Forwards Site Visits - Fire Protection Program Evaluations & Proposed Agenda for Site Visit
ML20002C591
Person / Time
Site: Big Rock Point File:Consumers Energy icon.png
Issue date: 12/30/1976
From: Ziemann D
Office of Nuclear Reactor Regulation
To: Sewell R
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
References
NUDOCS 8101100531
Download: ML20002C591 (5)


Text

.

DISTRIBUTION

.t.

Docket NRC PDR Local PDR ORB #2 Reading Docket No. 50-155 TJCarter DLZiemann DEC 3 01976 RMDiggs-A EAReeves RPSnaider Consuaers Power Cor.pany 0 ELD ATT!i: fir. Ralph B. Sewell OI&E (3)

Ruclear Licensing Engineer DEisenhut 212 West !!ichigan Avenue TBAbernathy Jackson, litehigen 49201 JRBuchanan ARS(l[")

Gentlemen:

RE:

Site Visit, Fire Protection Program Evaluation Enclosed are (1) a cescription of our program for site visits, entitled

" Site Visits - F. ire Protection Procran Evaluations" and (2) the proposed Agenda for thi,s site visit at Big Rock Point. The Operating Reactors Project Itanager will be in contact with your staff, af ter you have received this infomation, to discuss the schedule and any questions you say have.

Sincerely,

%d alsmed by Dennis L. Ziman Dennis L. Zienann, Chief Operating Reactors Branch #2 Division of Operating Reactors

Enclosures:

1.

Infornation Sheet 2.

Agenda cc w/ enclosures:

See next page 8101100f3(

/

et r e $&

I

(

DOR:0RB)2 DOR:0RB #1 00R:0RB #2 EAR [ddsiro TWambach DLZiemann l

E /.?//7.4._

/R /30/74 IL6J/76 W us o. oovastnomasrv painns64 orrses4 sere-ese.4a2 NRC PORM 318 (9 76) NRCM 0260

{

(

03 76 i

i t

December 1, 1976 AGENDA FOR SITE VISIT - FIRE PROTECTION 1.

Introduction by NRC i

4 a.

Purpose of Visit b.

Method of Site Review 2.

Comments by Licensee a.

Any restrictions b.

Brief description of plant layout i

3.

Administrative Controls Discuss:

s.

Fire Protection Organization b.

Fire Hazard Control i

C.

Control of Ignition Sources d.

Fire Brigade Organization and Training

}

e.

Plant Personnel Indoctrination f.

Fire Fighting Plans g.

Quality Assurance for Fire Protection h.

Controls over Fire Protection Systems 4.

Plant Review a.

Examine each of the following safety-related areas:

(1) Control Room / Computer Room Area (2) Cable Spreading Room,

(3) Battery Rooms (3) Diesel Generator Rooms (5) Switchgear Rooms (6) Safety-Related Pump Areas (7) Fuel Building (8) Borated Water Storage Tank and Reactor Building Spray Chemical Additive Tanks (9) Containment (where accessible) b.

Examine other areas / hazards, including:

' (1) Turbine lubrication and control oil storage and use areas.

(2) Diesel Fuel / Auxiliary Boiler Fuel Oil Stora'ge Tanks (3) Radwaste Area (4) Decontamination Area (5) Records Storage Area e-r--

a 4

~

(

DEC 0 31976 (6) Auxiliary Boiler Area (7) Fire Pump Areas (8) 011 Filled Transformers (Indoor and Out door)

(9) Hydrogen - Storage, use, and processing areas c.

As applicable, the above areas will be examined for:

(1) General conditions, congestion, and accessibility (2) Separation between redundant trays and conduits (3) Barriers and fire stops (4) Fire detection and suppression equipment (5) Ventilation Systems and controls (6) Floor drains (7) Communications equipment (8) Lighting (9) Combustible materials (10) Equipment protection from water damage (11) Ability to contain fire, or isolate from external fire (12) Means for containing oil spills (13) Means. for detecting hydrogen accumulation or loss of

, ventilation (battery rooms) t

~~

=

r.

m

,q i

i t

SITE VISITS - FIRE PROTECTION PROGRAM EVALUATIONS 1

Site visits will be made in-the course of our evaluation of fire These visits will be made after the assigned protection programs.

review team has reviewed all docket material related to the fire i

protection program.

The purpose of this site visit is to give the review team direct knowledge of the arrangement of safety related equipment, fire hazards, and fire protection equipment. This visit will last one to two weeks depending on the size of the facility. It will follow the attached agenda.

The participants for NRR will include:

1.

The three man review team (electrical, mechanical and fire protection' engineers).

2.

The Project Manager (at his option).

3.

The Region Inspector (at his option).

The licensee should have personnel participating in these visits who are familiar with the plant and with their responses related to the fire protection program.

~ NOTE: This visit is to gather information for the review team.

It does not substitute for an inspection by I&E; the staff will

, not discuss recommendations or deficiencies with the licensee.

The licensee should be prepared to briefly describe the plant layout with special emphasis of the locations identified in items 4 a and b of the agenda.

5 e

i F

f i

.-Y'.

i k

Consumers Power Company December 30, 1976 L

cc w/ enclosures:

Mr. Paul A. Perry, Secretary Consumers Power Company 212 West Michigan Avenue

- Jackson, Michigan 49201 Charles F. Bayless Of Counsel Consumers Power Company 212 West Michigan Avenue Jackson, Michigan 49201 George C. Freeman, Jr., Esquire

,Hunton, Williams, Gay and Gibson 700 East Main Street Richmond, Virginia 23212 Peter W. Steketee, Esquire Freihofer, Cook, Hecht, Oosterhouse