Forwards IE Insp Repts 50-518/80-23,50-519/80-22, 50-520/80-23 & 50-521/80-21 on 800929-1028.No Noncompliance Noted
ML20002C651
Person / Time
Site: Hartsville  
Issue date: 11/26/1980
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML20002C652 List:
References
NUDOCS 8101100664
Download: ML20002C651 (2)


See also: IR 05000518/1980023

Text

- _ .

.

'

[/C

.'

D

![sr,a Krog%

9

UNITED STATES

3 .- ( h- f/' nc [E

NUCLEAR REGULATORY COMMISSION

REGION 11

'

o,

101 MARIETTA ST., N.W., SUITE 3100

C

'

'%r

j'

ATLA,NTA, GEORGIA 30303

(g

.....

g go

.

-

tn

In Reply Refer To:

, o

_

RII:WBS-

- ,

]

c1

of518/80-23

E2

s

-:

50-519/80-22

)

y

ll

"

50-520/80-23

/

"

'"

2

( 50-521/80-21 /

"

Tennessee Valley Authority

ATTN:

H. G. Parris

Manager of l'awer

500A Chestnut Street Tower II

Chattanooga, TN 37401

Gentlemen:

This refers to the inspection conducted by W. B. Swan of this office on September 29

through October 28, 1980, of activities authorized by NRC Construction Permit

Nos. CPPR-150, CPPR-151, CPPR-152 and CPPR-153 for the Hartsville facility and

to the discussion of our findings held with R. T. Hathcote at the conclusion of

the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative rocords, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were disclosed.

!

We have examined actions you have taken with regard to previously reported

unresolved items. The status of these items is discussed in the enclosed inspec-

tion report.

l

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

l

!

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20 days

to this office to withhold s'uch information from public disclosure. Any such

application must include a full statement of the reasons on the basis of which

l

it is claimed tu.t the information is proprietary, and should be prepared so

l

that proprietary information identified in the application is contained in a

separate part of the document. If we do not hear from you in this regard within

the specified period, the report will be placed in the Public Document Room.

(

Should you have any questions concerning this letter, we will be glad to discuss

I

them with you.

M

Reactor Construct on and Engineering

Support Branch

gelosure:

(See Page 2)

.

-.

-.

-

-.

. -

.

- _ _ _ .

,

NOV 2 6 M80

Tennessee Valley Authority

-2-

Enclosure:

Inspection Report Nos.

50-518/80-23, 50-519/80-22, 50-520/80-23

and 50-521/80-21

cc w/ enc 1:

R. T. Hathcote, Project Manager

J. F. Cox, Supervisor, Nuclear

Licensing Section

J. E. Wills, Project Engineer

H. N. Culver, Chief, Nuclear Safety

Review Staff