Text
b
[
%
UNITED STATES
[ s-
g
NUCLEAR RSGULATORY COMMISSION
i
o,'
,j
REGldN IV
-[ 8
611 RYAN PLAZA DRIVE. SUITE 1000
ARLINGTON, TEXAS 76011
-
,, ,,
3
In Reply Refer To:
November 19, 1980
o
R
Docket No. 50-445/Rpt. 80-28
v
"'
50-446/Rpt. 80-28
,,;a
. .%
A
,
c;
a
s =,
Texas Utilities Generating Company
M
_
-=
- .
y
N
Attn: Mr. R. J. Gary, Executive Vice
G'
ru
2
"
President and General Manager
2001 Bryan Tower
Dallas, Texas 75201
Gentlemen:
This refers to the inspection conducted by Mr. L. D. Gilbert of our staff during
the period November 3-6, 1980, of activities authorized by NRC Construction
Permits No. CPPR-126 and 127 for the Comanche Peak facility, Units No.1 and 2,
and to the discussion of our findings with Mr. R. G. Tolson of your staff at
the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examination of procedures and representative records, interviews
with personnel, and observations by the inspector.
Within the scope of the inspection, no items of noncompliance were identified.
One new unresolved item is identified in paragraph 3.a of the enclosed report.
In accordance with Sectio: 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If the
report contains any information that you believe to be proprietary, it is
necessary that you submit a written application to this office, within 20 days
of the date of this letter, requesting that such information be withheld from
public disclosure. The application must include a full statement of the reasons
why it is claimed that the information is proprietary. The application should
be prepared so that any proprietary information identified is contained in an
enclosure to the application, since the application without the enclosure will
also be placed in the Public Document Room.
If we do not hear from you in this
regard within the specified period, the report will be placed in the Public
Document Room.
l
%
l
l
8101100(7 l ,
1
l
'
_
.
.
.-
_
_ ._.
.
.
Texas Utilitien Generating Company
2
November 19, 1980
,
Should you have any questions cont'erning this inspection, we will be pleased
to discuss them with you.
Sincerely,
-
fi, f.
l
6-
W.C.Seidle[ Chief
Reactor Cokstruction and
Engineering Support Branch
Enclosure:
IE Inspection Report No. 50-445/80-28
50-446/80-28
cc: w/ enclosure
Texas Utilities Generating Company
Attn: Mr. H. C. Schmidt, Project Manager
2001 Bryan Tower
Dallas, Texas 75201
.
4
, --. -
-
,_
_
_.