ML20002D750

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-155/75-16 on 751119-21.No Noncompliance Noted
ML20002D750
Person / Time
Site: Big Rock Point File:Consumers Energy icon.png
Issue date: 12/17/1975
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Dewitt R
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
Shared Package
ML20002D751 List:
References
NUDOCS 8101220306
Download: ML20002D750 (2)


See also: IR 05000155/1975016

Text

dN_ ,

j

P '

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION lil

P00. 0 I INJ

799 ROOSEVELT RO AD

.

GLEN ELLYN. ILLINOt5 60137

O t.C 1 7 19(d

.

.

,

Consumers Power Coc:pany

Docket No. 50-155

,

ATTN: !!r. R. B. DeWitt

Nanager of Nuclear

,

Plant Operations

212 West liichigan Avenue

Jackson,1:ichiCan

49201

,

Gentlemen

This refers to the inspection conducted by 12. Erown of this

'

office on Nover.ber 19-21, 1975, of activitics at Big Rock

Nucicar Plant authorized by Reactor Operating License No. DPR-6

,

and to the diccussion of our findings with 12. Hartran and

others of your staff at the conclusion of the inspection.

A copy of ocr report of this inspection is enclosed and identi-

fics the areas e::amined during the inspection. Within thesc

areas, the inspection consisted of a celective e.xacination of

procedures and representative records, interviews with plant

personnel, and observations by the inspector.

No items of noncompliance with NRC requirenents were identi-

ficd within the ccope of this incpection.

In accordanes with Section 2.790 of the NRC's " Rules of

Practice," Part 2 Title 10, Code of Federal Regulations, a

copy of this letter and the enclosed inspection report vill

be placed in the NRC's Public Docur.cnt Enom. If this report

containc any infor=ation that you or your contractora believe

to be proprietary, it is necessary that you cake a written

,

l

application to this office, uithin tucuty days of your

receipt of thic letter, to withhold such inforr:ation from

public disclosure. Any cuch application cust include a full

statement of the reasons for which it is clained timt the

information is proprietary, and should be prepared so the

proprietary information identified in the application is

'

.

.

7/0/9 aO S0l!

.

-

.-

-

.

.

.

.

..

- .

.

.

. .

..

-

.

,

.

2-

-

Consumers Power Company

-

-

.

contained in a separate part of the document. Unless we

receive an application to withhold inforcation or are other-

wise contacted within the specified time period, the written

material identified in this paragraph will be placed in the

Public Docunent Room.

No reply to this letter is necessary; however, should you

have any questions concerning this inspection, we will be

glad to discuss them with you.

s

.

Sincerely yours,

Caston Piorelli, Chief

Reactor Operations and

Nuclear Support Eranch

_

Enclosuret

IE Incpection Rpt. No. 050-155/75-16

cc v/ enc 1:

Mr. C. J. Hartcan

Plant Superintendent

Mr. R. Ecrry

Consumers Power Company

bec w/ enc 1:

.

PDR

l

-

Local PDR

NSIC

UC

,

l

Ronald Callen, Michigan Public

Service Com.ission

Anthony Roisnan, Esq., Attorney

1

I

I

e

4

4

,

e