Forwards Notice of Violation & Notice of Proposed Imposition of Civil Penalties Re NRC 800306-0731 Investigation
ML20002D413
Person / Time
Site: Midland
Issue date: 01/07/1981
From: Stello V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To: Howell S
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
Shared Package
ML20002D414 List:
References
EA-80-056, EA-80-56, NUDOCS 8101200586
Download: ML20002D413 (2)


Text

I

/,,,%

T/ v )

UNITED STATES J

g[ h (3 i NUCLEAR REGULATORY COMMISSION

,gg

,f7p WASHINGTON, D. C. 20555

% wl,p s +.

    • ..+

G

..' 0 'l l~2'

~

Docket Nos. 50-329 S

A 50-330 g-e4 EA-80-56 L,i n,

an

~

i, - 0 NU The Consumers Power Company T

3 hh ATTN:

Mr. Stephen H. Howell Q

R@

w Senior Vice President O

W 1945 West Parnall Road 2

M Jackson, MI 49201 Gentlemen:

During an investigation of activities at the Midland site, which began in March and which continued through July 1980, we found major deficiencies in Consumers Power Company's quality assurance program, as related to the heating, ventilatior, and air conditioning contractor's activities.

As a result, we propose to impose civil penalties in the amount of Thirty-eight Thousand Dollars.

The items of noncompliance are set forth in Appendix A.

The Notice of Proposed Civil Penalties is attached as Appendix B.

In responding to this matter, you should follow the instructions in Appendices A and B.

The investigation disclosed noncompliance with ten of the eighteen different criteria for a quality assurance program, as set forth in 10 CFR 50, Appendix B.

Major quality assurance deficiencies were found regarding compliance with approved procedures and practices during fabrication and installation, and the overall traceability of materials used for-fabri-cation.

On March 21, 1980, we issued an Immediate Action Letter confirm-ing your Stop Work Order in the heating, ventilating and air conditioning safety related areas.

The significant findings of this investigation were discussed during a meeting between you and J. G. Keppler, Director, Region III and members of the respective staffs on May 2, 1980.

The understandings reached at that meeting were set forth in a letter dated May 22, 1980, from James G. Keppler.

Your reply of June 30, 1980, to that letter-has been reviewed.

Additional inspections are being conducted at the site to follow your progress in correcting problems identified during your initial audits and during our investigation of the HVAC contractor.

Your response to the enclosed Notice of Violation, and our continuing inspection program will determine CERTIFIED MAIL RETURN RECEIPT REQUESTED 8102200 Q6

r.

1 Consumers Power Company whether additional escalated enforcement action, such as additional civil penalties or orders to suspend construction activities, are required to ensure future compliance.

Sincerely, a

,6]

nag?f-

y Victor Stello, Jts Directord Office of Inspection and Enforcement

Enclosures:

1.

Appendix A, Notice of Violation 2.

Appendix B, Notice of Proposed Imposition of Civil Penalties i