| | | Reporting criterion |
|---|
| 05000271/LER-1980-001, Forwards LER 80-001/03L-0 | Forwards LER 80-001/03L-0 | |
| 05000271/LER-1980-002-03, /03L-0:on 800103,during Surveillance Testing of HPCI Sys,Turbine Tripped & HPCI Steam Valves Were Isolated. Latter Caused by Spurious High Steam Flow.Cause of Turbine Trip Not Determined.Sys Tested Monthly | /03L-0:on 800103,during Surveillance Testing of HPCI Sys,Turbine Tripped & HPCI Steam Valves Were Isolated. Latter Caused by Spurious High Steam Flow.Cause of Turbine Trip Not Determined.Sys Tested Monthly | |
| 05000271/LER-1980-002, Forwards LER 80-002/03L-0 | Forwards LER 80-002/03L-0 | |
| 05000271/LER-1980-003, Forwards LER 80-003/03L-0 | Forwards LER 80-003/03L-0 | |
| 05000271/LER-1980-003-03, /03L-0:on 800107,discovered That Air Sample Station 3.3 Was Not Drawing Continuous Sample.No Sample Obtained 791230-800107.Caused by Tygon Tube Being Disconnected from Gas Flow Meter to Air Sampling Head | /03L-0:on 800107,discovered That Air Sample Station 3.3 Was Not Drawing Continuous Sample.No Sample Obtained 791230-800107.Caused by Tygon Tube Being Disconnected from Gas Flow Meter to Air Sampling Head | |
| 05000271/LER-1980-004-03, /03L-0:on 800109,power Supply Overheated & Failed, Resulting in Loss of All Rod Position Indication,Rpis Alarm,All Rod Drift Alarms,Rwm Rod Block & Overtravel Alarm. Caused by Failure of Cooling Fan in Power Supply | /03L-0:on 800109,power Supply Overheated & Failed, Resulting in Loss of All Rod Position Indication,Rpis Alarm,All Rod Drift Alarms,Rwm Rod Block & Overtravel Alarm. Caused by Failure of Cooling Fan in Power Supply | |
| 05000271/LER-1980-004, Forwards LER 80-004/03L-0 | Forwards LER 80-004/03L-0 | |
| 05000271/LER-1980-005-03, /03L-0:on 800115,during Weekly Review of Surveillance Test Data,Discovered Time Limit for Total Max Combined Interval Exceeded by One Day for Oct 1979-Jan 1980 Period.Caused by Early Collection Prior to 1979 Refueling | /03L-0:on 800115,during Weekly Review of Surveillance Test Data,Discovered Time Limit for Total Max Combined Interval Exceeded by One Day for Oct 1979-Jan 1980 Period.Caused by Early Collection Prior to 1979 Refueling | |
| 05000271/LER-1980-005, Forwards LER 80-005/03L-0 | Forwards LER 80-005/03L-0 | |
| 05000271/LER-1980-006-01, /01T-0:on 800122,received Low Flow Alarm on Off Gas Sampling Sys.Flow Disturbance Rendered Both Radiation Monitors 17-150A & B Inoperable.Apparently Caused by Flow Blockage.Flow Increased,Clearing Blockage | /01T-0:on 800122,received Low Flow Alarm on Off Gas Sampling Sys.Flow Disturbance Rendered Both Radiation Monitors 17-150A & B Inoperable.Apparently Caused by Flow Blockage.Flow Increased,Clearing Blockage | |
| 05000271/LER-1980-006, Forwards LER 80-006/01T-0 | Forwards LER 80-006/01T-0 | |
| 05000271/LER-1980-007-03, /03L-0:on 800128,while Performing Surveillance Testing of HPCI Sys,Governor Valve Remained Shut After Turbine Was Shut Down W/Auxiliary Oil Pump Running.Caused by Actuator Sticking | /03L-0:on 800128,while Performing Surveillance Testing of HPCI Sys,Governor Valve Remained Shut After Turbine Was Shut Down W/Auxiliary Oil Pump Running.Caused by Actuator Sticking | |
