ML20003C074
ML20003C074 | |
Person / Time | |
---|---|
Site: | FitzPatrick |
Issue date: | 02/20/1981 |
From: | Bayne J POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK |
To: | |
Shared Package | |
ML19350A186 | List: |
References | |
NUDOCS 8102260570 | |
Download: ML20003C074 (1) | |
Similar Documents at FitzPatrick | |
---|---|
Category:OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING
MONTHYEARJAFP-99-0278, Application for Amend to License DPR-59,providing Rev C to Proposed TS Change Converting Current TSs to Improved Standard Tss.Withdrawal of JPTS-95-004,proposed TS Changes Re Inservice Leak & Hydrostatic Testing Operation,Reflected1999-10-14014 October 1999
[Table view]Application for Amend to License DPR-59,providing Rev C to Proposed TS Change Converting Current TSs to Improved Standard Tss.Withdrawal of JPTS-95-004,proposed TS Changes Re Inservice Leak & Hydrostatic Testing Operation,Reflected JAFP-99-0279, Correction to 980226 Application for Amend to License DPR-59,revising Ref 19 to Assume 90% SBGT Sys Charcoal Efficiency,Instead of 99%.Ref 19 on TS Page 285 Needs to Be Changed from Rev 0 to Rev 1,based on Revised Calculation1999-10-14014 October 1999 Correction to 980226 Application for Amend to License DPR-59,revising Ref 19 to Assume 90% SBGT Sys Charcoal Efficiency,Instead of 99%.Ref 19 on TS Page 285 Needs to Be Changed from Rev 0 to Rev 1,based on Revised Calculation ML20216J8321999-09-29029 September 1999 Application for Amend to License DPR-59,proposing Change to TS 3.5.B.3 & Associated Bases.Change Extends LCO for RHRSW Sys from 7 Days to 11 Days with Special Conditions to Allow for Installation of Mod to Division a RHRSW Strainer ML20196F5931999-06-22022 June 1999 Application for Amend to License DPR-59,changing to Pressure Temp limits.Pressure-temp Curves & Associated LCO & Bases Changes Included in Proposed Amend ML20195B8741999-06-0101 June 1999 Revised Application for Amend to License DPR-59,converting Plant CTS to Be Consistent with Improved Std TS in NUREG-1433,Rev 1,dtd Apr 1995 ML20206U1351999-05-19019 May 1999 Application for Amend to License DPR-59,requesting 14 Day AOT for EDG Sys ML20205K1041999-04-0505 April 1999 Application for Amend to License DPR-59,removing Position Title of General Manager from Sections & Will State That If Site Executive Officer Is Unavailable,Responsibilities Will Be Delegated to Another Staff Member,In Writing ML20205D8271999-03-26026 March 1999 Application for Amend to License DPR-59,converting CTS to Be Consistent with Improved Std TS in NUREG-1433,Rev 1 ML20199H3511999-01-15015 January 1999 Application for Amend to License DPR-59,removing Local Power Range Monitor (LPRM) Signal Calibr Method from TS Table 4.1-2 JAFP-98-0385, Revised Application for Amend to License DPR-59,revising Design Features.Rev 7 to non-proprietary & Proprietary Versions of HI-971661, Licensing Rept for Reracking of Ja FitzPatrick SFP, Encl.Proprietary Info Withheld1998-12-0303 December 1998 Revised Application for Amend to License DPR-59,revising Design Features.Rev 7 to non-proprietary & Proprietary Versions of HI-971661, Licensing Rept for Reracking of Ja FitzPatrick SFP, Encl.Proprietary Info Withheld ML20236X7811998-08-0303 August 1998 Application for Amend to License DPR-59,proposing Rev to Note Which Will Allow TS Section 1.1.A Re SLMCPR to Be Applicable During Cycle 14 ML20236M6151998-07-10010 July 1998 Application for Amend to License DPR-59 to Relocate Portions of TS 3/4.6.C, RCS - Coolant Chemistry, from TS to UFSAR & Applicable Plant Procedures Controlled by 10CFR50.59 Process ML20236L2741998-07-0606 July 1998 Application for Amend to License DPR-59,amending Tech Specs Section 3.5.b.1 Re Main Condenser Steam Jet Air Ejector & Table 3.10-1 Re Radiation Monitoring Sys That Initiates &/Or Isolates Sys ML20249B1551998-06-16016 June 1998 Application for Amend to License DPR-59,relocating Safety Review Committee Review,Audit & Related Record Keeping Requirements from Tech