Fifth Interim Deficiency Rept Re Upper Head Injection Isolation Valve Accumulator Weighing Sys,Initially Reported 800325.Westinghouse Will Submit Revised Drawings So Design Changes Can Be Incorporated
ML20002D120
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 01/09/1981
From: Mills L
TENNESSEE VALLEY AUTHORITY
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
10CFR-050.55E, 10CFR-50.55E, NCR-SQN-NEB-800, NUDOCS 8101190480
Download: ML20002D120 (1)


Text

.

s N E -3 3 E E ' < a t L I' a.D

. 7 ' '

400 Chestnut Street Tower II,

January 9, 1981

\\

19 Mr. James O'Reilly, Director I

)I Office of Ins tien and Enforcement d

L

U.S. Nuclear Re-latory Co:nmission H

Jgpg 161981

  • j3 Region II - Suite 100

!J k g

  • 5 Sts

/

101 Marietta Street y}

Atlanta, Georgia 303 g)s Oear Mr. O'Reilly:

V f%(

SEQCOYAH NUCLEAR PLANT UNIT 2 - UHI HYDRAULIC ISCLATICN VALVE ACCUMULATOR WEIGHING SYSTEM - NCR SQN NEB 8007 - FIF"H INTERIM REPORT The subject deficiency was initially reported to NRC-0IE inspector M. J. Gouge en March 25, 1980, in accordance with 10 CFR 50.55(e). Interim reports were submitted en April 24, June 18, July 23, and September 25, 1960. We expect to submit our next mport by March 4,1981.

Westir@ouse has agreed to submit mvised drawings to TVA so that the design changes can be incorporated. The :nodifications to the accumu-lator weighing systems will be implemented upon receipt and approval of the revised drawings.

If you have any questions, please get in touch with D. L. Lambert at FTS 857-2581.

Very truly yours, TENNESSEE VALLEY AUTHORITT L. M. Mills, Manager Nuclear Regulation and Safety i

I Mr. Victor Stello, Director /

cc:

Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, DC 20555 po/1 S'l0 n aw

=

.