ML20002C905

From kanterella
Jump to navigation Jump to search
Ack Receipt of Forwarding Concrete Verification Program Status Rept,In Response to 800430 Order to Show Cause Item 3b
ML20002C905
Person / Time
Site: South Texas  
Issue date: 12/23/1980
From: Seidle W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Oprea G
HOUSTON LIGHTING & POWER CO.
Shared Package
ML20002C906 List:
References
NUDOCS 8101120388
Download: ML20002C905 (1)


Text

r

]

b

cf e are %

UNIT (D STATES 3w NUCLEAR REGULATORY COMMISSION y i, c>i g

1

~C REGION IV

%,,[, [

611 RYAN PLAZA DRIVE, SUITE 1000 ARLINGTON, TEXAS 76011 December 23, 1980 in Reply Refer To:

G; RlV

[

52 Docket No. 50-498/Rpt. 79-19 R

h Z

50-499/Rpt. 79-19 i

1

=c :.

cs.

EEz M

UI@;

D EE Houston Lighting and Power Company 5

g C<j ATTN: Mr. G. W. Oprea, Jr.

R E

I Executive Vice President Post Office Box 1700 Houston, Texas 77001 Gentlemen:

Thank you for your letter (ST-HL-AE-513) of August 15, 1980, which trans-mitted documentation pertaining to the STP Concrete Verification Program in response to Item No. 3b of the NRC Order to Show Cause dated April 30, 1980.

We will review this documentation and implementation of corrective actions during future inspections.

Sincerely,

/

I

/

p W. C. Seidle, Chief Reactor Construction and Engineering Support Branch S

[/0//.2Og g