Specs to Chapter 17 of Fsar,Per Administrative Ltr 95-06 ML20217K0361998-03-30030 March 1998 Application for Amend to License DPR-59,changing Interval of Selected LSFT from Semiannually to Once Per 24 Months & Revising Definition of LSFT to Be Consistent w/NUREG-1433 ML20247F7791998-02-26026 February 1998 Application for Amend to License DPR-59,changing Allowable Containment Leakage Rate to 1.5 Percent Per Day & Assumed Value of Filter Efficiency for SBGT Used in Calculations to Determine Dose Effects to Onsite ML20202G8551998-02-0606 February 1998 Revised Application for Amend to License DPR-59,to Revise TS Tables 3.2-2 & 4.4-2,revising Allowed Outage Times for 4kV Emergency Bus Undervoltage Trip Functions & Replace Generic Actions for Inoperable Instrument Channels ML20202D5391998-02-0606 February 1998 Application for Amend to License DPR-59,allowing RCS Pressure Tests to Be Performed in Cold Shutdown Mode ML20202D3881998-02-0606 February 1998 Application for Amend to License DPR-59,revising RPS Normal Supply Electrical Protection Assembly Undervoltage Trip Setpoint as Result of Reanalysis Based on Most Limiting Min Voltage Requirements of Applied Loads ML20203J6671997-12-12012 December 1997 Application for Amend to License DPR-59,revising TS Section 6.2.2.6 Re Administrative Controls for Normal Working Hours of Plant Staff Who Perform Safety Related Functions ML20217H9801997-10-14014 October 1997 Application for Amend to License DPR-59,proposing Revision to TS Re Design Features Section,Including Revised Limits for Fuel Storage.Changes Correct Maximum Exposure Dependent, Infinite Lattice Multiplication Factor for Fuel Bundles ML20217G2991997-10-0808 October 1997 Application for Amend to License DPR-59,reflecting Change in LCO ML20140D8011997-04-14014 April 1997 Application for Amend to License DPR-59,deleting Plant Staff Performance Audit Requirement from Section 6.5.2.9.b & Incorporating Plant Staff Performance Review Requirement in Section 6.5.2.8 ML20135B1871996-11-26026 November 1996 Application for Amend to License DPR-59,requesting That Snubber Operability,Surveillance & Records Requirements in TS Be Relocated to Plant Controlled Documents ML20115G0581996-07-12012 July 1996 Application for Amend to License DPR-59,revising Min Critical Power Ratio Safety Limit ML20113B6261996-06-20020 June 1996 Application for Amend to License DPR-59,supporting Adoption of Primary Containment Leakage Rate Testing Requirements of Option B 10CFR50,App J at Plant ML20112D5661996-05-30030 May 1996 Application for Amend to License DPR-59,eliminating Selected Response Time Testing Requirements ML20112D1501996-05-30030 May 1996 Application for Amend to License DPR-59,revising Minimum Critical Power Ratio Safety Limit & Associated Basis ML20112D2671996-05-30030 May 1996 Application for Amend to License DPR-59,revising ATWS Recirculation Pump Trip Reactor Pressure ML20112B6411996-05-16016 May 1996 Application for Amend to License DPR-59,deleting Requirement for PORC to Review Fire Protection Program & Implementing Procedures.Addl Deletion of Insp & Audit Requirements of Specs 6.14.A & 6.14.B ML20108D1151996-04-24024 April 1996 Application for Amend to License DPR-59,supporting Adoption of Primary Containment Lrt Requirements of Option B to 10CFR50,App J & Clarifying Numerical Value of Allowable Containment Leakage Rate as 1.5% Per Day ML20107M4461996-04-24024 April 1996 Application for Amend to License DPR-59,relocating TS 3.11.B/4.11.B Crescent Area Ventilation & Associated Bases from TS to Controlled Procedure ML20101H6671996-03-27027 March 1996 Application for Amend to License DPR-59,adopting Primary Containment Lrt Requirements of Option B to 10CFR50,App J at Plant & Clarifies Numerical Value of Allowable Containment Lrt as 1.5% Per Day ML20101F8311996-03-22022 March 1996 Application for Amend to License DPR-59,revising TS to Implement BWROG Option I-D long-term Solution for Thermal Hydraulic Stability ML20101H3671996-03-22022 March 1996 Application