O VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT MONTH November YEAR 3 (Revised 12-26-80) l APPROVED:
STATION MANAGER V
81012oo475
s OPERATING DATA REPORT DOCKET NO.
50-338 DATE 12-26-87 COMPLETED BY cers TELEPHONE 3
-51bl X2520 OPERATING STATUS fly 16yr-to-dateand
- 1. Unit Name:
North Anna Unit 1 N "a4e
- 100n
- 2. Reporting Period:
0 Cumulative have been adjuste i
- 3. Licensed Thermai Power (MWt): 277ti for Burnup over estimation
- 4. Nameplate Rating (Gross MWe):
947 during October.
- 5. Design Electrical Rating (Net MWe): 907
- 6. Maximum Dependable Capacity (Gross MWe):
- 7. Maximum Dependable Capacity (Net MWe):
850
- 8. If Changes Occ= in regis-ity katings (Items Nu nber 3 Through 7) Since Last Report, Give Reasons:
N/A
- 9. Power Level To Which Restricted,!f Any (Net MWe):
N/A
- 10. Reasons For Restrictions.If Any:
N/A This Month Yr..to.Date Cumulative
- 11. Hours In Reporting Period 770 A nan 21.817
- 12. Number Of Hours Reactor Was Critical 770 7 1 c;t; c:
17 7?n_R
- 13. Reactor Reserve Shutdown Hours 0
' 64.3
'21 3.1
- 14. Hours Generator On-Line 720 6.441 7 16.996.4
- 15. Unit Reserve Shutdown Hours 0
0 0
- 16. Gross Thermal Energy Generated (MWH) 1.793,316 17.346.043 43.625.956
- 17. Gross Electrical Energy Generated (MWH) 582,355,_,
5,585,018 13.913.367
- 18. Net Electrical Energy Generated (MWH) 549,449 5,256.749 13.110.195 100 86.4 77.9
- 19. Unit Service Factor
- 20. Unit Availability Factor 100 86.4 77.9
- 21. Unit Capecity Factor (Using MDC Net) 89.8 76.9 70_7
- 22. Unit Capacity Factor (Using DER Net) 84 I 72 1 AA 1 0
7.5 6.I
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date,and Duration of Each t:
Refnplinn TMT and Firo prntar+4nn un A 4 r 4,. o 4,,,,,. Decomhar 11. 10Rn. A wantee
~
Maintenancet May 1. 1981: 10 davs
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
N/A
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION (4/77)
-.