Responds to IE Bulletin 80-18, Maint of Adequate Min Flow Through Centrifugal Charging Pump Following Secondary Side High Energy Line Rupture. Revised Dp Should Be 94.4 Psi
ML20003A969
Person / Time
Site: Crane Constellation icon.png
Issue date: 01/21/1981
From: Hukill H
METROPOLITAN EDISON CO.
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
IEB-80-18, LLL-004, NUDOCS 8102100135
Download: ML20003A969 (1)


Text

.--

.~.

Yb Metropolitan Edison Company gh Post Office Box 480 Middletown, Pennsylvania 17057 717 944-4041 Writer's Direct Dial Number January 21, 1981 L1L 004 Office of Inspection & Enforcement g

Attn:

B. H. Grier, Director p

Region I g

U. S. Nuclear Regulatory Commission 8{L, 3

l 631 Park Avenue King of Prussia, Pa.

19406 3 M S O 19 8 1 ".g e.q%[N k

Dear Sir:

s Three Mile Island Nuclear Station, Unit 1 (TMI-1) C> 4

/f Operating License No. DPR-50

~

Docket No. 50-289 IE Bulletin 80-18 Our previous response (October 16, 1980, TLL 481) to the subject bulletin concerning " Maintenance of Adequate Minimum, Flow Through Centrifical Charging Pumps Following Secondary Side High Energy Line Rupture" indicated an assumed DP of 50 psi across the core.

A letter from Babcock & Wilcox on this subject stated the assumed DP was incorrect for flows of 109%

to 110% of design Reactor Coolant System flow. The revised DP should be 94.4 psi. Therefore, paragraph e of our previous letter should be revised to indicate a 300' " cushion" vice the 400' " cushion".

This change does not affect the conclusions determined previously.

Sincerely, a

.t H. D.

' kill Director, TMI-l HDH:DGM: hah cc: