DOCKET HO. 50-321 "c2 i
l DATE 01-10-80 l
COMPLETED BY J.M.
KAMISHLIAH I
TELEPHONE ( 912 ) 367-7781 x 203
- 23 OPERATING STATUS
- o***********************eeeeeeeee*******eee.
- Hotes e
C3 q))])
- 1. Unit Hanes E.I. Hatch Huclear Plant Unit i e
e
- 2. Reporting Periods 12-80 e
e
- 3. Licensed Thernal Pouer (MWL)I 2436 e
e h!$$$
- 4. Haneplate Rating (Cross MWe): 809.3 ggj])
- 5. Design Electrical Rating (Het MWe) 777.3 e
e
- 6. Maxinun Dependable Capaci ty (Cross HWe): 796.3
- 7. Maxinun Dependable Capacity (Het MWe): 764.3
@y};3 8.
If Changes occur in capacity Ratings (Itens Number 3 Through 7) Since Last Report, CIve Reasons
- e. Pouer Level To Which Restricted, If Any (Het MWe): 640
- 10. Reasons For Restrictions, If;Any Managerent Limitations Dd3 0
This Month Yr.-to-Date Cunulative "DI~
i G
- 11. Hours In Reporting Period 744 8784 43848 up
- 12. Hunber Of Hours Reactor Was Critical 697.6 7714.0 33512.0 c4
- 13. Reactor Reserve Shutdoun Hours 0.0 0.0 0.0 r4
- 14. Hours Generator On-Line 647.1 7177.1 31445.4 CD
- 15. Unit Reserve Shutdoun Hours 0.0 0.0 0.0 r4
- 16. Cross Thernal Energy Generated (MWH) 1161296 15449847 65802832 QQ
- 17. Cross Electrical Energy C,enera te d ( MWH )
372110 5028710 21299650
- 18. Het Electrical Energy Generated (MWH) 352918 4790545 20252478
- 19. Unit Service Factor I
87.0 81.7 71.7 20 Unit Availability Factor!
E?.0 81.7 71.7
- 21. Unit Capacity Factor (Using MDC Het)
GJ.1 71.4 60.4
- 22. Unit Capacity Factor (Using DER Het) 61.0 70.2 59.4
- 23. Unit Forced Outage Rate 13.0 18.3 20.2 24 Shutdowns Scheduled Over~Hext 6 Months (Type. Date, and Duration of Each): Refueling; March 1; 13 weeks
- 25. If Shut Down At End of Report Period, Estinated Date of Startup
- 26. Units In Test Status (Prior to Connercial Opera c ion)
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
()
(9/77' v
v
9 CE$h$
AVERAGE DAILY UNIT PDUER LEVEL s
Y4 DOCKET HO. 50-321 (3 0F3 DATE 01-10-80 COMPLETED BY J.M.
KAMISHLIAM TELEPHONE (912) 367-7781 x 203 O
MONTH 12-80 bESb DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Het)
(MWe-Net)
({) 1 611 17 352 b 2 427 18 202 3 262 19 466 4 328 20 44 5* 543 21 437 6 601 22 589 7 602 23 606 3 606 24 605 9 609 25 610 10 609 26 605 11 244 27 602 12 234 28 593 13 25 29 600 14 288 30 607 15 585 31 606 14 607 (9/77) k V-g a
DOCKET NO. 50-321 UNIT SilUTDOWNS AND POWER REDUCTIONS UNIT N AME Hatch 1 i DATE l-10-81 COMPLETED BY J. f4. Knmichlian REPORT MONTil December TELEPHONE 912-367-/181 "g .I ~I "l ,EU Licensee Es ""t cause a corrective Action to }. M Event u N". Date E g Prevent Recurrence go h, s1 jpg Report
- E f
N 82 801202 F 4 A 5 NA IIA GENERA Load reduced because of gen. ground fault alarm 83 801202 F 6.4 A 1 NA IIA CENERA Unit off line to investigate ground fault alann in #80-82 84 801203 F 16.5 A 5 NA IIA GENERA Unit on'startup from above shutdown
- 80-83 85 801203 F