| 05000271/LER-1980-007, Forwards LER 80-007/03L-0 | Forwards LER 80-007/03L-0 | |
| 05000271/LER-1980-008-03, /03L-0:on 800203,during Feb 1980 Shutdown,Shock Suppressor RR-2 Found W/No Visible Fluid Level in Sight Glass & Declared Visible Insp Failure.Cause of Leakage Unknown.Snubber Rebuilt & Tested Prior to Reinstallation | /03L-0:on 800203,during Feb 1980 Shutdown,Shock Suppressor RR-2 Found W/No Visible Fluid Level in Sight Glass & Declared Visible Insp Failure.Cause of Leakage Unknown.Snubber Rebuilt & Tested Prior to Reinstallation | |
| 05000271/LER-1980-008, Forwards LER 80-008/03L-0 | Forwards LER 80-008/03L-0 | |
| 05000271/LER-1980-009, Forwards LER 80-009/03L-0 | Forwards LER 80-009/03L-0 | |
| 05000271/LER-1980-009-03, /03L-0:on 800228,during Surveillance,Testing,Rhr Svc Water Pump P-8-1C Failed to Start.Caused by Broken Lead on Closing Coil in Circuit Breaker.Circuit Breaker Replaced | /03L-0:on 800228,during Surveillance,Testing,Rhr Svc Water Pump P-8-1C Failed to Start.Caused by Broken Lead on Closing Coil in Circuit Breaker.Circuit Breaker Replaced | |
| 05000271/LER-1980-010, Forwards LER 80-010/03L-0 | Forwards LER 80-010/03L-0 | |
| 05000271/LER-1980-010-03, /03L-0:on 800307,50-millisecond Value Used in GE Transient Analysis for Reactor Protection Sys Delay Time in Violation of Tech Specs.Tech Spec 3.1.A Will Be Revised | /03L-0:on 800307,50-millisecond Value Used in GE Transient Analysis for Reactor Protection Sys Delay Time in Violation of Tech Specs.Tech Spec 3.1.A Will Be Revised | |
| 05000271/LER-1980-011, Forwards LER 80-011/01P-0 | Forwards LER 80-011/01P-0 | |
| 05000271/LER-1980-011-01, /01P-0:on 800312,investigation of Onsite Power Distribution Sys Revealed Voltage for Continuous Operation of Some 480 Volt Sys Loads Below Min Required Voltage.Caused by Incomplete Analysis of Sys When Transformers Replaced | /01P-0:on 800312,investigation of Onsite Power Distribution Sys Revealed Voltage for Continuous Operation of Some 480 Volt Sys Loads Below Min Required Voltage.Caused by Incomplete Analysis of Sys When Transformers Replaced | |
| 05000271/LER-1980-012, Forwards LER 80-012/01T-0 | Forwards LER 80-012/01T-0 | |
| 05000271/LER-1980-012-01, /01T-0:on 800328,during Seismic Analysis Required by IE Bulletin 79-14,discovered That Pipe Supports RHR-H-83 & RSW-H-168 May Be Inadequate to Support Seismic Loads. Caused by Deviations from Hanger Design Details | /01T-0:on 800328,during Seismic Analysis Required by IE Bulletin 79-14,discovered That Pipe Supports RHR-H-83 & RSW-H-168 May Be Inadequate to Support Seismic Loads. Caused by Deviations from Hanger Design Details | |
| 05000271/LER-1980-013-03, /03L-0:on 800326,while Performing Surveillance Test on Hpci,Turbine Speed Would Not Increase Above 800 Rpm. Caused by Failure of Flow Controller.Flow Controller Was Replaced | /03L-0:on 800326,while Performing Surveillance Test on Hpci,Turbine Speed Would Not Increase Above 800 Rpm. Caused by Failure of Flow Controller.Flow Controller Was Replaced | |
| 05000271/LER-1980-013, Forwards LER 80-013/03L-0 | Forwards LER 80-013/03L-0 | |
