Text
WW
.
.
M
4t
UNITED STATES
q
g
~*4
NUCLEAR REGULATORY COMMISSION
f
REClONI
- * .
f
631 PARK AVENUE
E
s,
MING OF PRUS$l A. PENNSYLVANI A 39406
+...*
/h
Docket No. 50-271
/0/
NA
g",#eR[/h%
Vermont Yankee Nuclear Power Corporation
E4
'
'
/
% *6 %
c!
ATTN:
Mr. Robert L. Smith
~
&
/
Licensing Engineer
ekjg,d 's
{
1671 Worcester Road
M
'
Framingham, Massachusetts 01701
ODjp
h
Gentlemen:
Subject:
Inspection No. 50-271/81-01
-
This refers to the routine inspection conducted by Mr. S. D. Reynolds, Jr. of
this office on January 3-5, 1981, at Vermont Yankee Nuclear Power Station,
Vernon, Vermont of activities authorized by NRC License No. DPR-28 and to the
discussions of our findings held by Mr. S. D. Reynolds, Jr. with Mr. Warren
Murphy of your staff at the conclusion of the inspection.
.
Areas examined during this inspection are described in the Office of Inspection
and Enforcement Inspection Report which is enclosed with this letter.
Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observations by the
inspector.
Within the scope of this inspection, no items of noncompliance were observed.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If this
report contains any information that you (or your centractor) believe to be
proprietary, it is necessary that you make a written application within 20 days
to this office to withhold such information from public disclosure.
Any such
application must be accompanied by an affi; davit executed by the owner of the
information, which identifies the document or part sought to be withheld, and
which contains a statement of reasons which addresses with specificity the items
which will be considered by the Commission as listed in subparagraph (b) (4) of
i
Section 2.790. The information sought to be withheld shall be incorporated as
far as possible into a separate part of the affidavit.
If we do not hear from
'
you in this regard within the specified period, the report will be placed in the
Public Document Room.
!
I
i-
L
8.10318009L
Q
.
r
L
.
.
Vermont Yankee Nuclear Power Corporation 2
No reply to this letter is required; however, should you have any questions
concerning this inspection, we will be pleased to discuss them with you.
Sincerely,
.
[/
w.
2
-
Robert . Carlson, blef
Reactor Constructica and Engineering
Support Branch
Enclosure:
Office of Inspection and Enforcement Inspection
Report No. 50-271/81-01
cc w/ enc 1:
Mr. Warren P. Murphy, Plant Superintendent
Mr. W. F. Conway, Vice President and Manager of Operations
Mr. J. E. Griffin, President
Mr. L. H. Heider, Vice President
l
l
.