Informs of Mods to Auxiliary Feedwater Sys.Vertical Gaps Between Nut & Bolt Sleeve Will Be Eliminated.Two Lateral Restraints Will Be Added to Horizontal Straight Run of 2 Inch Emergency Feedwater Pipe.Installation Expected 810315
ML20003B038
Person / Time
Site: Yankee Rowe
Issue date: 02/03/1981
From: Kay J
YANKEE ATOMIC ELECTRIC CO.
To: Crutchfield D
Office of Nuclear Reactor Regulation
References
FYR-81-17, NUDOCS 8102100252
Download: ML20003B038 (1)


Text

'" * "' ' ' ' * ' - * '

VLilEEE ATOL!iC ELECTRIC CuliPAllY r

x:;

F 2.C.2.1 1671 Worcester Road, frommgham, Mossuchusetts 01701 E

y5 FYR 81-17

, YANKEE ;:/

February 3,1981

[

~

o O

8 q-1 p

United States Nuclear Regulatory Commission C

'd i

bM

~

Washington, D. C.

20555 p.

FEB 0 9 M " ~d Attention:

Mr. Dennis M. Crutchfield, Chief 5

.f

~/

Operating Reactors Branch #5 Division of Licensing

/'

4

/

References:

(a)

License-No. DPR-3 (Docket No. 50-29)

Ll (b) USNRC Letter to YAEC dated December 11, 1980 (c)

YAEC Letter to USNRC dated January 31, 1981 (FYR 81-14)

Sub ject :

Modifications to the Auxiliary Feedwater System

Dear Sir:

In Refe*ence (b) you requested that we evaluate two-specific areas where upgrades coulo be made to increase the seismic capability of the auxiliary feedwater system. This letter is to inform you that our evaluation is complete and we will make the following modifications:

1)

The vertical gaps between-the nut and bolt sleeve attached to tanks TK-1 and TK-39 will be eliminated, and 2)

Two lateral restraints will be added to the horizontal straight run of 2 inch emergency feedwatur pipe located in the turbine building

-lower level.

Engineering design of these modifications is currently in progress and installation of the fixes is expected to be completed by mid March 1981.

Further evaluation of this and other-systems essential to decay heat Some

, removal will be undertaken as part of our seismic re-evaluation program.

results of our preliminary seismic analysis on essential piping systems were presented at our December 17, 1980 meeting and are documented in Reference (c).

If you have any questions, or desire additional information, please contact us.

Very truly yours, YANKEE ATOMIC ELECTRIC COMPANY J. A.'Kay Senior Engineer _-_ Licensing 81_0 21_0 0ffd,