ML20003A100

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-282/80-18 & 50-306/80-18 on 801119-20.No Noncompliance Noted
ML20003A100
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 12/18/1980
From: Heishman R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Gilberts D
NORTHERN STATES POWER CO.
Shared Package
ML20003A101 List:
References
NUDOCS 8101290567
Download: ML20003A100 (2)


See also: IR 05000282/1980018

Text

-

,

s'o,

.

,

UNITED STATES

y, .

gs

g

j

NUCLEAR REGULATORY COMMISSION

f

j

g

.

3d ' '

j

'

kj

c

REGION 111

O

.

o

799 ROOSEVELT ROAD

[3

%

'b

GLEN ELLYN,ILLINotS 60137

% . . . . 'g

-

JAN21198g

8

5

~

ty

v.3, nw %,

k

m us m

CEI.1 C I T

O

/.._. g'6

Docket No. 50-282

~--

docket No. 50-306

Northern States Power Company

ATTN:

Mr. Dennis E. Gilberts

Vice President

Power Production and

System Operation

414 Nicollet. Mall

Minneapolis, MN 55401

Gentlemen-

This refers to the inspection conducted by Messrs. N. C. Choules and

D. L. Robinson of this office on November 19-20, 1980, of activities at

Prairie Island Nuclear Generating Plant, Units 1 and 2, authorized by NRC

Operating Licenses No. DPR-42 and No. DPR-60 and to the discussion of our

findings with Mr. Tierney and others at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No items of noncompliance with NRC requirements were identified during

the course of-this inspection.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the

enclosed inspection report will be placed in the NRC's Public Document

Room, except as follows.

If this report contains information that you

or your contractors believe to be proprietary, you must apply in writing

to this office, within twenty-five days of the date of this letter, to

withhold such information from public disclosure. The application must

include a full statement of the reasons ~for which the information is

considered proprietary, and should be prepared so that propriatary

information identified in the application is contained in an enclosure

to the application.

810 1290 N

Q

f

.

Northern States Power

-2-

Company

We will gladly discuss any questions you have concerning this

inspection.

Sincerely,

f

F. Ileishman, Chief

Reactor Operations and

Nuclear Support Branch

Enclosure:

IE Inspection

Reports No. 50-282/80-18

and No. 50-306/80-18

cc w/ encl:

F. P. Tierney, Jr.,

Plant Manager

Central Files

Reproduction Unit NRC 20b

AEOD

Resident inspector, RIII

PDR

Local PDR

NSIC

TIC

John W. Ferman, Ph.D.,

Nuclear Engineer, MPCA