Ack Receipt of Util 730305 & 06 Ltrs Informing AEC of Steps Planned to Correct Noncompliances Noted in .Notes Action from 730309 & 12 Telcons,Including Tech Specs Amend Re Emergency Condenser Operability Requirements
ML20002C764
Person / Time
Site: Big Rock Point File:Consumers Energy icon.png
Issue date: 03/16/1973
From: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Haueter R
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
Shared Package
ML20002C765 List:
References
NUDOCS 8101100833
Download: ML20002C764 (2)


Text

-

.. J.k-

~

[

UNITED 'OTATES ATOMIC ENERGY COMMISSION I

e' I

I DIRECTOR ATE OF REGULATORY OPERATIONS

\\g REGION lli

% rs s o' "

799 ROOSEVELT ROAD mm GLEN ELLYN. ILLINOIS 60137 (312)85s-2660 March 16, 1973 Consumers Power Company Docket No. 50-155 ATTN: Mr. Robert L. Haunter Electric Production Superintendent - Nuclear 212 Vest Michigan Avenue Jackson, Michigan 49201 Centlemen:

Thank you for your letters of March 5 and March 6, 1973, informing us of your position and planned corrective actions to correct the items of apparent noncompliance which we brought to your attention in our letter dated February 12, 1973.

It is our understanding from telephone conversations with your staff representatives on March 9 and March 12, 1973, that the following action will be undertaken.

1.

A Technical Specification amendment will be outeitted in approximately 10 working days to clarify the operability requirements of the emergency condsaser.

2.

Contrary to your estintate for full coupliance by August 1,1973, the primary system leakage determination will be sufficient to meet Technien1 Specification requirements following the March 1973 refuelint outage.

We will examine these matters during subsequent inspections.

A copy of inspection report No. 050-155/73-01, referenced is our letter of February 12, 1973, is enclosed.

In accordance with Section 2.790 of the AEC's " Rules of Practice, Part 2 Title 10, Code of Federal Regu-lations, a copy of this letter, our letter of February 12, 1973, your letters of March 5, 1973, and March 6, 1973, and the enclosed inspection report will be placed in the AEC's Public Docunent Room. If the inspection report contains information which you or your contractors believe to be proprietary, it is necessary that you submit a written application to this office, within 20 days of the date of this letter, S"

30M DEM Y.,

i

=

l

Consumers Power Company March 16, 1973 If requesting that such infornation he withheld from public disclosure.

such an application is submitted, it must identify the basis for which inforention is clained to be. proprietary. The application should be prepared so that proprietary infornation identified is contained in a separate part of the application, since the application will also bc placed in the *ublic Docurent Roor.

If we do not receive an application to withhold information, or are not otherwise contacted within the specified tino period, the enclosed report and the previously identified letters will be placed in the Public Document Roon.

Unlest you wish to make application to withhold inforr.ation, no reply to this letter is necessary; however, should you have questions concerning the enclosed inspection report, we will be glad to discuss them with you.

Sincerely yours Eoyce U. Crier Regional Director

Enclosure:

RO Inspectior. F.pt No. 050-155/73-01 cc:

C. J. Hartman riant superintendent - w/ enc 1 bec w/1trs dtd 3-5-73 and 3-6-73: