l T r Q.-

-ar

, g,g M 6/ ' A ' W ' '

o UNITED STATES l'

,(

)

NUCLEAR REGULATORY COMMISSION 3.

j REGION I 3,,

$31 PARK AVENUE

,e,g KING oF PRUSSIA. PENNSYLVANIA 19406 November 6,1980 Docket'Nos. 50-354 50-355 Peblic Service Electric and Gas Company A iTM.

Mr. T. J. Martin ci Vice President Engineering and Construction 3

1 80 Park Place Newark, New Jersey 07101 Gentlemen:

The enclosed IE Bulletin No. 80-21, " Valve Yokes Supplied by Malcolm Foundry Company, Inc.," is forwarded to you for action.

A written response is required.

In order to assist the NRC in evaluating the value/ impact of each Bulletin on licensees, it would ce helpful if you would provide an estimate of the manpower expended in conduct of the review and preparation of the report (s) required by the Bulletin.

Picase estimate separately the manpower associated with corrective actions following identification of problems through the Bulletin.

If you desire additional information regardi.ng this matter, please contact this office.

Sincerely, fd7WVhEf.

O So ce H. Grier wirecta-

Enclosures:

1.

IE Bulletin No. 80-21 2.

List of Recently Issued IE Sulletins CONTACT:

L. E. Tripp (215-337-52S2) cc w/encis:

E. N. Schwalje, Manager - Quality Assurance, Engineering and Construction Department 8012120 /kd g


w-~--


v

-r--

w-mey r

,s--.-.

vr

-me

-%r y-y, e,

w ~-,

-,-----my.

=*

SSINS No.:

6820 Accession No.:

8008220246 IEB 80-21 Page 1 of 3 UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT

'h r g 73 ca p WASHINGTON, D.C.

20555 i.

P D w.

. 3)

November 6, 1980 IE BULLETIN NO. 80-21:

VALVE YOKES SUPPLIED BY N/.LCOLM FOUNDRY COMPANY, INC.

Description of Circumstances:

On June 17, 1980, Pennsylvania Power and Light Company notified IE Region I that cracks had been discovered in the yokes of a number of valves in the residual heat removal (RHR) system at their Susquehanna Steam Electric Station The potential for common-mode failure of the yokes on several valves in redundant, safety-related trains of the RHR system constitutes a failure mode whereby all RHR functions could be simultaneously lost.

Specifically, the cracks were located in the radii at the yoke mounting flange-to yoke vertical section interface.

An analysis and evaluation of the most severely cracked valve yoke was performed by the valve manufacturer, Anc.'or Darling Valve Company.

They concluded that the cracking was not due to cas-ing defects, but rather was due to the yoke material not having the proper trachanical. properties.

Purchased as ASTM A-216, Grade WC8 material, the actual t alve yoke material had tensile ard yield strengths below the minimum values listed in the ASTM material specification.

The cracked valve yokes were all cast by Malcolm Foundry Company, Inc., of Newark, New Jersey.

The foundry is no longer in business.

Anchor Darling has begun a program of verifying the tensile strengths of the other valve yokes cast by Malcolm and used on Anchor Darling valves at Susquehanna.

To date, approximately half of the valve yokes have been tested.

Of those tested, over 25 percent of the valve yokes have revealed Brinell hard-ness values significantly below the appropriate value obtained from the approxi-mate relationship of Brinell hardness to tensile strength included in ASTM.

Specification A-370.

These additional valve yokes are on a wide range of valve sizes and are from a number of different purchase orders placed with Malcolm over a period of at least ten months during 1974 and 1975.

Thus, it appears that the problem is not isolated to one heat of material or to one short time period.

Anchor Darling intends to replace the defective valve yokes at Susquehanna and to begin a testing program at other nuclear power plants under construction where valves with valve yckes cast by Malcolm have been provided.

e

_y.

-w w

,w

.,.m..

IEB 80-21 Page 2 of 3 Since Malcolm Foundry Company, Inc., is no longer in business, the NRC staff cannot determine directly if Malcolm has provided valve parts to other valve manufacturers for use in nuclear power plants.