| 05000271/LER-1980-014-03, /03L-0:on 800402,during Routine Reactor Startup, Operators Observed Frequency Drifting on Uninterrupted Ac Electrical Power sys-A.Caused by Setpoint Drift of Adjustable Frequency Potentiometer.Setpoint Readjusted | /03L-0:on 800402,during Routine Reactor Startup, Operators Observed Frequency Drifting on Uninterrupted Ac Electrical Power sys-A.Caused by Setpoint Drift of Adjustable Frequency Potentiometer.Setpoint Readjusted | |
| 05000271/LER-1980-014, Forwards LER 80-014/03L-0 | Forwards LER 80-014/03L-0 | |
| 05000271/LER-1980-015, Forwards LER 80-015/03L-0 | Forwards LER 80-015/03L-0 | |
| 05000271/LER-1980-015-03, /03L-0:on 800401,during pre-startup Testing of Recirculation Pump Discharge Valve V-2-53B,valve Would Not Open Fully.Caused by Loose Pinion Gear on Limitorque-type Smb Motor Operator.Pinion Gear Was Replaced | /03L-0:on 800401,during pre-startup Testing of Recirculation Pump Discharge Valve V-2-53B,valve Would Not Open Fully.Caused by Loose Pinion Gear on Limitorque-type Smb Motor Operator.Pinion Gear Was Replaced | |
| 05000271/LER-1980-016, Forwards LER 80-016/03L-0 | Forwards LER 80-016/03L-0 | |
| 05000271/LER-1980-016-03, /03L-0:on 800415,during Review of Surveillance Data,Quarterly Calibr of Main Steam Line Radiation Monitors Was Not Performed.Caused by Personnel Error Overlooking Weekly Check.Surveillance Schedule Revised | /03L-0:on 800415,during Review of Surveillance Data,Quarterly Calibr of Main Steam Line Radiation Monitors Was Not Performed.Caused by Personnel Error Overlooking Weekly Check.Surveillance Schedule Revised | |
| 05000271/LER-1980-017, Forwards LER 80-017/03L-0 | Forwards LER 80-017/03L-0 | |
| 05000271/LER-1980-017-03, /03L-0:on 800424,PCIS Valve FSO-109-76 Failed to Close When Stroked During Quarterly Tests.Caused by Accumulation of Dirt on Plunger Assembly.Valve Cleaned & Returned to Svc | /03L-0:on 800424,PCIS Valve FSO-109-76 Failed to Close When Stroked During Quarterly Tests.Caused by Accumulation of Dirt on Plunger Assembly.Valve Cleaned & Returned to Svc | |
| 05000271/LER-1980-018, Forwards LER 80-018/01P-0 | Forwards LER 80-018/01P-0 | |
| 05000271/LER-1980-018-01, /01P-0:on 800611,leakage Developed in Feedwater Line.Plant Shutdown to Cold Condition Initiated.Caused by Failure of Feedwater Check Valve Bonnet Seal.Seal Will Be Repaired Prior to Resuming Operation | /01P-0:on 800611,leakage Developed in Feedwater Line.Plant Shutdown to Cold Condition Initiated.Caused by Failure of Feedwater Check Valve Bonnet Seal.Seal Will Be Repaired Prior to Resuming Operation | |
| 05000271/LER-1980-019-01, /01T-0:on 800516,AEOG Rad Monitors 17-150 a & B Made Inoperative Under Controlled Conditions While Evaluating Augmented Offgas Sys (Aog) Recombiner Temps. Caused by Dihydrogen Recombination Before Aog Recombiner | /01T-0:on 800516,AEOG Rad Monitors 17-150 a & B Made Inoperative Under Controlled Conditions While Evaluating Augmented Offgas Sys (Aog) Recombiner Temps. Caused by Dihydrogen Recombination Before Aog Recombiner | |
| 05000271/LER-1980-019, Forwards LER 80-019/01T-0 | Forwards LER 80-019/01T-0 | |
