ML20002D054
| ML20002D054 | |
| Person / Time | |
|---|---|
| Site: | Wood River Junction |
| Issue date: | 12/22/1980 |
| From: | Partlow J NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS) |
| To: | Gregg R UNC RECOVERY SYSTEMS, UNITED NUCLEAR CORP. (SUBS. OF UNC, INC.) |
| References | |
| NUDOCS 8101190262 | |
| Download: ML20002D054 (2) | |
Text
-
u
}
k,.
=
f*
- G
~
E
'g UNIT E D ST Ai E S y $i d,5), l NUCLE AR REGULATORY COMMISSION c-3,(4:
nasmoros o c. oss, Wl u.,
~
PL q
SGML:CWE 70-820
~c y
3 e-g L'nited Nuclear Corporation Recovery Systems Division ATT!i: Mr. R. J. Gregg Plant Manager One Narragansett Trail Wood River Junction, Rhode Island 02894 Gentlemen :
This is in response to your letter dated December 3,1980 wnich transmitted partial revisions tu Chapters 3.0 end 6.0 of your Decomissioning fundarental feuclear Material Control Plan.
We have determined that the Chapter 6.0 revision involving the timing of plant record adjustments is acceptable and will not adversely affect the common defense and security nor the public health and safety.
Hor,e ve r,
the revision to Chapter 3.0, which was intended to clarify your intent relative to enrichment measurements on cleanout materials, is not sufficiently detailed.
Consequently, License Condition 3.2, which requires representative enric'rment measurements, is being retained.
In order to incorporate the revision to Chapter 6.0, we are revising License Condition 2.1 of Amendment MPP-2 to your License fio. S!Cl-777, as set forth in the enciesure, effective innediately.
We have detemined that the enclosure to your letter dated December 3,1980 contains infomation of a type specified in 2.790(d). Accordingly, pursuant to Section 2.790(d)(1), such information is deemed to be cc nercial or financial informaticn aithin the meaning of 10 CFR 9.5(a)(4) and shall be subject to disclosure only in accordance with the provisions of 10 CFR 9.12.
Sincerely,
[
f Ja; es W., arW, u, Chief Ma terial Control and Accountability Licensing Branch
Enclosure:
As stated U 01190 qg g
'1L Enclosure Revision of Sections 1.0 Through 8.0 In Their Cntirety to Materials and Plant Protection Amendment MPP-2 to License No. SNM-777 Ef fective 9/19/80 e
1.0 FACILITY ORGANIZATION 1.1 Notwithstanding the requirenents of 10 CFR 70.57(b)(2) to perfona reviews and audits of the measureaent control progran, the licensee is exempt fraa such reviews and audits during the decommissioning of the Plant.
1.2 Notwithstanding the requirements of 10 CFR 70.57(b)(3) to perfona reviews and audits of a contractor's reasurenent control program at intervals not to exceed every 12 months, the licensee is excapt fren this requirement.
1.3 Notwithstanding the requiraments of 10 CFR 70.58(c)(2) to perfonn reviews and audits of the nuclear material control progran at least every 12 months, the licensee is exempt frora this requirement.
2.0 FACILITY OPERATION
/22/83) 2.)
The licensee shall follow the Decon,issioning Fundamental Nuclear futerial Control Plan, except Section 7.1, transmitted with correspondence dated August 29 and Septenber 8, 1980, and as revised Octcber 24 and Decenber 1,1980; except for paragraph cne of Section 3.6, and in accordance with the provisions of 10 CFR 70.32(c).
2.2 No statement in the licensee's Plan identified in Condition 2.1 shall relieve the licensee of a requirement of 10 CFR Part 70 unless granted in a specific excaption or exception set forth as a Condition of this license.
2.3 Operations involving special nuclear material which are not described in the Plan identified in Condition 2.1 shall not be initiated until the appropriate safeguards plan has been approved by the Nuclear Regulatory Commission.
2.4 All SNM not in transit shall be physically within an 11BA or ICA except as noted below:
2.4.1 Notwithstanding the requirement of 10 CFR 70.58(d) that MBAs and ICAs be established for physical and administrative control of nuclear material, the SNM in the lagoon and the lagoon residue awaiting transfer to burial need not be assigned to an MBA or ICA.
.