ML20003A786

From kanterella
Jump to navigation Jump to search
Requests Schedule of Drills & Exercises Re Emergency Preparedness Per 800819 Fr Notice.Implementation Required by 810401.Scenarios Must Be Provided Two Wks Prior to Each Exercise or Major Drill
ML20003A786
Person / Time
Site: FitzPatrick 
Issue date: 12/24/1980
From: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Pasternak R
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
References
NUDOCS 8102090039
Download: ML20003A786 (2)


Text

Y,;;Q,

. f mtauq[o

~.

3 (}\\ *g [ g UNITED STATES NUCLEAR REGULATORY COMMISSION 3

/ e REGION 1

? ?,

o 631 PARK AVENUE h

%; v /

KING OF PRUSSIA, PENNSYLVAN!A 19406

[.

u DEC 2 41980 co g

Docket No. 50-333 g,

n

=

Power Authority of the State of New York 5

ps James A. FitzPatrick Nuclear Power Plant f?>

ATTN:

Mr. R. J. Pasternak p

N Resident Manager P. O. Box 41 Lycoming, New York 13093 Gentlemen:

EMERGENCY PREPAREDNESS EXERCISES AND DRILLS As you are aware, the NRC published the Final Rule for emergency planning for both onsite and offsite preparedness in the Federal Register notice dated August 19, 1980 (45 FR 55402).

This rule became effective on November 3, 1980 with implementation required by April 1,1981 (except as provided in Section IV, p. 3 of Appendix E).

One requirement of this rule is for an exercise which tests the major elements of emergency preparedness plans and organizations (licensee, State, and local government), and their integrated response capability.

Each licansee with a nuclear power reactor operating license must conduct the required emergency exercise within one year from April 1, 1981.

Applicants for an operating license must complete the exercise prior to issuance of the operating license.

In order for the NRC to make an assessment of licensee implementation of this requireme t, we plan to observe these exercises.

Accordingly, you are requested tt 1) provide a schedule of crills and exercisc?

as soon as possible, and 2) provice scenarios two weeks prior to each exercise or major drill.

ibis information should be mailed to the Director, USNRC i

Region I, at the above address with a copy to:

Brian K. Grimes, Director Division of Emergency Preparedness Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C.

20555 If you desire additional information regarding this matter, please contact this office.

Your cooperation with us is appreciated.

l Sincerely, B

Grier Director CONTACT:

Dr. R. J. Bores, (215) 337-5250 8102000034* '

F

Power Authority of the State of 2

New York cc:

George T. Berry, President and Chief Operating Officer J. P. Bayne, Senior Vice President-Nuclear Generation C. M. Pratt, Assistant General Counsel G. M. Wilverding, Manager-Nuclear Licensing A. Klausmann, Director, Quality Assurance D. Halama, Site Quality Assurance Engineer J. F. Davis, Chairman, Safety Review Committee J. M. Makepeace, Director, Technical Engineering (Con Ed)

W. D. Hamlin, Assistant to Resident Manager (PASNY)

._