ML20002D418

From kanterella
Jump to navigation Jump to search
Forwards LER 80-102/03L-0
Date released: 01/16/2020 Download: ML20002D418


LER 80-102/03L-0:on 801212,during Reactor Startup,Control Rod 26-35 Had to Be Bypassed in Full Out Position to Allow Startup to Continue.Probably Caused by Faulty Signal from Rod Position Reed Switch to Rod Sequence Control Sys
ML20002D421
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 01/08/1981
From: Pastva M
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20002D421 (1)
Forwards LER 80-102/03L-0
ML20002D417
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 01/08/1981
From: Tollison A
CAROLINA POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20002D417 (1)