for Amend to License DPR-59,changing TS Table 3.2-2, Core & Containment Cooling Sys Initiation & Control Instrumentation Operability Requirements ML20097A1921996-02-0101 February 1996 Application for Amend to License DPR-59,allowing RCS Pressure Tests to Be Performed While Remaining in Cold Shutdown Mode ML20100C2911996-01-25025 January 1996 Application for Amend to License DPR-59,revising Allowed out-of-service Times for Single Inoperable EDGs to Accommodate on-line Maint of EDGs ML20097J6661996-01-25025 January 1996 Application for Amend to License DPR-59,revising TS to Extend Instrumentation & Miscellaneous Surveillance Test Intervals to Support 24-month Operating Cycle ML20095F7051995-12-14014 December 1995 Application for Amend to License DPR-59,revising TSs to Incorporate IST Requirements of Section XI of ASME Boiler & Pressure Vessel Code JPN-95-051, Application for Amend to License DPR-59,proposing to Extend Surveillance Test Intervals for SLC Sys to Support 24 Month Operating Cycles1995-11-30030 November 1995 Application for Amend to License DPR-59,proposing to Extend Surveillance Test Intervals for SLC Sys to Support 24 Month Operating Cycles ML20094B6471995-10-25025 October 1995 Application for Amend to License DPR-59,revising TS Re Extensionof Containment Sys Surveillance Test Intervals to Accommodate 24 Month Operating Cycles ML20092H5341995-09-15015 September 1995 Application for Amend to License DPR-59,proposing TS by Extending Surveillance Test Intervals for Auxiliary Electrical Sys to Support 24 Month Operating Cycles ML20086P6421995-07-21021 July 1995 Application for Amend to License DPR-59.Amend Would Replace title-specific List of Members on PORC W/More General Statement of Membership Requirements ML20085G3561995-06-15015 June 1995 Application for Amend to License DPR-59,proposing Changes to Ts,By Extending Surveillance Test Intervals for Control Rod Sys to Support 24 Month Operating Cycles ML20083M8081995-05-12012 May 1995 Application for Amend to License DPR-59,extending Surveillance Test Intervals for Esws to Support 24 Month Operating Cycles,Per GL 91-04 JPN-95-022, Application for Amend to License DPR-59.Amend Would Extend Surveillance Test Intervals for Nuclear Steam Supply Sys to Support 24 Month Operating Cycles1995-04-12012 April 1995 Application for Amend to License DPR-59.Amend Would Extend Surveillance Test Intervals for Nuclear Steam Supply Sys to Support 24 Month Operating Cycles JPN-95-011, Application for Amend to License DPR-59,to Extend Surveillance Test Intervals for Snubber Systems to Support 24 Month Operating Cycles1995-03-0202 March 1995 Application for Amend to License DPR-59,to Extend Surveillance Test Intervals for Snubber Systems to Support 24 Month Operating Cycles JPN-95-007, Application for Amend to License DPR-59,to Impose Operability & Surveillance Requirements for Rv Overfill Protection Instrumentation1995-02-22022 February 1995 Application for Amend to License DPR-59,to Impose Operability & Surveillance Requirements for Rv Overfill Protection Instrumentation JPN-94-065, Application for Amend to License DPR-59,revising TSs Re PORC Membership & Review Responsibilities1994-12-0202 December 1994 Application for Amend to License DPR-59,revising TSs Re PORC Membership & Review Responsibilities ML20076F4631994-10-0707 October 1994 Application for Amend to License DPR-59,changing TS Re Safety/Relief Valve Testing Requirements 1999-09-29 Category:TEXT-LICENSE APPLICATIONS & PERMITS MONTHYEARJAFP-99-0279, Correction to 980226 Application for Amend to License DPR-59,revising Ref 19 to Assume 90% SBGT Sys Charcoal Efficiency,Instead of 99%.Ref 19 on TS Page 285 Needs to Be Changed from Rev 0 to Rev 1,based on Revised Calculation1999-10-14014 October 1999
