ML20003A655
| ML20003A655 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 01/22/1981 |
| From: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Hines E DETROIT EDISON CO. |
| References | |
| NUDOCS 8102040570 | |
| Download: ML20003A655 (1) | |
Text
-Q p uruq'o UNITED STATES
~,
8 NUCLEAR REGULATORY COMMISSION n
'E REGION lil o,
[
799 ROOSEVELT ROAD g*
GLEN ELLYN, ILLINOIS 60137 "JAN 2 21981 b'
Docket No. 50-341
- /)
The Detroit Edison Company s- @
ATTN:
Mr. Edward Hines, Assistant Vice President and Manager
- ' ' i,7 -f Quality Assurance
' 'l 2000 Second Avenue Detroit, MI 48226 Gentlemen:
I would like to request your assistance in a matter which we feel would help our office control correspondence related to 50.55(e) issues. As you knot, problems reported in accordance with the 10 CFR 50.55(e) provisions are communicated in several reports depending on the length of time required to resolve the items.
It would be very helpful to this office if your reports could be identified with a simple control number (i.e., 81-01, 81-02, etc.) compatible with your own administrative practices so that the tracking of all 50.55(e) reports related to the same problem could be made easier.
Your consideration in this matter would be greatly appreciated.
Sincerely,
(
9/)
~
/ James G. Kep r
- Director cc: Central Files Reproduction Unit hTC 20b AE0D Resident Inspector, RIII PDR Local PDR NSIC TIC Ronald Callen, Michigan Public Service Commission Eugene B. Thomas, Jr.,
Attorney 810 204 0 QD.
..