ML20002C308

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-298/80-16 on 801021-24 & 29-31.No Noncompliance Noted
ML20002C308
Person / Time
Site: Cooper Entergy icon.png
Issue date: 11/14/1980
From: Madsen G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Pilant J
NEBRASKA PUBLIC POWER DISTRICT
Shared Package
ML20002C309 List:
References
NUDOCS 8101100029
Download: ML20002C308 (2)


See also: IR 05000298/1980016

Text

_

_

CENTRAL FILES

/g .,,\\

UNITED STATES

PDR:HQ

[>

v1

NUCLEAR REGULATORY COMMISSION

LPDR

b

REGION IV

,-

g

',

/

611 RYAN PLAZA ORIVE SUITE 1000

l

"q

-;

t,

ARUNGTON, TEXAS 76011

,

, ,

November 14, 1980

-

3

In Recly Refer To:

'fj

Docket No. 50-298/80-16

-

ni

']

55

Nebraska Public Power District

ATTN:

Mr. J. M. Pilant, Director

Licensing and Quality Assurance

P. O. Box 499

Columous, Nebraska 68601

Gentlemen:

This refers to the inspection conducted by Mr. R. G. Spangler of this office

during the period of October 21-24 and 29-31,1980, of activities authorized

by NRC Operating License DPR-46, and to the discussions of the findings with

Mr. L. C. Lessor.

Areas examined during the inspection and our findings are discussed in the

enclosed report. Within these areas, the inspection consisted of an examination

of procedures and representative records, interviews with personnel, and obser-

vations by the inspector.

Within the scope of this inspection, no items of noncompliance were identified.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inscec-

tion report will be placed in the NRC's Public Document Room.

If the report

contains any information that you believe to be proprietary, it is necessary

that you submit a written application to this office within twenty (20) days

of the date of this letter, requesting that such infomation be withheld from

public disclosure. The application must include a full statement of the

!

reasons wny it is claimed that the information is oroprietary.

The acolication

snoulo be preoarea so :nat any croarietary i'nfomation icentifiec is contained

in an enclosure to the aoplication, since the application without the enclosure

will also be placea in the Public Document Room.

If we do not hear from you

in this regard within the specified period, the report will be placed in the

?ublic Document Room.

I

1

l

l

l

8101 100091 ~

_ _ -

i

.

.

Necraska Public Power District

2

Novemeer 14, 1980

Shoulo you have any questions concerning this inspection, we will be pleased

to discuss them with you.

Sincercly,

l

YGC

G. L. Madsen, Chief

Reactor Operations and

Nuclear Support Branch

Enclosure:

Inspection Report No. 50-298/80-16

cc w/ enclosure

L. C. Lessor, Superintendent

,

i

Cooper Nuclear Station

P. O. Box 98

3rownville, Nebraska 68321

.

I