[Table view]Correction to 980226 Application for Amend to License DPR-59,revising Ref 19 to Assume 90% SBGT Sys Charcoal Efficiency,Instead of 99%.Ref 19 on TS Page 285 Needs to Be Changed from Rev 0 to Rev 1,based on Revised Calculation JAFP-99-0278, Application for Amend to License DPR-59,providing Rev C to Proposed TS Change Converting Current TSs to Improved Standard Tss.Withdrawal of JPTS-95-004,proposed TS Changes Re Inservice Leak & Hydrostatic Testing Operation,Reflected1999-10-14014 October 1999 Application for Amend to License DPR-59,providing Rev C to Proposed TS Change Converting Current TSs to Improved Standard Tss.Withdrawal of JPTS-95-004,proposed TS Changes Re Inservice Leak & Hydrostatic Testing Operation,Reflected ML20216J8321999-09-29029 September 1999 Application for Amend to License DPR-59,proposing Change to TS 3.5.B.3 & Associated Bases.Change Extends LCO for RHRSW Sys from 7 Days to 11 Days with Special Conditions to Allow for Installation of Mod to Division a RHRSW Strainer ML20196F5931999-06-22022 June 1999 Application for Amend to License DPR-59,changing to Pressure Temp limits.Pressure-temp Curves & Associated LCO & Bases Changes Included in Proposed Amend ML20195B8741999-06-0101 June 1999 Revised Application for Amend to License DPR-59,converting Plant CTS to Be Consistent with Improved Std TS in NUREG-1433,Rev 1,dtd Apr 1995 ML20206U1351999-05-19019 May 1999 Application for Amend to License DPR-59,requesting 14 Day AOT for EDG Sys ML20205K1041999-04-0505 April 1999 Application for Amend to License DPR-59,removing Position Title of General Manager from Sections & Will State That If Site Executive Officer Is Unavailable,Responsibilities Will Be Delegated to Another Staff Member,In Writing ML20205D8271999-03-26026 March 1999 Application for Amend to License DPR-59,converting CTS to Be Consistent with Improved Std TS in NUREG-1433,Rev 1 ML20199H3511999-01-15015 January 1999 Application for Amend to License DPR-59,removing Local Power Range Monitor (LPRM) Signal Calibr Method from TS Table 4.1-2 JAFP-98-0385, Revised Application for Amend to License DPR-59,revising Design Features.Rev 7 to non-proprietary & Proprietary Versions of HI-971661, Licensing Rept for Reracking of Ja FitzPatrick SFP, Encl.Proprietary Info Withheld1998-12-0303 December 1998 Revised Application for Amend to License DPR-59,revising Design Features.Rev 7 to non-proprietary & Proprietary Versions of HI-971661, Licensing Rept for Reracking of Ja FitzPatrick SFP, Encl.Proprietary Info Withheld ML20236X7811998-08-0303 August 1998 Application for Amend to License DPR-59,proposing Rev to Note Which Will Allow TS Section 1.1.A Re SLMCPR to Be Applicable During Cycle 14 ML20236X5831998-07-29029 July 1998 Amend 245 to License DPR-59,consisting of Changes to TS in Response to Application Transmitted by ,Requesting Rev of Reactor Protection Sys Normally Supply Electrical Protection Assembly Undervoltage Trip Setpoint ML20236M6151998-07-10010 July 1998 Application for Amend to License DPR-59 to Relocate Portions of TS 3/4.6.C, RCS - Coolant Chemistry, from TS to UFSAR & Applicable Plant Procedures Controlled by 10CFR50.59 Process ML20236L2741998-07-0606 July 1998 Application for Amend to License DPR-59,amending Tech Specs Section 3.5.b.1 Re Main Condenser Steam Jet Air Ejector & Table 3.10-1 Re Radiation Monitoring Sys That Initiates &/Or Isolates Sys ML20249B1551998-06-16016 June 1998 Application for Amend to License DPR-59,relocating Safety Review Committee Review,Audit & Related Record Keeping Requirements from Tech Specs to Chapter 17 of Fsar,Per Administrative Ltr 95-06 ML20217K0361998-03-30030 March 1998 Application for Amend to License DPR-59,changing Interval of Selected LSFT from Semiannually to Once Per 24 Months & Revising Definition of LSFT to Be Consistent w/NUREG-1433 ML20247F7791998-02-26026 February 1998 Application for Amend to License DPR-59,changing Allowable Containment Leakage Rate to 1.5 Percent Per Day & Assumed Value of Filter Efficiency for SBGT Used in Calculations to Determine Dose Effects to Onsite ML20202G8551998-02-0606 February 1998 Revised Application for Amend to License DPR-59,to Revise TS Tables 3.2-2 & 4.4-2,revising Allowed Outage Times for 4kV