41 A 5 NA IlF HTEXCil Load reduced because of tube leak in waterbox "C" 86 801205 S 38 F 5 NA ZZ ZZZZZZ Management limitation of 80% thennal power 87 801207 5 3 8 5 NA IIE TURBIN Reduced load to perform weekly ter-bine test 3 4 I 2 Method: Exhibit G. Instructions F: Forced Reamn: I Manual for Preparation of Data S: Scheduled A-Equipment Failure (Explain) 2-Manual Scram. Entry Sheets for Licensee B Maintenance of Test 3 Automatic Scram. Event Report (LER) File INUREG-C Refocling 4 -Continuations 0161) D Regulatory Restriction E Operator Training & Ucense Enamination 5-Ioad Rx1uction I F. Administrative 9-Other (5'mlah) Exhible I Same Source Coperational Error (Emplain) (9/77) llother(Emplain) ~ I,U rlh ~ h I-
- i. s I
.k 50-321 DOCKET NO. UNIT SilUTDOWNS AND F0WER REDUCTIONS UNIT N AME liatch 1 DATE _ l-10-81 COMPLETED BY d. M. Kamishlian REPORT MON 111 December TELEPil0NE 912-367-7781 _ h E ~ w {j Licensee E* gn, Cause & Corrective ,!E } }. f Action to g] ign g. No. Date k gg M jg Report # Event , y a: Psevent Recurrence H oE 88 801207 S 101.8 F 5 NA ZZ ZZZZZZ Management limitation of 80% thermal power 89 LJ1211 F 0.3 A 5-NA HA INSTRU Reduced load because of leakage of ~ .EHC oil from #3 CV 90 801211-F 6.5 A 2 .NA-IIA INSTRU Rx scram because of leaking ECH oil in #80-89 91 801212 F 16.2 A 5' ' ' NA. HA' INSTRU Unit on startup ramp from above shut-down #80-90 92 801213 F 28.9. H 3 NA HA VALVEX Ry auto scram due to TCV fast clos-ure 93 801214 F 17.5 11 5 NA HA VALVEX Unit on startup ramp from above shut-down #80-92 i .3 4 I 3 Method: Exhibit G. Instructions F: Forced Reason: S: Scheduled A Equipment Failure (Explain) 1 Manual for Preparation of Data B4taintenance of Test 2-Manual Scram. Entry Sheets for Licensee 3 Automatic Scram. Event Report (LER) File (NUREG-C Refueling I D Regulatory Restriction 4-Continuations 0161) E-Operator Training & Ucense Examinatimi 5-Ioad Beduction i 5 F-Administrative 9 m (gg) Exhibit I SameSource i Goperational Error (Explain) (9/77) Ilother(Explain) G y s .I
. i,. DOCKET NO. _50-321 UNIT SilUTDOWNS AND POWER REDUCTIONS UNIT NA5f E _ 81 llatch 1 DATE . Kaini s h l i a_n COMPLETED BY REPORT MONT11 December TELEPilONE 912-367-7781 l "h m Licensee E e, Cause & Corrective } },,E j ^ * " " ' " No. Date E. ia3 Ed P,even Recurrence g= ,ye Event g-o@ 3 ggi RePo.i n a 94 801215 S 6.05 F 5 NA' 2Z ZZZZZZ Management limitation of 80%'themal power 95
- 801217 F
4 5-NA Ch VALVEX Reduced load because of issiated E11-F060B to restore "B" loop RHR 96 801218 F. 19'.5 1 NA. CF VALVEX Unit of.f line due to above #80-95 97 801218 F 11 5, . NA CF, VAL' VEX Unit on startup from above shutdown 180-96 98 801218 S 21 F 5 NA ZZ ZZZZZZ Management limitation of 80% themal pow 2r 99 801219 F 19 A 2 NA HA INSTRU Rx scram'due to inv.estigation of EHC low alarm leak from #2 CV 4 t 2 .3 4 Method: Exhibit G. Instructions F: Forced Reason: S: Scheduled A Equipment Failure (Explain)
- 1. Manual for Preparation of Data D41aintenance of Test 2-Manual Scram.
Entry Sheets for Licensee
- 3. Automatic Scram.
