ML20002D175
| ML20002D175 | |
| Person / Time | |
|---|---|
| Site: | Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png |
| Issue date: | 12/26/1980 |
| From: | Crutchfield D Office of Nuclear Reactor Regulation |
| To: | Counsil W CONNECTICUT YANKEE ATOMIC POWER CO. |
| References | |
| TASK-03-03.B, TASK-3-3.B, TASK-RR LSO5-80-12-059, LSO5-80-12-59, NUDOCS 8101190685 | |
| Download: ML20002D175 (2) | |
Text
o 0
-,, [.( 4: 5: &1 w
G
)
....j OEC 2 61980 N!"
Si
'O s
o Docket No. 50-213 hh3J\\g.) Gy,'!U hk 7
5;a.;:-2 : W 52 Mr. W. G. Counsil Vice President Nuclear Engineering and Operations Connecticut Yankee Atomic Power Co.
Post Office Box 270 Hartford, Connecticut 06101
Dear Mr. Counsil:
SUBJECT:
HADDAM NECK - SEP TOPIC III-3.B. STRUCTURAL AND OTHER CONSEQUENCES (E.G. FLOODING OF SAFETY RELATED EQUIPMENT IN BASEMENTS) 0F FAILURE OF UNDERDRAIN SYSTEMS This letter is to advise you that Topic III-3.B. " Structural and other Consequences (e.g. Flooding of Safety Related Equipment in Basements) of Failurt of Underdrain Systems" is applicable to your facility and supersedes our letter of Noveober 16,1979 to you.
The reason for this change is the identification of a at sep beneath the containment building.
Sincerely, QzZj 0!GK rL fLj' Dennis M. Crutchfield, Chief Operating Reactors Branch #5 Division of Licensing cc: See next page i
DISTRIBUTION:
Docket HSmith GStaley NRC PDR RCaruso i
Local PDR GCwalina TERA DPersinko NSIC, JBuchanan RHermann JHeltemes, AEOD SEP File DEisenhut 051@(3) 1.
D I&E RPurple ACRS (16)
JRoe NRR Reading RTedesco SEPB Reading TNovak gkhnY(,
WRussell Glainas DCrutchfield JWetmore SEPB:DLSL SEPB:DigC ORB #5:DL:PM ORB #5:DI.:C AD:SA:DL SEPB:0L$
i#dd 1"
,,[,j',pWersFnXo:sjserman TCi g "6ErsenVeid "sGVnas r
12//4 /80 occ) 12/ita s0 12/p/80 12/b/80 12/g6/80 12/ /80 r
nac Fcau 3-Cu.s. covssNutNT PRINTING OFFICE: 1979 289 369 8101 18tUsi Nacu mo f b16
!(p %qj%,
UNITEc ATES
.r, 7,
NUCLEAR REGULA.JRY COMMISSION 3
p WASHINGTON. D. C. 20555 f
OEC 2 619S0 Docket No. 50-213 LS05-80-12-059 Mr. W. G. Counsil, Vice President Nuclear Engineering and Operations Connecticut Yankee Atomic Power Co.
Post Office Box 270 Hartford, Connecticut 06101
Dear Mr. Counsil:
SUBJECT:
HADDAM NECK - SEP TOPIC III-3.B. STRUCTURAL AND OTHER CONSE0VENCES (E.G. FLOODING OF SAFETY RELATED EQUIPMENT IN BASEMENTS) 0F FAILURE OF UNDERDRAIN SYSTEMS This letter is to advise you that Topic III-3.B. " Structural and Other Consequences (e.g. Flooding of Safety Related Equipment in Basements) of Failure of Underdrain Systems" is applicable to your facility and supersedes our letter of November 16,1979 to you.
The reason for this change is the identification of a ma,t sump beneath the containment building.
l Sincerely, M b,4 C..
^=
Dennis M. Crutchfield, Chief Operating Reactors Branch #5 Division of Licensing cc: See next page
Mr. W. G. Counsil HADDAM NECK PLANT DOCKET NO. 50-213 cc Day, Berry & Howard U. S. Environmental Protection Counselors at Law Agency One Constitution Plaza Region 1 Office Hartford, Connecticut 06103 ATTN: EIS COORDINATOR JFK Federal Building Superintendent Boston, Massachusetts 02203 Haddam Neck Plant RFD #1 Resident Inspector Post Office Box 127E Haddam Neck Nuclear Power Station East Hampton, Connecticut 06424 c/o U. S. NRC East Haddam Post Office Mr. James R. Hinuelwright East Haddam, Connecticut 06423 Northeast Utilities Service Company P. O. Box 270 Hartford, Connecticut 06101 Russell Library 119 Broad Street Middletown, Connecticut J6457 Board of Selectmen Town Hall Haddam, Connecticut 06103
~
Connecticut Energy Agency ATTN: Assistant Director Research and Policy Development Department of Planning and Energy Policy 20 Grand Street Hartford, Connecticut 06106 Director, Technical Assessment Division Office of Radiation Programs (AW-459)