ML20002D456

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-445/80-26 & 50-446/80-26 on 801105-07,13-14,18-20 & 24-25.No Noncompliance Noted
ML20002D456
Person / Time
Site: Comanche Peak  
Issue date: 12/23/1980
From: Seidle W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Gary R
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
Shared Package
ML20002D457 List:
References
NUDOCS 8101210072
Download: ML20002D456 (2)


See also: IR 05000445/1980026

Text

fl-D

lf . %s

UNITED STATES

g.

d;,,

NUCLEAR REGULATORY COMMISSION

h-

REGION IV

j

D

% ,

,g #

611 RYAN PLAZA DRIVE. SUITE 1000

ARLINGTON, TEXAS 76011

,

.

Q<

a>

In Reply Refer To:

December 23, 1980

"

5.% .y

RIV

GY

'

b

Docket No. 50-445/Rpt. 80-26

y-:k p / -}

.g

l

50-446/Rpt. 80-26

.

B

5 ShqW /))

gsu

4

Texas Utilities Generating Company

"" N A

Attn: Mr. R. J. Gary, Executive Vice

'D'

President and General Manager

2001 Bryan Tower

Dallas, Texas 75201

Gentlemen:

This refers to the inspection conducted by Mr. R. C. Stewart of our staff

during the periods November 5-7, 13-14, 18-20 and 24-25, 1980, of activities

authorized by NRC Construction Permits No. CPPR-126 and 127 for the Comanche

Peak facility, Units No.1 and 2, and to the discussion of our findings with

Mr. R. G. Tolson of your staff at the conclusion of the inspection.

Areas -

' od during the inspection and our findings are discussed in the

encio

pection report. Within these areas, the inspection consisted of

select...e examination of procedures and representative records, interviews

with personnel, and observations by the inspector.

Within the scope of the inspection, no violations were identified.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If the

report conta. ins any information that you believe to be proprietary, it is

necessary that you submit a written application to this office, within 20 days

of the date of this letter, requesting that such information be withheld from

public disclosure. The application must include a full statement of the reasons

why it is claimed that the information is proprietary. The application should

be prepared so that any proprietary information identified is contained in an

enclosure to the application, since the application without the enclosure will

also be placed in the Public Document Room.

If we do not hear from you in this

regard within the specified period, the report will be placed in the Public

Document Room.

8102220071

p

-

.

-.

t . . , . ' .:> ,. s _. . ,;u ; > . ., < : ' r. . ,_ ;i.

s : :. . .+ pi c.;.9:. u ;: . .n:-i;,s..;. . r.

n n:: ; .9 u . c ; .~,;ya u: , t;: ... r . . - c

.

.

.

. .

.

Texas Utilities Generating Company

2

December 23, 1980

Should you have any questions concerning this inspection, we will be pleased

to discuss them with you.

Sincerely,

&

=== --

. C. Seidle, Chief

Reactor Construction and

Engineering Support Branch

Enclosure:

IE Inspection Report No. 50-445/Rpt. 80-26

50-446/Rpt. 80-26

l

l

I

1

l

.

3