Revised Order Amending License DPR-64.Info Requested by IE Bulletin 79-01B Must Be Submitted to IE by 801101
ML20002C653
Person / Time
Site: Indian Point Entergy icon.png
Issue date: 09/19/1980
From: Eisenhut D
Office of Nuclear Reactor Regulation
To:
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
Shared Package
ML20002C650 List:
References
IEB-79-01B, IEB-79-1B, NUDOCS 8101100666
Download: ML20002C653 (6)


Text

imV UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of

)

POWER AUTHORITY OF THE STATE

)

Docket rio. 50-286 0F fiEW YORK

)

(Indian Pti ;t Station, Unit No. 3)

)

REVISED ORDER FOR MODIFICATION OF LICENSE I.

The Power Authority of the State of New York (the licensee) is the holder of Facility Operating License No. DPR-64, which authorizes the operation of the Indian Point Plant Unit ho. 3 at ste.dy state reactcr power levels not in excess of 3025 megawatts thermal (rated power).

The facility consists of a pressurized water reactor located at the licensee's site in Westchester County, New Ycrk.

II.

On November 4,1977, the Unicn cf Concerned Scientists (UCS) filed with the Comission a " Petition fer Emergency and Remedial Relief." The petition sought action in two areas:

fire protection fors electrical cables, and environmental qualification of electrical components.

By Memorandum and Order dated April 13,1978 (7 NRC 400), the Coninission denied certain aspects of the petition and, with respect to other aspects, ordered the NRC staff to take several related acticns.

UCS filed a Petition for Reconsideration cn P.ay 2, 1978.

By Memorandum and Order, dated May 23, 1980, the Comission reaffirmed its April 12, 1978 decision 8101100f

regarding the possible shutdown of operating reactors.

However, the Commission's May 23, 1980 decision directed licensees and the NRC staff to undertake certain actions.

With respect to environmental qualification of safety-related electrical equipment, the Commission detarmined that the provisions of the two staff documents - the Division of Operating Reactors " Guidelines for Evaluating Environmental Qualification of Class 1E Electrical Equipment in Operating Reactors" (DOR Guidelines) and NUREG-0588, " Interim Staff Position on Environmental Qualification of Safety-Related Electrical Equipment," December 1979 " form the requirements which licensees and applicants must meet in crder to satisfy those aspects of 10 CFR Part 50, Appendix A General Design Criterion (GDC-4), which relate to environ-mental qualification of safety-related electrical equipment."

The Commission directed, for replacement parts in operating plants, "unless there are sound reasons to the contrary, the 1974 standard in NUREG-0588 l

will apply." The Comnission also directed the staff to complete its 1

review of the information scught from licensees by Bulletin 79-01B and to complete its review of environmental qualification of safety-related electrical equipment in all operating plants, including the publication of Safety Evaluation Reports, by February 1,1981.

The Comnission 1

Bulletin 79-01B was not sent to licensees for plants under review as part of the staff's Systematic Evaluation Program.

The information sought by Bulletin 79-018 was requested from these licensees by a

(

series of letters and meetings during the months of February and March, 1980.

l

. imposed a deadline that, "by no later than June 30, 1982 all safety-related electrical equipment in all operating plants shall be qualified to the D0R Guidelines or NUREG-0588." The Commission requested the staff to, " keep the Commission and the public apprised of any further findings of incomplete environmental qualification of safety-related electrical equipment, along with corrective actions taken or planned,"

and requested the staff to provide bi-monthly progress reports to the Commission.

I The Commission further directed the staff to add certain documentation requirements to cach license after the specific requirements were approved by tFe Commission.

The Cemnission also pointed out that the various deadlines imposed in its Order, "do not excuse a licensee from the obligation tc modify or replace inadequate equipment promptly."

III.

The information developed during this proceeding emphasizes the importance of adequate documentation, the prompt completion of the review of environ-mental qualification of safety-related electrical equipment, and the prompt completion of any plant modification needed to assure conformance with the DDR Guidelines or NUREG-0586.

A significant aspect of this review l

is the timely submittal of environmental qualificaticn information by i

the op: rating plant licensees to enable the staff to complete its review I

in accordance with the Commission's Order.

The staff has a program i

presently underway to reevaluate, using the D0R Guidelines and NUREG-i l

0588, the caelifications of safety-related electrical equipment exposed t

l

4 to environments that may exist following postulated accidents.

These accidents are Loss of Coolant Accident and Main Steam Line Break inside containment, and High Energy Line Breaks inside and outside containment.

In this connection the licensee was requested by our letter of March 5, 1980, as modified by our letter of March 20, 1980 to provide information on emergency procedures and safety related systems.

The licensee was l

requested to define and provide the basis for the hostile environment, inside and outside containment.

This hostile environment would then be used, by the licensee, in the determination of unqualified equipment.

A complete package, including justification fer methods used, was requested.

Clarification was provided by supplemental information, briefings, and in some cases, reetings with the licensee.

Timely completion of the staff's review of environmental qualification of electrical equipment l

and timely completion of needed modifications by the licensee is i

required to provide continuing reasonable assurance of public health and safety.

Such completion is dependent on the prompt receipt of a complete response by the licensee to the staff's requests for information.

However, the licensee's response, to date, is incomplete.

Therefore, I have concluded that the public health, safety, and interest require that a firm schedule for the timely submission of all the

P information previously requested by the staff should be established by Order effective immediately.

IV.

Accordingly, pursuant to the Atomic Energy Act of 1954, as amended, and the Commission's regulations in 10 CFR Parts 2 and 50, IT IS ORDERED THAT EFFECTIVE IMMEDIATELY Facility Operating License No. DPR-64 is hereby amended to add the folicwing provisions:

"Information which fully and completely responds to the staff's request as specified in our letter of March 5, 1980, as modified by our letter of March 20, 1980, shall be submitted to the Director, Division of Licensing, by the licensee not later than November 1, 1980."

An earlier response is encouraged to facilitate staff review and issuance of the safety evaluation report.

The licensee or any person whose interest may be affected by this Order nay request a hearing within 20 days of the date of publication of this Revised Order in the Federal Register.

Any request for a hearing will not stay the effective date of this Order.

Any request for a hearing shall be addressed to the Director, Office of Nuclear Reactor Regulation, U. S. Nuclear Regulatory Commission, Washington, D. C.

20555.

A copy of the request should also be sent to the Executive Legal Director, U. S. Nuclear Regulatory Commission, Washington, D. C.

20555, and to Charles M. Pratt, Power Authority of the State of New York,10 Columbus Circle, New York, New York

10019, attorney for the licensee.

1

, If a hearing is held concerning this Order, the issue to be considered at the hearing shall be whether the license should be modified to require submission of information as set forth in Section IV. of the Order.

Operating of the facility on terms consistent with this Order is not stayed by the pendency of any proceedings on the Order.

This Order revises, in its entirety, the Order issued August 29, 1980, and published in the Federal Register September 12, 1980, (45 FR 60515).

FOR THE NUCLEAR REGULATORY COMMISSION

_ _ M,

~

t1Qnnut, correit a.

U1 rector Division of L._ensing Effective Date:

September 19, 1980 Eethesda, Maryland