Third Interim Deficiency Rept Re Incorrect Insulation Weight Used in Piping Analysis,Initially Reported 800424. As-constructed Insulation Drawings Completed.Review in Progress
ML20002D123
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 01/09/1981
From: Mills L
TENNESSEE VALLEY AUTHORITY
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
10CFR-050.55E, 10CFR-50.55E, NCR-SQN-CEB-800, NUDOCS 8101190485
Download: ML20002D123 (1)


Text

Em E3s I / r z"

\\ ? -c =

- ;:n 400 Chestnut Street Tower II January 9, 1981

([dClb'%

Mr. James N 0'Reilly, Director

. 6-JAN I G 1981 * #3 N

p 8 Eu 2

Office of In tien and Enforcement U.S. Nuclear R latory Commission Y.1 Region II - Suite \\ 100 f

m 158

01 Marietta Street N

/s a

Atlanta, Georgia 303 (

Dear Mr. O'Reilly:

SEQUOYAH NUCLEAR PLANT UNIT 2 - INCORRECT INSULATION WEIGHT USED IN PIPING ANALYSIS - NCR SQN CEB 8008 - THIRD INTERIM REPORT The subject deficiency was initially reported to NRC-0!E Inspecter C. R. McFarland on April 24, 1980, in accordance with 10 CFR 50.55(e).

Interi:t reports were submitted en May 23, and October 16, 1980. We expect to submit our next report by February 26, 1981.

The as-constructed insulation drawings have been completed. TVA is reviewing these drawings against the completed analyses to determine if any reanalysis is nequired.

If you have any questicr.s, please get in touch with D. L. Lambert at FTS 857-2581.

Very truly yours, TENNESSEE VALLEY AUTHORITY L. M. Mills, Manager i

Nuclear Regulation and Safety Mr. Victor Stello, Director /

cc:

Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, DC 20555 3 /o c103190 N

~

~~

~' ~~

~

~