ML20003B685

From kanterella
Jump to navigation Jump to search
Deficiency Rept Re Defective Coil Spools W/Ge Hfa Relays Per IE Info Notice 81-01.Util Plans to Replace Relays Regardless of Present Condition of Coils.Replacement Schedule Dependent Upon Availability of Relays from GE
ML20003B685
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 02/18/1981
From: Koester G
KANSAS GAS & ELECTRIC CO.
To: Seidle W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
10CDR-50.55E, 10CFR-050.55E, 10CFR-50.55E, IEIN-81-01, IEIN-81-1, KMLNRC-81-059, KMLNRC-81-59, NUDOCS 8102250191
Download: ML20003B685 (1)


Text

KANSAS GAS AND ELECTRIC COMPANf O L E N *d L ROEStfa v< e e*, tic,o %ct,an February 18, 1981 Mr. W.C.

Seidle, Chief Reactor Construction and Engineering Support Branch U.S. Nuclear Regulatory Commission Region IV 611 Rya'i Plaza Drive Suite 1000 Arlington, Texas 76012 KfENRC 81-059 Re:

Docket No. 50-482 Subj: 50. 55 (e) Report - General Electric HFA Relays NRC Information Notice 81-0)

Dear Mr. Seidle:

In December,1980, we received a letter from General Electric Co. (GE) which advised us that failures had been experienced with certain lexan coil spools supplied with their !!PA type relays.

Mr. ECreel advised Mr. WACrossman of this letter on December 23, 1980.

On January 15, Information Notice 81-01 was issued to advise the industry of this problem.

On February 4, Mr. ECreel advised Mr. Crossman that an investigation had been initiated to determine if any of the potentially defective coils were installed in safety-related relays at Wolf Creek, and that several of th - potentially defective coils had been found.

At this time an inspection to determine if the coils are cracked is not planned because we will replace the relays as recommmended by GE, regard-less of the present condition of the coils. Our schedule for replacing the coils will be dependent upon the availability of replacement relays from GE.

Please advise if you need additional information.

y Yours very truly, f(R ',k.

//

GLK:bhj cc: TVandel (NRC Site Inspector)

Director Inspecti.'n and Enforcement

,,p U.S. Nuclear Regulator'/ Commission 810 2 2 % R l Washington, D.C.

20555 g

Attach 15 copies 201 N Market -W<tuta, Kansas - Mad Address: PO Box 208 l Wichtta, Kansas 67201 - Telephone' Area Code (316) 2616451 b