ML20003B749

From kanterella
Jump to navigation Jump to search
PNS-I-81-004:on 810214,telephone Bomb Threat Received. Search Procedures Conducted W/Negative Results.No Further Action Anticipated
ML20003B749
Person / Time
Site: Pilgrim
Issue date: 02/17/1981
From: Bailey R, Joyner J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
References
PNS-I-81-004, PNS-I-81-4, NUDOCS 8102250432
Download: ML20003B749 (1)


Text

44m NA b

PRELXMINARY NOTIFICATION DCS No. 50293-810214 g

FEB 2 31981

  • u s, Am, p,,, ic!

Date:

February 17, 1981 g

PRE 8.IMINARY NOTIFICATION OF SAFEGUARDS EVENT--PNS-I-81-04 t

iminary notification constitutes EARLY notice of events of POSSIBLE

_ ETonal security or oublic interest significance.

The information cresented is as initially received without verification or evaluation and is basically all that is known by IE staff as of this date.

Facility: Boston Edison Company M/C Nuclear Pilgrim Unit 1 (DN 50-293)

Subject:

BOMB Ti.'REAT At 1:05 AM, February 14, 1981, the Main Gate received a call from a female subject.

During the call, mus-ic and laughter could be heard in the background.

The caller stated that "there was-a bomb under your bed."

Some additional laughter was heard and then the caller hung up.

Search procedures were conducted and completed with negative results at approximately 2:00 AM.

The media has no knowledge of the incident as indicated above.

No press release is planned by the licensee or by the NRC at this time.

The licensee notified Federal Law-Enforcement authorities.

Local and State Law Enforcement authorities are only notified if something is found.

This preliminary notification is issued for information and no further action by IE is anticipated.

NRC Region I (Philadelphia) received notification of this occurrence from the H00 at approximately 1:25 Ali, February 14, 1981. The information was updated and is current as of February 17, 1981 at 9:50 AM.

Contact:

R. Bailey 488-1355 J. Joyner 488-1224 DISTRIBUTION:

(Facsimile Transmission Times Noted)

H ST BLDG

/L70 MARYLAND NATIONAL IE:TAS

/LZ5

/J,Sy NRC/TMI Program Chairman Ahearne BANK BUILDING Commissioner Gilinsky W. J. Dircks, E00 Office

/. A 0 Commissioner Bradford C. Michelson, AE00 i

Commissioner Hendrie J. J. Fouchard, PA Region Ir

// M ACRS N. M. Haller, MPA Region III fafc/

S. J. Chilk, SECY G. W. Kerr, OSP

' Region IV _ f Aqs C. C. Kammarer, CA H. K. Shapar, ELD Region V

/ ' s s' WILLSTE BLOG $ */d RI Resident Sites J. G. Davis, NMSS d@/ u '/

/f 5d PHILLIPS BLOG /d,' 8[

R. B. Minogue, RES

/

/

H. R. Denton, NRR R. H. Vollmer, NRR LANOCW BLDG (Fax by HQ)

(MAIL)

T. E. Murley, NRR (6 MIN /PAGE)

R. G. Smith, 50 D. F. Ross, NRR J. J. Cummings, OIri -

IE:TAS

0. Eisenhut, NRR

~

Occument Mgt. Br.

S.' H. Hanauer, NRR S. Ebbin, NSCC PREU MINARY NOTIFICATION Region I Form 83 od(f (Rev. January 1981)

S*I 8102 250 LQ

  • }}