UNITED STATES
[
[
/
NUCLEAR REGULATORY COMMISSION
^'
REGION lli
CLEN ELLYN, ILLINO15 60137
l
JUL 3 0 1975
Consumers Fever thpany
Docket No. 50-155
ATIN:
Mr. Robert L. Baueter
i
Electric Production
I
Superintendent - Nuclear
212 West Michigan Avenue
Jackson, Michigan 49201
Gentlemen:
This refers to the inspection conducted by Mr. Nueter of this office on
l
June 10-13, 1975, of activities at Big Rock Point authorized by NRC
!
Operating '.icense No. DFR-6 and to the discussion of our findings with
Mr. Hartman and others of your staff at the conclesion of the inspection.
l
A copy of our report of this inspection is enclosed and identifies the
areas examined during the inspection. Within these areas, the inspection
j
consisted of a selective examination of procedures and representative
I
records, interviews with plant personnel, and observations by the
i
inspector.
No items of noncompliance with NRC requirements were identified within
,
the scope of this inspection.
i
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part
i
2. Title 10, Code of Federal Regulations, a copy of this letter and the
I
enclosed inspection report will be p3sced in the NRC's Public Document
!
Room. If this report contains any information that you or your contractors
I
believe to be proprietary, it: is necessary that you make a written
application to this office, within twenty days of your receipt of this
4
letter, to withhold such information from public disclosure. Any such
!
application must include a full statement of the reasons for which it is
!
elaimed that the information is proprietary, and should be prepared so
i
the proprietary information identified in the application is contained
in a separate part of the document. Unless we receive an application to
!
withhold information or are otherwiso contacted within the specified
1
time period, the written material identified in this paragraph will be
placed in the Public Document Room.
<
-
}
ik
'
'
,
.,
,
up
. U, ar
4ggjTIO4
%
'
%,, .,
"~
87s/aR644Y/
,
.
U
i
Consumers Power Company
-2-
No reply to this letter is necessary; however, should you have any
questions concerning this inspection, we will be glad to discuss them
with you.
Sincerely yours,
Caston Fiorelli, Chief
Reactor Operations Branch
Enclosure:
IE Inspection Rpt No.
050-155/75-09