ML20003A576
| ML20003A576 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 12/29/1980 |
| From: | Odom R ALABAMA POWER CO. |
| To: | Collins P Office of Nuclear Reactor Regulation |
| References | |
| FNP-80-1591, NUDOCS 8102040315 | |
| Download: ML20003A576 (6) | |
Text
--.
f
.\\
A O'"
L e
g Alabama Power Q
the sournem electre sprem JAN2$N*$
El P. O. Drawer 470
%.c #asa W o" Ashford, AL 36312
~
U December 29, 1980 1
FNP-80-1591
- G U. S. Nuclear Regulatory Commission Mr. P. F. Collins, Chief Operator Licensing Branch 7920 Norfolk Avenue Bethesda, Maryland 20014
Dear Mr. Collins:
I hereby submit an application for a Reactor Operator's License to operate the controls of Units One and Two (1 & 2) Farley Nuclear Plant, Ashford, Alabama.
(3 The following information is presented in accordance with section l
C/
55.10 of Title 10 of Federal Regulations, part 55.
l l
1.
a.
Name:
Randy Paul Odom l
b.
Citizenship:
USA c.
Age:
22 l
l d.
Address:
1515 South Oates St., Dothan, AL 36301 1
e.
Present Employer and Address:
Alabama Power Company Farley Nuclear Plant P. O. Drawer 470 Ashford, Alabama 36312 f.
Job
Title:
Assistant Plant Operator - Nuclear 2.
a.
Formal Education:
1.
2 Qtrs., Emergency Medical Technician Training 2.
Houston County High School iO k
&10:04o3\\T
T
(~~)
b.
Pertinent Technical Training:
G' See Appendix A c.
Pertinent Experience:
I l
l See Appendix B l
i d.
Responsibility:
See Appendix C 3.
Serial Numbers of Previous Expiration NRC License:
N/A Date:
N/A 4.
This is an application for a Reactor Operator's License to operate Units One and Two (1 & 2) Farley Nuclear Plant, Ashford, Alabama.
t 5.
Evidence that I have learned to operate the controls in a competent and safe manner and that I have sufficient operating experience is certified in Mr. W. G. Hairston, III's letter dated December 29, 1980.
I l
6.
I have taken the required medical examination and the report, NRC-396, has been submitted.
/m
(
)
7.
In signing this application, I authorize the Nuclear Regulatory Commission to release the grades on each section of the examination l
to Alabama Power Company.
l Sincerely, 1
Randy Paul Odom RP0:mjk Enclosures 3 gs U
I i
l
APPENDIX A O
PERTINENT TECHNICAL TRAINING NAME:
Randy Paul Odom SUBJECT HOURS ATTENDED 100-90%
90-80%
80-70%
70-60%
1.
APCo Reactor Fundamentals X
Course 2.
APCo FNP Systems Course X
y 3.
System Qualification /
X 7
Startup Operation Support 4.
APCo Pre-License Review X
Series 5.
Westinghouse Simulator Refresher Training -
Option II 6.
Westinghouse Simulator Refresher Training -
Option III 7.
Westinghouse Simulator X
Refresher Training -
Option V 8.
U. S. Navy Nuclear Power School 9.
SIC Prototype Training I certify that the above information accurately represents the training received by the individual named above.
SIGNED MEm
' Training Supervisor APPROXIMATE NUMBER OF REACTOR STARTUPS AND SHUTDOWNS FACILIIY NUMBER 1.
Farley Nuclear Plant 2'
2.
Reactivity Manipulations at Farley Nuclear Plant 15 1
_a
]
APPENDIX B PERTINENT EXPERIENCE FROM TO Fossil Generation Experience Shift Foreman Plant Operator i
i Assistant Plant Operator Auxiliary Operator Laborer Engineer Other:
U. S. Navy Fossil Plants Plant Operator Nuclear Generation Experience Shift Supervisor Shift Foreman Plant Operator Assistant Plant Operator-1/79 Present Equipment Operator 6/78-0 79 Engineer Other:
Nuclear Operative 1/78 6/78 2
l i
APPENDIX B PERTINENT EXPERIENCE i
i U. S. Navy Nuclear Experience From To (Qualified Watch Statica)
Engineer Engineering Officer of Watch j
Engineering Watch Supervisor i
Reactor Operator Shutdown Maneuvering Area Engineroom Supervisor Electric Plant Control Panel Operator 4
Steam Plant Control Panel Operator Upper Level Machinery Room #2 i
Lower Level Machinery Room #2
()
Upper Level Engine Room I
l Lower Level Engine Room Engineering Laboratory Tech.
(
Shutdown Roving Watch l
Other:
i i
l i
l 3~
l l
APPENDIX C l.
RESPONSIBILITY 4
The Assistant Plant Operator-Nuclear:
i t
1.
Responsible to the Plant Operator for performance of assignments i-associated with shift operations and fuel handling.
+
l 2.
Duties normally associated with operation of auxiliary systems and equipment outside the main control room and will include rc,utine checks, ~ data acquisition, and local operation of equipment.
3.
Maintain satisfactory progress-towards qualification as Plant-f Operator.
1 i
4 i
i k
J f
t l
I i
4 l
1 i
W 4
l
?
. - -. -..... -..