| 05000271/LER-1980-020-03, /03L-0:on 800617,PCIS Valve FSO-109-76A Failed to Close After Scram.Caused by Dirt on Plunger Assembly.Valve Cleaned & Returned to Svc | /03L-0:on 800617,PCIS Valve FSO-109-76A Failed to Close After Scram.Caused by Dirt on Plunger Assembly.Valve Cleaned & Returned to Svc | |
| 05000271/LER-1980-020, Forwards LER 80-020/03L-0 | Forwards LER 80-020/03L-0 | |
| 05000271/LER-1980-021-03, /03L-0:on 800630,during Weekly Environ Air Sample Collections,Incomplete Samples Collected at Three Stations. Caused by Failed Pumps Due to Damaged Bearings.New Pumps Installed.Pump & Ventilation Mods Being Evaluated | /03L-0:on 800630,during Weekly Environ Air Sample Collections,Incomplete Samples Collected at Three Stations. Caused by Failed Pumps Due to Damaged Bearings.New Pumps Installed.Pump & Ventilation Mods Being Evaluated | |
| 05000271/LER-1980-021, Forwards LER 80-021/03L-0 | Forwards LER 80-021/03L-0 | |
| 05000271/LER-1980-022-03, /03L-0:on 800709,drywell Torus Was Reduced to Less than 1.7 Psid to Perform Vacuum Breaker Testing.Difficulty of Restoring 1.7 Psid Was Observed.Caused by Failure of Vacuum Breaker to Properly Seat.Breaker Was Manually Cycle | /03L-0:on 800709,drywell Torus Was Reduced to Less than 1.7 Psid to Perform Vacuum Breaker Testing.Difficulty of Restoring 1.7 Psid Was Observed.Caused by Failure of Vacuum Breaker to Properly Seat.Breaker Was Manually Cycled | |
| 05000271/LER-1980-022, Forwards LER 80-022/03L-0 | Forwards LER 80-022/03L-0 | |
| 05000271/LER-1980-023-03, /03L:on 800712,snubber RR-78 on Recirculating Pump Motor B Was Found to Have No Visible Fluid in Sight Glass & Failed to Lock Up within Procedural Tolerances When Tested. Caused by Fluid Leakage.Lenz Fittings Were Replaced | /03L:on 800712,snubber RR-78 on Recirculating Pump Motor B Was Found to Have No Visible Fluid in Sight Glass & Failed to Lock Up within Procedural Tolerances When Tested. Caused by Fluid Leakage.Lenz Fittings Were Replaced | |
| 05000271/LER-1980-023, Forwards LER 80-023/03L-0 | Forwards LER 80-023/03L-0 | |
| 05000271/LER-1980-024-03, /03L-0:on 800718,during Normal Operation,Control Room Personnel Reported UPS-1B Trouble & Loss of Voltage to MC-89B.Caused by Failed Logic Power Supply Board. Component Replaced & Unit Operationally Tested | /03L-0:on 800718,during Normal Operation,Control Room Personnel Reported UPS-1B Trouble & Loss of Voltage to MC-89B.Caused by Failed Logic Power Supply Board. Component Replaced & Unit Operationally Tested | |
| 05000271/LER-1980-024, Forwards LER 80-024/03L-0 | Forwards LER 80-024/03L-0 | |
| 05000271/LER-1980-025, Forwards LER 80-025/03L-0 | Forwards LER 80-025/03L-0 | |
| 05000271/LER-1980-025-03, /03L-0:on 800721,during Routine Surveillance Testing MS-DPIS-2-12OC Was Found W/Setpoint in Excess of Tech Spec.Caused by Setpoint Drift.Setpoint Readjusted & Operation Verified | /03L-0:on 800721,during Routine Surveillance Testing MS-DPIS-2-12OC Was Found W/Setpoint in Excess of Tech Spec.Caused by Setpoint Drift.Setpoint Readjusted & Operation Verified | |
| 05000271/LER-1980-026, Forwards LER 80-026/03L-0 | Forwards LER 80-026/03L-0 | |