Emergency Bus Undervoltage Trip Functions & Replace Generic Actions for Inoperable Instrument Channels ML20202D3881998-02-0606 February 1998 Application for Amend to License DPR-59,revising RPS Normal Supply Electrical Protection Assembly Undervoltage Trip Setpoint as Result of Reanalysis Based on Most Limiting Min Voltage Requirements of Applied Loads ML20202D5391998-02-0606 February 1998 Application for Amend to License DPR-59,allowing RCS Pressure Tests to Be Performed in Cold Shutdown Mode ML20203J6671997-12-12012 December 1997 Application for Amend to License DPR-59,revising TS Section 6.2.2.6 Re Administrative Controls for Normal Working Hours of Plant Staff Who Perform Safety Related Functions ML20217H9801997-10-14014 October 1997 Application for Amend to License DPR-59,proposing Revision to TS Re Design Features Section,Including Revised Limits for Fuel Storage.Changes Correct Maximum Exposure Dependent, Infinite Lattice Multiplication Factor for Fuel Bundles ML20217G2991997-10-0808 October 1997 Application for Amend to License DPR-59,reflecting Change in LCO ML20140D8011997-04-14014 April 1997 Application for Amend to License DPR-59,deleting Plant Staff Performance Audit Requirement from Section 6.5.2.9.b & Incorporating Plant Staff Performance Review Requirement in Section 6.5.2.8 ML20135B1871996-11-26026 November 1996 Application for Amend to License DPR-59,requesting That Snubber Operability,Surveillance & Records Requirements in TS Be Relocated to Plant Controlled Documents ML20115G0581996-07-12012 July 1996 Application for Amend to License DPR-59,revising Min Critical Power Ratio Safety Limit ML20113B6261996-06-20020 June 1996 Application for Amend to License DPR-59,supporting Adoption of Primary Containment Leakage Rate Testing Requirements of Option B 10CFR50,App J at Plant ML20112D2671996-05-30030 May 1996 Application for Amend to License DPR-59,revising ATWS Recirculation Pump Trip Reactor Pressure ML20112D1501996-05-30030 May 1996 Application for Amend to License DPR-59,revising Minimum Critical Power Ratio Safety Limit & Associated Basis ML20112D5661996-05-30030 May 1996 Application for Amend to License DPR-59,eliminating Selected Response Time Testing Requirements ML20112B6411996-05-16016 May 1996 Application for Amend to License DPR-59,deleting Requirement for PORC to Review Fire Protection Program & Implementing Procedures.Addl Deletion of Insp & Audit Requirements of Specs 6.14.A & 6.14.B ML20107M4461996-04-24024 April 1996 Application for Amend to License DPR-59,relocating TS 3.11.B/4.11.B Crescent Area Ventilation & Associated Bases from TS to Controlled Procedure ML20108D1151996-04-24024 April 1996 Application for Amend to License DPR-59,supporting Adoption of Primary Containment Lrt Requirements of Option B to 10CFR50,App J & Clarifying Numerical Value of Allowable Containment Leakage Rate as 1.5% Per Day ML20101H6671996-03-27027 March 1996 Application for Amend to License DPR-59,adopting Primary Containment Lrt Requirements of Option B to 10CFR50,App J at Plant & Clarifies Numerical Value of Allowable Containment Lrt as 1.5% Per Day ML20101F8311996-03-22022 March 1996 Application for Amend to License DPR-59,revising TS to Implement BWROG Option I-D long-term Solution for Thermal Hydraulic Stability ML20101H3671996-03-22022 March 1996 Application for Amend to License DPR-59,changing TS Table 3.2-2, Core & Containment Cooling Sys Initiation & Control Instrumentation Operability Requirements ML20097A1921996-02-0101 February 1996 Application for Amend to License DPR-59,allowing RCS Pressure Tests to Be Performed While Remaining in Cold Shutdown Mode ML20100C2911996-01-25025 January 1996 Application for Amend to License DPR-59,revising Allowed out-of-service Times for Single Inoperable EDGs to Accommodate on-line Maint of EDGs ML20097J6661996-01-25025 January 1996 Application for Amend to License DPR-59,revising TS to Extend Instrumentation & Miscellaneous Surveillance Test Intervals to Support 24-month Operating