muu Jersey Central Power & Light Company I"
F Madison Avenue at Punch Bowl Road ti
'e
='
Mornstown, New Jersey 07960 (201)455-8200 January 6, 1981
r.
CarrelI 3. Eisenhut, Directcr Director of Licensing
- ftice of Nuclear Reactor Regulation J. 5. '.uclear Regulatcry Commission
- asning en, D. 2.
20555 Jear Yr. Eisennut:
Subject:
Oyster Croes Nuclear Generating Staticn Occket No. 50- 9 2.lg
'4UREG 07.:7
'w;EG-C737 was transmitted to us by vcur letter datec October 31, 1980.
As recuestec in vcur letter,
.e are prov icing confirmation that we can eitner maxe tne imalenentation dates of NUREG 0737 cr for the cates.e cannot meet.e have Orcccsec revised dates and justification for the celays. Enclosure 1 lisis a:1 the to ics listec in 0737 that apply to Oyster Creek anc nave een ccepletec cr
.ill te comple*ed on senecule. Encfosures 2, 3, 4, and 5 describe those to:ics
.nich soply to Oyster Creek and for which ne are proposi ng a change to the i~piementa+ ion scnecule er eriteria cescritec in NUREG C737.
.i e are no+ in a p c s i t i on to corr. i + to neet those scheculed dates in NUREG 0737 that are "TO BE DETER'.11NED" (T3D ). '.. hen those dates are establishec, we
.ill assess cur a:ility to meet them at tnat time.
cr items that recu ire moc i f icat i on s to the S t at i on,.e will make every attempt to meet all the criteria establisned in the NUREG. sowever, in the event material, equipment, or instrumentation.nien meets all the criteria cannc' be procured in time to meet the senecule, we will use a suitable substitute. The cualifiec material, ecuipment, or instrumentation.ill be installed at the first plannec outage of sufficient duration after it is receivec onsite.
Inis ;3tter ref l ects +he present status of cur committment to NUREG 0737.
It in the cours? cf imclemen*ing tne items in NUREG un f orseen problems arise, you nii l te ncm itiec promotly.
Also pfease note that the designs of
~ccifications provicec are cnly preliminary in nature and may undergo changes curing tneir engineering anc safet/ revie s.
These cnances.ill be fcrwarced to you uccn completion of tne mccification.
t 81010-9 003Y f
Ce"t'T Power & L c"! Ccmcany :s 3 Mem0er of !"e General Puc5C Ut i es Sys:em
.-:r 9f i
r.
L.
O. Eisee.u?
January 6, 1981
- ? <cu s cu l c nave w, cues t iens conc ?r n i n.; cur enacnse, clease ccn ec+ ;.
"nacei (2;1-455-3753) ct y start.
/er v r Ji v curs, A.
Ivan ;. rintre
- r lice ? esieen?
3 crn anc at tir cc ::etere e on this 6th civ cf January iHl.
Ju:1ic J+0?1r,
- M
.c :. i e '.... u.- :1;..:a 52Y 14 Caa.ma..ma L;aes Aag. 16,1934 l
l l
l l
i 1
I l
l
I L
I l
NUREG 0737 Items That Have Been Completed or Will Be Completed en Schedule 3
Ites No.
Short Title Description Remarks 1.A.1.1 Shift Technical Advisor 1.
On duty 2.
Tech specs 3.
Trained per LL Cat B i
4.
Describe long-3 term program i
1.A.1.2 Shift supervisor Delegate non-responsibilities safety duties 1.A.1.3 Shift manning 1.
Limit over-time t
2.
Min shift crew l
1.A.2.1 I= mediate upgrading 1.
SRO exper of RO and SRO training
'2.
SR0s be R0s and qualifications 1 yr.
3.
Three no trng on shift 4.
Modify training 5.
Facility l
certification 1.A.2.3 Administration of Instructors complete training programs SRO exam 1.A.3.1 Revise scope and 1.
Increase scope i
criteria for licensing 2.
Increase pas-exams sing grade 3; Simulator exams i
i 1.C.1 Short-term accident 1.
SB LOCA and procedures review' 2.
Inadequate core cooling a.
Reanalyte and propose guide-l lines b.
Revise pro-i cedures 3.
Transients 5 accidents i
a.
Reanalyse and propose guidelines I
b.
Revise l
procedures l
Item No.
Short Title Description Remarks i
1.C.2 Shift 5 relief Implement shift turnover procedures turnover checklist i
1.C.3 Shift-s apervisor Clearly define responsibility superv 5 oper responsibilities I
1.C.4 Control-room access Establish authority, limit access 1.C.3 Feedback of operating License to experience i=plement procedu.;es 1.C.6 Verify correct Revise performance of performance operating activities procedures 1.D.1 Control-room Preliminary design reviews assessment and schedule for correcting deficiencies
.i l.D.2 Plant-safety-
- 1. Description parameter display
- 2. Installed console
- 3. Fully implemented 11.B.1 leactor-coolant-
- 1. Design
- ystem vents 2.. Install vents (LL Cat B)
- 3. Procedures 11.B.2 Plant shielding
- 1. Review designs
- 1. Plant modifications (LL Cat B)
- 3. Equipment qualification 11.B.3 Postaccident
- 1. Interim system sampling
- 2. Plant modifications (LL Cat B) 4 i
s
,.,e.v.
w.,,-,v
.n.
.., e
,r..n
~,-,,
.w n
-n-
1
' i Item No.
Short Title Description Remarks 11.B.4 Training for
- 1. Develop train-
=itigating ing program core damage
- 2. Implement program
- a. Initial
- b. Complete 11.D.1 Relief S safety-
- 1. Submit program valve test
- 2. RV S SV testing l
requirements (LL Cat B)
- a. Complete testing
- b. Plant-i specific report
- 3. Block-valve Not applicable testing 1
11.D.3 Valve position
- 1. Install direct indication indications of valve position i
- 2. Tech specs 11.E.4.1 Dedicated hydrogen
- 1. Design penetrations
- 2. Install 11.E.4.2 Containment 1-4. Imp. diverse isolation Isolation dependability
- 5. Cntmt pressure setpoint
- a. Speficy pressure l
- b. Sbdifi-cations
- 6. Cntmt purge l
valves
- 7. Radiation See Enclosure 2 i
signal on purge valves i
S. Tech specs 11.F.1 Accident-
- 1. Noble gas See Enclosure 3 monitoring monitor Iodine /
l particulate l
sampling
- 3. Containment high-range monitor
- 4. Containment pressure i
i
l 4-4 Item No.
Short Title Description Remarks l
11.F.1 (continued)
- 5. Containment water level
- 6. Containment hydrogen 11.F.2 Instrumentation for
- 1. Subcool meter Not Applicable detection of
- 2. Tech spec Not Applicable inadequate core (LL Cat A) cooling
- 3. Install level instruments (LL Cat 3) 11.K.1 IE Bulletins 79-05, 06, 08 11.K.3 Final reco=mendations,
- 3. Reporting SV 5 BSO task force RV failures 5 challenges
- 16. Challenges a failures to relief valves
- a. Study 4/1/S1
- b. Modify 1st refuel or 1 yr.
after approval
- 17. ECC 1/1/81 system outages
- 18. ADS actuation
- a. Study
- b. Propose mods
- c. Modifica-tion
- 19. Interlock recire pump modification
- 21. Restart of CSS S I.PCI
- a. Design
- b. Modifica-tion
- 25. Power on pump seals
- a. Propose mods-
- b. Modifications
- 27. Common ref level
- 29. Performance of isolation condensers
Item No.
Short Title Description Remarks 11.K.3 (continued)
- a. schedule outline
- b. Model
- c. New analyses
- 31. Compliance with CFR-50.46
- 44. Eval tran-See Enclosure 4 sient with single failure
- 45. Manual depres-See Enclosure 4 suri:ation
- 46. Michelson concerns
- 57. Manual act of ADS 111.A.1.1 Emergency Short-term preparedness, improvements short term 111.A.1.2 Upgrade emergency
- 2. Design
- 3. Modifications 111.A.2 Emergency
- 1. Upgrade emer-preparedness gency plans-to App. E, 10 CFR 50
- 2. Meteorological data s
111.B.1.1 Primary coolant
- 1. Leak reduction outide containment
- 2. Tech specs L
111.D.3.3 Inplant radiation
- 1. Provide means monitoring to determine presence of radiciodine l
- 2. Modifications to accurately measure I2 111.D.3.4 Control-room
- 1. Review habitability
- 2. Modification See Enclosure'5 4
i l
1
1CREG 0737 iTE" i I.E.a.2 i n ei,
it.E.4.2, Ocn+ainment Isclation Cecencacility has a recuirement +na*
rne "Ccriainment curge enc vent iscla*icn valves must closa on a niqh racia* ion signal."
The schedule as croccsea in NUREG 0737 is to recuire trat this ce impicmentec by July 1, 19el, hc.ever in 'ne Ocdy of the cescr iotion i* states:
"R sition 7 (Durge 1 vent isolation on hign racia-icn) shall be i-'clementec oy July I, 1951 cr curing the folicwing cutaas of sutticient duration, bu+ no later
- nan January 1,
1982."
l*
is cur in*ention to utilize the containment high aciation signal as the isola *icn signal for these valves.
Since the todificaticn implementing the Containment Hign Pacia*icn requirements is not vue until January 1, 1982, ne propose to acccmplish containment vent anc purge isolation modificatien en the same schecule.
Encicsure 3
- U7EG 0737 iTE" iI..:.1.2
- tem it.
- .i.2, lacine/3 articles Sampling, requires a cesicn casis shielding enveloce of ICE 2 uci/cc of gaseous radiciccine and particula *es ceccsitec cn *be sanoting mecia.
- c. e tinc
+na*
.e cannc? meet this cri*eria nitn the instrumen*a*icr availaDie betere January 1, 1982.
c.e arc theref ore installing an en fine system ter acnitoring iccine anc carticulates in the exhaust un to levels cf ILE-2*uci/cc. Also arcvisions will De providec for c0 ta i n i n g a ';r ab sa cle that can te analv:ec cn si+e uc to concen*raticns required by +his cri*eria.
ae tneretcre feel this crovices adecuate coverage for monitoring any vostulated relaases tree the clant.
t
1 t
l NUREG 0737 ! TE'.?S I i.<.3.30, Ii.K.3.44 A 1I.4.3.45 l*G.T.s ll.K.3.30, ll.K.3.44 inc li.K.3.45 are items
- hat are being accressoc oy the SWR o.ners of which we are a me.ber, ae nave not yet been able to evaluate the c ners group responses ter ineir applicability to the Oyster Creek 1
facility.
..e ex;;ect to nave that eval uaticn ccmp te o anc cur res;cnse on these itee.s sent to vou :y ecruary 15, 1931.
r t
8 I
l l
t l
I
J Encicsure 5 NUREG 0737 t TE'? tiI.D.3.4 i*em Ill.D.J.4, Controt :<cen l'ac i ?cb i l i ty, recuires tha? the facili*y centret te uograced to eet tne criteria sta*ec in 'iURE3 0737 tv January 1, 1935.
As a result et cur evaluation tc da*e, the Oyster Crces control rccm ventitation system :ces no* mee* Starcard Revie. Stan criteria,.hich Tav result in extensive eng i neer i ng construction changes at the si*e. Theretcre, ae niil ret ce a:le to meet tne January 1,
1923 schecule.
Our evaluation nitt be cen ! eTe by ri c 1981. At that time ne will previce you with the cutccme et that eval uaticn anc a senecule ter.eeting the requirements of this item.
_