Event Report (LER) File fr4UREG. C Refueling D Regulatory Restrictit - 4 -Continuations 0161) E-Operator Training &.Jeense Exaralnation. 5-Ioad Reduction 3 F Administrative 9-Other (Explain) Exhibit I-Same Source G4perational Erroc(Explain) (9/77). Ilother(Explain) g q. e
9 50-321 DOCKET NO. Hatch 1 UNIT SilUTDOWNS AND POWER REDUCTIONS UNIT NAME DATE l-10-81 COMPLETED BY J. M; KamishIian December TELEPeloic m _-36 7-7 781 REPORT MONTH \\ b ~ Cause & Corrective w l i
- EU Licensee gg
.I E } ]hM Event Action to g= mg j No. Date Frevent Recurrence a$ M j f5 Report # H 100 801220 F 27 A 5 NA. HA INSTRU Unit on startup from above shu'tdown
- 80-99 101 801221 S
149.7 F 5 NA ZZ ZZZZZZ Management limitation of 80% thermal power 102 801227 S 3.3 B 5 NA HE TURBIN Reduced load to perfonn weekly tur-bfne test 103 801228 S 93 F S NA-ZZ ZZZZZZ Management limitation of 80% thermal power i 3 4 1 2 Method: Exhibit G Instructions l Manual for Preparation of Data F: Forced Reason: 5: Scheduled A.Eigulpment Failure (Enr' In) 2 Manual Sciam. Er.try Sheets for Licensee B. Maintenance of Test 3 Automatic Scram. Event Report (LERI File INUREG-C Refueling 4-Continuations 0161I D Regulatory Restriction E-Operator Training & License Examinathm 5-Ioad aeduction 5 l F Administrative 9-Other (Explain) Exhibit I Some Suurce Goperational Error (Emplain) (9/77) llother(Explain) J C w
e. i. / NARRATIVE REPORT N' UNIT 1 ,].' ,1 Dec. 1st Unit limited to 80% thermal power by management g 2 Dec'. 2nd At 17:15 reduced load because of generator , ground fault alarm ),1.f Dec. 2nd Unit off line at 1914 to investigate generator $1f$ ground fault alarm -Q Q -g?i. Dec. 3rd Unit on startup ramp from above
- shutdown,
- ir' generator on line at :1.:29
?[$$*:. 03 ',' Dec. 3rd At 18:00 load held at approximately 350 MWe due ff to tube leak in waterbox "C"; unit returned to gg. manat_Sment limitation at 11:00 on 801205 .n 9-Dec. 5th Unit limited to 8'0%. thermal power by management 9;M Y' Dec. 7 th-At 1:00 load reduced to perform weekly turbine ~ ?'- test;: unit returned to management limitations at 4.:00 Dec.'7th Unit limited to~80%_ thermal power by management Dec. lith At 9_:50 load reduced because of leakage of EHC \\ oil ~on #3 CV .4 Dec. Alth Rx manual scram because of leaking EHC oil on 43 CV at :10.:07 Dec. lith Unit on startup rampi from above shutdown; Rx critical at 20.:38 and generator on line at 9.:28 on 801212 Dec 13th Rx auto scram because of TCV.. fast closure at 1:44 Dec. 13th Unit on startup from above shutdown; Rx critical at 23:55 and generator on line at 6:31 on
- 8701214, Unit returned to management limita-tions at 23:30 on 801214 Dec. 14th Unit limited to 80.%.t}ermal power by management ec. 17 th At-12':32 load reduced because of isolated Ell-F060B to restore "B" loop RHR Dec. 17 th -
At 16:30 unit shutdown due to isolated Ell-F060B to restore "B" ' loop RHR; Rx in H/S. at ' 8 : 5 2 on 801218 Dec. 18th Unit on startup from above shutdown, generator on line at 12:03; unit returned to management limitations at 23:00
'o' i
- ~
Dec. 18th Unit limited to 80% thermal power by management Dec. 19th Rx manual scram at 20:01 due to investigation of EHC* low alarm leak in 92 CV. Dec. 20th Unit on startup from above shutdown; Rx critical at 9:42 and generator on line a t 1 4 : 5 9.' Unit returned to management limitations at 18100 on 801221. Dec. 21st Unit limited to 80% thermal: power by management D'ec'. 27th 'At 23.:40 l'oad reduced to perform weekly turbine test; unit returned to management limitations at 3100 on 801228 Dec. 28th Unit limited to 80% thermal power by management i l .,.n>
HATCH 1 SAFETY - RELATED MAINTENANCE REQUESTS TO BE REPORTED FOR DECEMBER 1980 i- _ UMBER DATE COMPLETED DESCRIPTION N 79-1455 10-23-80 Add synchno-acceptor relays to R43-S001A,B,C, per DCR 76-201 80-5229 11-17-80 Repaired pump 1C11-C001A and replaced into service 80-5701 '11-19 Replaced HPCI exh. valve E41-F053 with solenoid valve 75F-008 ~ 80-6442 12-19-80 Replaced -relay C11-K28 in H11-P616 panel to make auto bypass on rod worth minimizer 1C11-J600 runction properly O e i l l
- }}