Cycle ML20095F7051995-12-14014 December 1995 Application for Amend to License DPR-59,revising TSs to Incorporate IST Requirements of Section XI of ASME Boiler & Pressure Vessel Code JPN-95-051, Application for Amend to License DPR-59,proposing to Extend Surveillance Test Intervals for SLC Sys to Support 24 Month Operating Cycles1995-11-30030 November 1995 Application for Amend to License DPR-59,proposing to Extend Surveillance Test Intervals for SLC Sys to Support 24 Month Operating Cycles ML20094B6471995-10-25025 October 1995 Application for Amend to License DPR-59,revising TS Re Extensionof Containment Sys Surveillance Test Intervals to Accommodate 24 Month Operating Cycles ML20092H5341995-09-15015 September 1995 Application for Amend to License DPR-59,proposing TS by Extending Surveillance Test Intervals for Auxiliary Electrical Sys to Support 24 Month Operating Cycles ML20086P6421995-07-21021 July 1995 Application for Amend to License DPR-59.Amend Would Replace title-specific List of Members on PORC W/More General Statement of Membership Requirements ML20085G3561995-06-15015 June 1995 Application for Amend to License DPR-59,proposing Changes to Ts,By Extending Surveillance Test Intervals for Control Rod Sys to Support 24 Month Operating Cycles ML20083M8081995-05-12012 May 1995 Application for Amend to License DPR-59,extending Surveillance Test Intervals for Esws to Support 24 Month Operating Cycles,Per GL 91-04 JPN-95-022, Application for Amend to License DPR-59.Amend Would Extend Surveillance Test Intervals for Nuclear Steam Supply Sys to Support 24 Month Operating Cycles1995-04-12012 April 1995 Application for Amend to License DPR-59.Amend Would Extend Surveillance Test Intervals for Nuclear Steam Supply Sys to Support 24 Month Operating Cycles JPN-95-011, Application for Amend to License DPR-59,to Extend Surveillance Test Intervals for Snubber Systems to Support 24 Month Operating Cycles1995-03-0202 March 1995 Application for Amend to License DPR-59,to Extend Surveillance Test Intervals for Snubber Systems to Support 24 Month Operating Cycles JPN-95-007, Application for Amend to License DPR-59,to Impose Operability & Surveillance Requirements for Rv Overfill Protection Instrumentation1995-02-22022 February 1995 Application for Amend to License DPR-59,to Impose Operability & Surveillance Requirements for Rv Overfill Protection Instrumentation JPN-94-065, Application for Amend to License DPR-59,revising TSs Re PORC Membership & Review Responsibilities1994-12-0202 December 1994 Application for Amend to License DPR-59,revising TSs Re PORC Membership & Review Responsibilities 1999-09-29 |
Text
- _ -_ -_ _ _ _.
O BEFORE Tile UNITED STATES
- NUCLEAR REGULATORY COMMISSION In the Matter of )
! )
POWER AUTHORITY OF TiiE STATE OF NEW YORK ) Docket No. 50-333
)
James A. FitzPatrick Nuclear Power Plant )
APPLICATION FOR AMENDMENT TO OPERATING LICENSE Pursuant to Section 50.90 of the regulations of the Nuclear Regulatory Commission, the Power Authority of the State of New York, as holder of Facility Operating License No. DPR-59, hereby applies for an Amendment to the Technical Specifications con-tained in Appendix A of this license.
The proposed changes to the James A. FitzPatrick Technical Specifications include the Table of Contents (page 1) and Sections 1.0 and 3.9 and propose new Sections 3.0 and 4.0.
These proposed changes result from the clarification of the term OPERABLE contained in the NRC letter dated April 10, 1980.
The proprsed changes to the Technical Specifications are presented
- ttachment I to this application. The Safety l
Evaluation <,rresponding to this change is included in Attachment II.
E POWER AUTilORITY OF Ti!E STATE OF NEW YORK 8102260 O
l By_ _ _ .
J. P. Bayne g Senior Vice President Subscribed anel sworn Nuclear Generation I to bgfore me :his ;today of &d wg , 1980. g g, upp Notary Public, State of New Yore g[ [ h - 0 No. 30 40G3428 i tNotar- o uglFcf en. Ji$$ft$ifcNErc$ 3N9Ak
,. _ - _ , __ ._._ __ . - _ _ _