msau, e Initial Written 4/10/7/

Occurrence; 1000 Report'Date: __

OYS*ER CREEK HUCLEAR GENERATING STATION FORKED RIVER, NEW JERSEY 08731 Abnomal Occurrence Report No. 50-219/74/24 IDEITTIFICATION Violation of the Technical Specifications, paragraph 4.6.B.I.g, OF OCCURRENCE:

in that the stack gas particulate filter in service frco MarcJr 28, 1974 to inirch 31, 1974 wcs not analyzed for gross B, gross a, and gross y.

This event is considered to be an abnomal occurrence as de-fined in the Technical Specifications, paragraph 1.15G; ODNDITIONS PRIOR Routine Shutdv.m TO CCCURRENCE: X Steady State Power r l{ot Stcndby Cperation load Chanycs Curing Cold Shutdown Routine Power Operr.tjon Refueling Shutdown Routine Startup _, Other (Specify)

Operation The major plant parz=eters at the tine of the event were as follows:

Power: Reactor,1806 M(t

  • Elcetrical, 632 lue Flow: Rocirc. , 57.2 x 10 0 lb/hr Feedt ater, 6.735 x 166 lb/hr l Stack Gis: 35,000 yCi/sec

.h}' y- >

DESCRIPTION 0F OCCURPINCE:

A stack gas particulate filter, insta11ed at 0847 on March 28, 1974 and recoved at 0854,on March 31, 1974, was not counted i.

for gross o, gross B, and gross y yithin one week of removal.

i POOR:0RIGINAL

Report h'oo >2W/ W ,

Nj s

.,- .l .

APPAPa.T CAtlSS '

Procedure

__ Design OP OCCUPJm1G:

Manufacture .thusual Service Condition ,

I

- Installation / Inc. Environ = ental

,- Construction ,

, (brponent.Failuro l

. Operator .__ Other (Specify)

.t s  :

Counting pf the filter'45 hour5.208333e-4 days <br />0.0125 hours <br />7.440476e-5 weeks <br />1.71225e-5 months <br />'s;after renoval wa. not perfomed by the technician as required. Investigation into the cause is continuing. , .

4 s

  1. 4ALYSIS OF OCCURPaiG:

The safety significance connected with this occurrence is that any unusually large release of particulate activity during this period night not have been recognized until the conthly corpo-site analyses were complete. This i.s not a likely possibility as a spectne analysis was perforced to neasure releases of short-lived isotopes and if unusually large amounts of activity In addition,

-woro present, it would have been readily apparent.

a spectrum analysis of the charcoal filter had also been per-forned and norcal quantitics of Iodine were found.

COPECTIVE ,

ACTION: " = particulate filter was counted nine days after filter re-

~ upon discovery of the abnormal occurrence. The gross a, j

gro, p, and gross y values were companble to stcples recoved before and after this filter. lhis would indicate that there l

l was little or no change in plant gasecus effluents and that the l

plant was operating with releases less than 4% of the Technic .

~

~

P00R.0RIGINAL 1

Specification linit of 4 pC1/see of Ico.ao and particula cs having half-lives >8 days, e

e i

6 'k i

-t

s '$-

5.,' '

%, ' I- ' .

i /, -

', } 1 t

.* s

  • g' ,

/

- ( , (

a,

'i. ,

t e

. p

, e 4" 8

0 m

. h epared by: , / yA: qs/-.-e.d' y,s, _

Date: 4/10/74 t

.- i s

h S

e G

4 k

i i l  !

P00R ORIGINAL I i i

, -