4 s
ReRulat0Ty DOChet fil0 i
p campany c.-.,. ome..: m w.. wcmo.n av.nu s.ca.on. wcwo n 4m. 4,.. coa. on 7as-osso May 25, 1977
\\'$,. M ('/! %
c't I.
,T/\\
(
,.. ' 'N.fh Director of Nuclear Reactor Regulaticn
[
1 s
,7 Att: Mr Don K Davis, Actir g Branch Ch!ef ItN
/ * / ^~
b /l Operating Reactor Branch :<o 2 (i(. (> fj QC.i US Nuclear Regulain, commission g.g ' ['T yq
~'/
Washington, DC 20555
\\
y
- j DOCKE" 50-155, LICENSE DPR N5 BIG ROCK POINT PLANT - REQUEST FOR TECHNICAL SPECIFICATIONS CDRGES
- SUPPLD EiT TO SUBMITTAL DTD, SEPTEMBER 10, 1975 g
"'ransmitted herewith are three (3) executed and thirty-seven (37) conformed copies of a request for changes to the Technical Specifications of i
License DPR-6, Docket 50-155, issued to Consumers Power Company on May 1, 196h for the Big Rock Point Plant.
By letter dated September 10, 1975, Consumers Power Company submitted a re-quest for changes to the Technical Specifications to allow automatically bypassing the high condenser pressure reactor trip any time steam drum pres-sure is less than 500 psig. However, the September 10, 1975 letter in-advertently neglected to incorporate changes to Section h.2.2(b).
Thus, the purpose of this submittal is to propose changes to Section h.2.2(b) of the Technical Specifications to be consistent with and clarify the proposed changes requested in the September 10, 1975 letter.
7 r
,/
David A Bixel Nuclear Licensing Administratt."
CC: JGKeppler, USNRC
(
8)'6//& 6//&
' i.
-(
i f
CONSUMERS POWER COMPANY l
J Docket 50-155 g
i Request for Changes to the Technical Specifications License DPR-6 For the reasons hereinafter set forth, it is requested that the Technical Specifications contained in Provisional Operating License DPR-6, Docket 50-155, J
be changed as described in Section I, below:
I.
Changes A.
1.
Change Section h.2.2(b) as follows:
)
"(b) Operating Requirements
_(1) The following condenser trips shall be operable during reactor power operations:
Annunciate, Inches Hg Absolute 50 0.5 Turbine Trip and Bypass Valve Closure, Inches Hg Absolute 10.0 0.5 (2) The following condenser trip shall be operable during reactor power operations when system pressure is 500 psig or higher:
Reactor Scram, Inches Hg Absolute 8.0 0.5" l
Note:
1ee attachment for corrected page change.
II.
By letter dated September _10, 1975, Consumers Power Company submitted a i
request for changes to the Technical Specifications Section 6.1.3 allow-ing the bypassing of the high condenser pressure reactor trip any time steam drum pressure is less than 500 pounds. This submittal neglected to propose changes to Section h.2.2(b), which also deals with bypassing the high condenser pressure reactor trip. Therefore, this submittal proposes changing the bypass pressure from 350 pounds to 500 pounds utilizing the same justification as presented in the September 10, 1975 proposal.
As written, Section h.2.2(b) of the current Technical Specifications is
(
misleading. This section implies that the capability to bypass the high condenser pressure annunciation and the turbine trip and bypass valve closure exists. This is clearly not the case. The alarm and valve trip /
-closure are continually in effect once vacuum is drawn and they are reset.
1^
1 t
4 Further, there are admini strative limits imposed that restrict turbine warm-up un'.il 500 pound steam drum pressure is reached.
Thus, the proposed revamped Eection h.2.2(b) of the Technicti Specifications adds no new tech-nical or operational constraints but is submitted solely to clarify exist-ing system design.
III.
Conclusions Based on the foregoing, both the Big Rock Point Plant Review Committee and the Safety snd Audit Review Board have concluded that these changes do not involve an unreviewed safety question.
CONSU'CES POWER COMPANY By t[
0s-W Stepte)1 H Howell, Vice President Sworn and subscribed to before me this 25th day of May 1977 4
kI
{
=
syn 11al B Ball, notar Public Jackson County,*.ichigan My commissic,n expi
_o April 13, 1980.
d e