mr. Sassani with Mr. L.

Zubey of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the Office of Inspection

and Enforcement Inspection Report which is enclosed with this letter.

Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and cbservations by the

inspector.

Within the scope of this inspection, no items of noncompliance were observed.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document Room.

If this report contains

any information that you (or your contractor) believe to be proprietary, it is

,

necessary that you make a written application within 20 days to this office to

!

-withhold such information from public disclosure. Any such application must be

l

accompanied by an affidavit executed by the owner of the information, which

l

identifies the document or part sought to be withheld, and which contains a

statement of reasons which addresses with specificity the items which will be

considered by the Coninission as listed in subparagraph (b) (4) of Section 2.790.

The information sought to be withheld shall be incorporated as far as possible

into a separate part of the affidavit.

If we do not hear from you in this

regard within the specified period, the report will be placed in the Public

Document Room.

8108180 M

.

=g

er

-v

,m.

v

-,

.

%

Metropolitan cdison Company

2

No reply to this letter is required; however, should you have any questions

concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

_

.

  1. f

+

.obert T. Car son, Chief

Reactor Construction and Engineering

Support Branch

Enclosure: Office of Inspection and Enforcement Inspection

Report Number 50-289/80-31

cc w/ encl:

R. J. Toole, Manager, TMI-1

L. W. Harding, TMI-1 Licensing Supervisor

E. G. Wallace, PWR Licensing Manager

l

L. Zubey, Construction Manager

B. Ballard, QA Modifications / Operations Manager

J. B. Liberman, Esquire

G. F. Trowbridge, Esquire

Ms. Mary V. Southard, Chairperson, Citizens for a Safe Environment (Without

i

!

Report)

l'

,

,

I

(

.

eeas

e

c

y

e

-

T r

~*w'-