Actions To Be Taken by Addressees:

For all power reactor licensees or holders of construction permits the following actions are required:

1.

Determine if any of the retive valves in use or planned for use in safety-related systems at your facility have valve parts cast by Malcolm Foundry Company, Inc.

If no valves are identified as having potentially faulty material, indicate that this is the case and ignore the remaining questions.

2.

Licensees having active safety-related valves with potentially faulty material shall immediately visually inspect for cracks all normally accessible valve parts (i.e., those which can be inspected during reactor operation).

3.

Licensees or permit holders having active safety-related valves with potentially faulty material shall identify the manufacturer (s) of these valves and either:

a.

Verify that i e parts cast by Malcolm have mechanical properties i.

.ordance with the ASTM material specification; if such is not the case, then comply with either b. or c. below also.

b.

Replace the defective materials and/or valves.

c.

Identify any other corrective actions that may be axercised and the basis for such actions.

l For plants with an operating license, the results of your initial determination l

(item 1), visual inspection results (item 2), a list of affected valve manu-facturers, your planned action (item 3), and the schedule for accomplishing this action shall be reported within thirty days of the date of this bulletin to the Director of the appropriate NRC Regional Office with a copy sent to the NRC Office of Inspection and Enforcement, Division of Reactor Construction Inspection, Washington, DC 20555.

For plants with a construction permit, the results of your initial determination (item 1), a list of affected valve manufacturer (s), your planned action (item 3) and the schedule for accomplishing this action shall be reported within sixty days of the date of this bulletin to the Director of the appropriate NRC Regional Office with a copy sent to the NRC Office of Inspection and Enforcement, Division of Reactor Construction Inspection, Washington, DC 20555.

~

IES 80-21 Page 3 of 3 Compliance with this bulletin by the licensees does not relieve the affected valve manufacturers from the reporting requirements of 10 CFR Part 21.

If you desire additional information regarding this matter, please contact the appropriate IE Regional Office.

Approved by GAO, B180225 (R0072); clearance expires November 30, 1980.

Approval was given under a blanket clearance specifically for identified generic problems.

1 f

N w

y e

9 e

w4w-

-4 r---

--4-t"-

T-"TT

'd*---9

- N c'a v

T+F

' W t

t-


g

IE Bulletin No. 80-21 November 6, 1980 RECENTLY ISSUED IE BULLETINS Bulletin Subject Date Issued Issued To No.

80-22 Automation Industries, 9/12/80 All holders of a Model 200-520-008 Sealed-radiography ifcense Source Connectors Revision 1 Boron Loss from 8/29/80 All holders to 79-26 BWR Control Blades of a BWR power reactor OL Revision 1 Failures of Mercury-8/15/80 All holders of a to 80-19 Wetted Matrix Relays in power reactor Reactor Protective OL or CP Systems of Operating Nuclear Power Plants Designed by Combustion Engineering 80-20 Failures of Westinghouse 7/31/80 All holders of a Type W-2 Spring Return to power reactor OL Neutral Control Switches or CP 80-19 Failures of Mercury-7/31/80 All holders of a Wetted Matrix Relays in power reactor OL Reactor Protective Systems or CP of Operating Nuclear Power Plants Designed by Combustion Engineering 80-18 Maintenance of Adequate 7/24/80 All holders of a Minimum Flow Thru PWR power reactor Centrifugal Charging Pumps OL or CP Following Secondary Side High Energy Line Rupture Supplement 3 Failure of Control Rods 8/22/80 All holders of a to 80-17 to Insert During a BWR power reactor Scram at a BWR OL or CP Supplement 2 Failure of Control Rods 7/22/80 All holders of a to 80-17 to Insert During a Scram BWR power reactor OL l

at a BWR l

Supplement 1 Failure of Control Rods 7/18/80 All holders of a BWR to 80-17 to Insert During a Scram power reactor at a BWR OL or CP w

s