Text
- _ .
.
'
[/C
.'
D
![sr,a Krog%
9
UNITED STATES
3 .- ( h- f/' nc [E
NUCLEAR REGULATORY COMMISSION
REGION 11
'
o,
101 MARIETTA ST., N.W., SUITE 3100
C
'
'%r
j'
ATLA,NTA, GEORGIA 30303
(g
.....
g go
.
-
tn
In Reply Refer To:
- , o
_
RII:WBS-
- ,
]
c1
of518/80-23
E2
s
-:
50-519/80-22
)
y
ll
"
50-520/80-23
/
"
'"
2
( 50-521/80-21 /
"
Tennessee Valley Authority
ATTN:
H. G. Parris
Manager of l'awer
500A Chestnut Street Tower II
Chattanooga, TN 37401
Gentlemen:
This refers to the inspection conducted by W. B. Swan of this office on September 29
through October 28, 1980, of activities authorized by NRC Construction Permit
Nos. CPPR-150, CPPR-151, CPPR-152 and CPPR-153 for the Hartsville facility and
to the discussion of our findings held with R. T. Hathcote at the conclusion of
the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative rocords, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were disclosed.
!
We have examined actions you have taken with regard to previously reported
unresolved items. The status of these items is discussed in the enclosed inspec-
tion report.
l
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If this
l
!
report contains any information that you (or your contractor) believe to be
proprietary, it is necessary that you make a written application within 20 days
to this office to withhold s'uch information from public disclosure. Any such
application must include a full statement of the reasons on the basis of which
l
it is claimed tu.t the information is proprietary, and should be prepared so
l
that proprietary information identified in the application is contained in a
separate part of the document. If we do not hear from you in this regard within
the specified period, the report will be placed in the Public Document Room.
(
Should you have any questions concerning this letter, we will be glad to discuss
I
them with you.
M
Reactor Construct on and Engineering
Support Branch
gelosure:
(See Page 2)
.
-.
-.
-
-.
. -
.
- _ _ _ .
,
NOV 2 6 M80
Tennessee Valley Authority
-2-
Enclosure:
Inspection Report Nos.
50-518/80-23, 50-519/80-22, 50-520/80-23
and 50-521/80-21
cc w/ enc 1:
R. T. Hathcote, Project Manager
J. F. Cox, Supervisor, Nuclear
Licensing Section
J. E. Wills, Project Engineer
H. N. Culver, Chief, Nuclear Safety
Review Staff