m., s.,)
(
V
.Ka s
(h[u a ti,, U
. M, COnSumBiS
! fir (t
EEB E81972e I negratry i.ae cy.
I Power u w CompBuy cm y
s j"~' [~ ~
/y,'
,r cenerar omces: 212 West Michigan Avenue. Jackson. Michigan 49201. Area Code St7 788-0550 tQ f/
February 23, 1972 Dr. Peter A. Morris, Director Re: Docket No 50-155 Division of R %ctor Licensing License No DPR-6 United States Atomic Energy Commission Washington, DC 205145
Dear Dr. Morris:
This letter is written to inform you of our interpretation of the six-and twelve-month intervals of periodic testing required by the Big Rock Point Plant Technical Specifications as well as plans for per-forming this testing.
The Big Rock Point Plant was last out of service for refueling from February 12 to March 13, 1971. During this period, six-and twelve-month intervale periodic testing was performed (refer to Attachment I).
The 1972 refueling outage has been postponed for approximately a month due to equipment delivery problems. The refueling outage is now scheduled to start March 17,15r/2. A strict literal interpretation of the six-and twelve-month intervals periodic testing requirements could be construed to imply the plant should be shut down to accomplish this testing prior to March 17, 1972. However, if we postpone the testing until the scheduled outage, the time interval will be approximately twelve months, two weeks, which we have concluded meets the intention of the twelve-month requirement.
It is our intention to perform the six-and twelve-month intervals period testing requirements listed in Attachment I during the refueling outage currently scheduled to commence Maleh 17, 1972. I will assume you are in agreement with our interpretation of the above-mentioned testing interval requirements unless I hear differently.
Yours very truly, 5
N ggja
'h
/[dW[
RBS/ map 8'g 8'2 8197 p1 Ralph B. Sewell g
Nuclear Licensing Administrator W
m
~
8101100580
(
1
'(
kt ufatery File Cy.
ATTACHNENT 1
.:.:w: ? ~ S~{~ l c1 ua: ;...
V.
Periodic Testing Performed As Required by the Technical Specifications The following tabulation shows the required frequency of testing, plus the testing date of the systems or functions, which may be periodically tested per Technical Specifications:
System or Function.
Frequency of Dates Undergoing Test Routine Tests Tested
' Control Rod Drives Continuous withdrawal and inser-Each major refueling 9/11/71 a
tion of each drive over its stroke and at least once every with normal hydrculic system pressure six months during peri-Minimum withdrawal time shall be ods of power operation.
23 seconds.
Withdrawal of each drive, stopping.
Each major refueling 9/11/71 at each locking position to check and at least once every latching and unlatching operations six months during and the functioning of the position periods of power opera-indication system, tion.
Scram of each drive from the fully Eachmajorrefuelingand9/10/71 withdrawn position. Maximum scram at least once every six time from system trip to 90% cf months during periods insertion shall not exceed 2.5 of power operation.
seconds.
Insertion of each drive over its Each major refueling 3/3/71 entire stroke with reduced but not less than once hydraulic system pressure to a year.
determine that drive friction is normal.
Control Rod Interlocks Rod withdrawal blocked when any Each major refueling 2/26/71and two accumulators are at a pressure but not less frequently 3/3/71 below 700 psig.
than once every twelve months.
Rod withdrawal blocked when two of Each major refueling 3/3/71 three power range channels read below but not less frequently 5% on 0-125% scales (or below 2%
than cnce every twelve on their 0 40% scales) when reactor months.
power is above the minimum operating range of these channels.
Rod withdrawal blocked when scram Each major refueling 3/3/71 dump tank is by-passed.
but not less than once l
every twelve months.
I Rod withdrawal blocked when mode Each major refueling 3/3/71 selector' switch is in shutdown but not less frequently
- position, than once every twelve months.
~
~
-System or Function Frequency of Dates Undergoing Test Routine Tests Tested Other Post-incit'ent spray system Automatic At each ma,jor refuelins 3/3/71 control operation shutdown but not less frequently than once a year.
Core spray system trip circuit.
Not less frequently' 3/ 10/71 than once every twelve months.
Emergency condenser trip circuits.
Not less frequently than 3/12/71 once every twelve months.
One squib valve shall be removed Annually 2/28/71 and test fired (Liquid poison system).
Containment Isolation valve operability and Atleastonceeverytwelve3/4/71~
leak tests.
months.
Penetration inspection.
At least once every 3/2/71 twelve months.
i
I i
- P
$- 4 'Y
.~ $
e
'i f
7, (;
M4.}.', ;
i bl
~. <
FROht DATE OF DOCUMENT:
DATE RECEIVED NO.:
Censumers Power Cercen reb. 13, 1971 rob. 28, 1972 3
Jackson, Mich.
49201 u R.
u EuO.
ORT:
Omm talph B. Sewell X
70.
O R6G.;
CC; OTH ER.
Dr. Peter A. Morris 1 signed & 5 addid cys rec'd ACTION NECESSARY CONCURRENCE O
o*TE ^~swEaEo:
NO ACTION NECESSARY O CO-E~T O
v:
CLA558 F :
POST OFFICE FILE COog, R EG. N O-DESCRIPTION. (Must Be Uptlasuned)
REFERRED TO DATE RECEIVED =Y DATE e
Ltr ady of the six & twelve month II"'*""
intervals of periodic testing for Big Rock Plant w/attchest entitled F Mi Testing Farforwd as Required by Tech
'""*""" S pe c s"......
Kg File Cy i
MC MR OGC-Rm-F-5064 c - liance C )
Nuntslag & Staff a_ % son
{
~
{'} {i /, llF]-} 5 Morris /Schrogder skov% dt uuARas:
Boyd I
gqp-EGIAING 16 CYE FOR ACES m.gaagg
.vm R.D. E. EPL1 pr1E(Laughlin)
LJ5 l
uETcfBuchanan)
DL u.s ATouc curacTcouuission M All CONTROL FORM FOa= *Ec-sus A U.S. G O V E R NM E N T P RI N TIN G O F FI C E r.l S71 -4 2.-46 2 i
-7
,c
- l,'
P 15 O!
i1l M., I g(Y(:,,
Mih.f;f.q,,
S i
-(. c '*q
-u P00R BRIGINAL
-