References
RTR-NUREG-0737, RTR-NUREG-737, TASK-2.B.4, TASK-2.E.4.2, TASK-2.K.3.17, TASK-2.K.3.30, TASK-2.K.3.44, TASK-3.A.2.1, TASK-3.D.3.3, TASK-3.D.3.4, TASK-TM LAC-7296, NUDOCS 8101090042
Download: ML20002C061 (2)


Text

4 G DAlRYLAtVD h

COOPERAT/W

  • eo Box si7 2 sis EAST AV SOUTH
  • LA CROSSE. W1SCONSIN 54601

.S'i teostrasaooo

~~

ca December 31, 1980 In reply, please

]m.

refer to LAC-7296 DOCKET NO. 50-409 U.

S. Nuclear Regulatory Commission ATTN:

Mr. Darrell G. Fisenhut, Director Division of Licensing Office of Nuclear Reactor Regulation Division of Operating Reactors Washington, D. C.

20555

SUBJECT:

DAIRYLAND POWER COOPERATIVE LA CROSSE BOILING WATER REACTOR (LACBKR)

PROVISIONAL OPERATING LICEFSE NO. DPR-45 POST TMI REOUIREMENTS

References:

(1)

NEC Letter, Eisenhut to All Operating Reacters, dated October 31, 1980.

(2)

DPC Letter, Linder to Denton, LAC-6769, dated January 31, 1980.

(3)

DPC Letter, Linder to Eisenhut, LAC-7112, dated September 3, 1980.

Gentlemen:

Your issuance of NUREG-0737 (Reference 1) sumnarized the reauirements for Post Three Mile Island action items.

Our responses to the previous guidelines of NUREG-0578 (Reference 2) and NUREG-0660 (Ref-erence 3) together with additional submittals previously made, repre-sent our contemplated actions and our requests for exemptions.

The refueling outage currently in progress combined with the ASLB hearings on site liquefaction have occupied the attention of staff personnel which are completing information requested in NUREG-0737.

We will submit the required documentation by the dates listed below.

As these requested extentions do not represent delays in completion of modifications, no compensating safety actions are proposed for the interim.

Item Action Revised Date I.A.ll STA training to Category B as identi-January 15, 1981 fied in previous submittals is com-pleted.

A long-term program description as required by NITPEG-0737 remains to be submitted.

l l l

8.10 J 0 9 0 0'/8-

[

Mr. Darrell G.

Eisenhut, Director LAC-7296 Division of Licensing December 31, 1980 Item Action Revised Date II.B.4 Prepare training program for miti-January 15, 1981 gating core damage and have program available for review.

II.E.4.2 Review of containment pressure set-February 2, 1981 point for isolation function.

II.K.3.17 Report on outages of emergency core January 15, 1981 cooling systems.

II.K.3.30 Schedule a meeting for review of February 2, 1981 small break LOCA model.

II.K.3.44 Provide results of evaluation of January 15, 1981 anticipated transients with single failure.

III.A.2.1 Submit revised radiological emergency February 2, 1981 response plan.

III.D.3.3 Complete training on procedures January 15, 1981 governing use of single channel analyzer.

III.D.3.4 Feview of control room habitability.

February 2, 1981 If there are any questions regarding this letter, please let us know.

Very truly yours, DAIRYLAND POFER COOPERATIVF

,/

Frank Linder, General Manager FL:JDP:af cc: