Agenda for 247th ACRS Meeting to Be Held on 801006-08 in Washington,Dc to Discuss Use of Risk Assessment by NRC to Establish Priority for Regulatory Actions
ML20002B704
Person / Time
Issue date: 10/27/1980
From:
Advisory Committee on Reactor Safeguards
To:
NRC COMMISSION (OCM)
Shared Package
ML20002B702 List:
References
NUDOCS 8012220501
Download: ML20002B704 (4)


Text

_.

- h[na aseg'c UNITED STATES NUCLEAR REGULATORY COMMISSION

~,

!",,g 7j ADVISORY COMMITTEE ON REACTOR SAFEGUARDS 3

r W ASHINGTON, D. C. 20555 k i @[f g, v October 27, 1950 SCHEDULE AND OUTLINE FOR DISCUSSION 247TH ACRS MEETING NOVEMBER 6-8, 1980 WASHINGTON, DC H Ftreet, NW, Washincton, DC Thursday, November 6,1980, Room 1046.1717 1) 8:30 A.M. -10:00 A.M.

Oceninc Session (0 pen) 1.1) 6:30 A.M.-8:45 A.M.: ACRS Chaiman's Recort (MSP/REF) 1.2) 8:45 A.M.-9:00 A.M.:

Report of ACRS Nominatina Panel regarding candi-dates fo: ACRS Chaiman and Vice-Chaiman for CY 1981 (SL/RFF) 1.3) 9:00 A.M.-10:00 A.M.:

Discuss topics for meeting with Gov. Bruce Babbitt, Chairman, Nuclear Safety Oversight Comittee:

1.3-1) Methods to strengthen the ACRS role in the regulatory process (NB/RFF)

Meeting with Gov. Bruce Babbitt. Chairman, 2) 10:00 A.M. - 12:00 Noon Nuclear Safety Oversiant Committee (0 pen) 12:00 Noon

-1:00 P.M.

LUNCH Discuss items for meeting with NRC Chaiman and _

3) 1:00 P.M. - 2:00 P.M.

Comissioners.(Open) _

3.1) Use of risk assessment by NRC Staff _

to establish priority for regulatory _

actions (e.g., seismic design of auxiliary feedwater systems)(00) 3.2) Clarification of Com. V. Gilinsky's request for ACRS/NRC Staff considera-tion of changes-to decay heat removal systems in the North Anna Nuclear ?lant Unit 2 (D0) 3.3) Interim response to request from Chair-man J. F. Ahearne regarding new safety concepts for new nuclear power plant designs (D0) 3.4) Proposed change in famat/ conclusion in ACRS reports per suggestion by Commissioner V. Gilinsky (WK)

'8012220 pof

. 247TH Mtg. Schedule Meeting with NRC Chairman and Commission-4) 2:00 P.M. - 3:00 P.M.

ers (0 pen) - Discuss items noted above General Electric Test Reactor (0 pen) 5)

3:00 P.M. -

6:30 P.M.

5.1) 3:00 P.M. - 3:30 P.M.:

Report of ACRS Subcommittee regarding seismic modifications and proposed operation

~(WK/EI) 5.2) 3:30 P.M. - 6:30 P.M.:

Meeting with representatives of the NRC Staff and the applicant (Note: Portions of this session will be closed as necessary to discuss Proprietary Information applicable to this project.)

Friday, November 7,1980, Room 1046,1717 H Street, NW, Washington, DC Meeting with NRC Staff (0 pen) 6)

8:30 A.M. - 9:15 A.M.

6.1 ) Report regarding status of TMI-2 recovery program.

(Note: Portions of this session will be closed as necessary to dis-cuss Proprietary Information appli-cable to this project. )

Diablo Canyon Nuclear Plant (0 pen) 7)

9:15 A.M. - 11:15 A.M.

7.1) 9:15 A.M. - 9:45 A.M.:

Report of ACRS Subcommittee regarding. seismic _ -

interaction study (D0/RS) 7.2) 9:45 A.M. - 11:15 A.M.:

Meeting with representatives of the NRC Staff and the applicant._.

(Note: Portions of this session will be closed as necessary to discuss Proprietary Information applicable to this project.)-

l BWR Hydraulic Scram Systems _- Discuss pro _ __

8) 11:15 A.M. - 12:15-P.M.

posed ACRa report to NRC (0 pen) (00/HE/ALB) 12:15 P.M. - 1:15 P.M.

LUNCH l

l l

Y-

~2 w e

. 247TH Mtg. Schedule NRC Regulatory Guide 1.97, Revision 2, 9) 1:15 P.M. - 3:15 P.M.

instrumentation for Light-Water-Cooled Nuclear Power Plants to Assess Plant and Environs Conditions During and Foi-lowing an Accident (0 pen) 9.1) 1:15 P.M. - 1:30 P.M.:

Report of ACRS Succommittee (CPS /EI) 9.2) 1:30 P.M. - 3:15 P.M.:

Meeting witn representatives of NRC Staff and the nuclear industry as appro-priate Future schedule (0 pen)

10) 3:15 P.M. - 3:30 P.M.

10.1) Anticipated full Committee activ-ity (RFF) 10.2) Anticipated Subcommittee activity (MWL)

Regulatory Activities (0 pen)

11) 3:30 P.M1 -

3:45 P.M.

11.1) Report of Subcommittee regarding Regulatory Guide 1.12, Revision 2, Instrumentation for Earthquakes (CPS /SD)

ACRS Reports / Letters to-NRC (0 pen)

12) 3:4E P.M -

6:30 P.M.

Diablo Canyon Nuclear Plant -(D0/RS) 12.1) 12.2) BWR Hydraulic Scram Systems -(D0/JE/ALB) 12.3) New safety concepts =for new-nuclear-power plant designs interim-reply--- -.

(D0/RS) 12.4) Proposed ACRS-letter regarding the --_- _

Nuclear Data Link 1(WK/JB/GRQ)~.-

(Note: Portions of this session will be closed as necessary to discuss Proprietary Information applicable to these subjects.)

l l

(

l l

~

. 247TH Mtg. Schedule Saturday, November 8, 1980, Room 1046, 1717 H Street, NW, Washington, DC

13) 8:30 A.M. - 10:00 A.M.

ACRS Recorts to NRC (0 pen) 13.1) General Electric Test Reac-tor (WK/EI) 13.2) Regulatory Guide 1.97, Revision 2, Instrumentation for Light-Water-Cooled Nuclear Power Plants to Assess Plant and Environs Conditions During and Following An Accident (CPS /SD) 13.3) Nuclear Data Link (WK/JB/GRQ)

NRC Interim Recuirements Related to 14) 10:00 A.M.- 12:00 Noon Hydrogen Control and Certain Degraded Core Considerations (10 CFR Part 50)

(0 pen) 14.1) 10:00 A.M.-10:30 A.M.:

Report of ACRS Succommittee on Regulatory Activities (CPS /SD) 14.2) 10:30 A.M.-12:00 Noon:

Meeting with representatives of NRC Staff and the nuclear industry as appro-priate.

15) 12: Noon - 12:45 P.M.

Meeting with NRC Staff (0 pen) 15.1) Report regarding status of design /

research effort to develop a sys-tem for the control of combustible gasses for the Sequoyah Nuclear Plant.

12:45 P.M. - 1:45 P.M.

LUNCH 16) 1:45 P.M. - 3:15 P.M.

Generic Items Acolicable-to Light Water 7___

Reactors (0 pen) (PGS et al/RKM et al) 16.1) Reports of designated Subcommittee Chainnen regarding the-status _of_ _

ACRS generic items applicable to LWRs.

i 17) 3:15 P.M. - 4:00 P.M.

Miscellaneous _ (0 pen / Closed) 17.1) Report by ACRS Chairman regarding meetings with RSK/FRG representa-l tives and JAERI representatives (Closed)(MSP) 17.2)