Update to 800929 Final Deficiency Rept Re Cutler-Hammer Motor Control Ctrs.Requests Extension of Time to Complete Repairs from 810227 to 810601.Revised Final Rept Expected by 810313
ML20003C684
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 02/26/1981
From: Davidson D
CLEVELAND ELECTRIC ILLUMINATING CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
NUDOCS 8103090599
Download: ML20003C684 (1)


Text

-

P o. Box 5000 e CLEVELANo, OHIO 44101 e TELEPHONE (216) 622-9800 e ILLUMINATING BLoG.

e 55 PUBLICSoVARE Daiwyn R. Davidson viCE PRESICENT Sv5 TEM ENGINEEmiNG AND CcNSTAUCflCN f

February 26, 1981 t

l Mr. James G. Keppler

^

Director, Region III Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission

[

799 Roosevelt Road Glen Ellyn, Illinois 60137

Dear Mr. Keppler:

Perry Nuclear Power Plant l

Extension for Completion of Repairs to Motor Control Centers This letter requests an extension for the completion of repairs

[

to deficient Cutler-Hammer motor control centers.

l The Perry Nuclear Power Project had committed to the NRC, in a final report dated September 29, 1980, to complete these repairs by February 27, 1981. The repair of motor control centers will now be completed by June 1,1981. A revised final report will be submitted by March 13, 1981.

These items were discussed with Mr. Leonard McGregor of the NRC, Region III, in a telephone conversation on February 26, 1981.

Very truly yours, 5.

nb,; jff

't?L Dalwyn R. Davidson Vice President System Engineering and Construction i

DRD: bas cc: Mr. Jack Hughes, NRC Resident Inspect:or, PNPP q

-Mr. Victor Stello, Director, Office of Inspection

' 3 and Enforcement, USNRC, Washington, D.C. 2055.*

U.S. Nuclear Regulatory Commission, c/o Document Mat.agement Branch, Washington, D.C.

20553

)