y
p ne
'
i
o
UNITED STATES
8
o g y n F. *,..n .**NUC1. EAR REGULATORY COMMISSION
g
n
a
REGION 11
o,
101 MARIETTA ST., N.W., SUITE 3100
%'....,
ATLANTA. GEORGIA 30303
.J u
2 NSTRfDti!!ON
Sin Cis UNIT
In Reply Refer To:
RU:HGW -
YNg
"q c) Os
~
(50-416/80-2
_m-
mm
Mississippi Power and;Litht!!C6Fmpany
ATTN:
N. L. Stampley301
Vice President of Production
P. O. Box 1640
Jackson, MS 39205
Gentlemen:
This refers to the faspection conducted by A. G. Wagner of this office on September 1
through 30, 1980 of activities authorized by NRC Construction Permit No. CPPR-118-
for the Grand Gulf facility, and to the discussion of our findings held with C. K.
McCoy at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were. disclosed.
One new unresolved item resulted from this inspection and is discussed in the
enclosed report. This item will be examined during subsequent inspections.
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclosed inspection
report will be placed in the NRC's Public Document Room. If this report contains
any information that you (or your contractor) believe to be proprietary, it is
necessary that you maite a written application within 20 days to this office to
withhold such information from public disclosure. Any such application must
include a full statement of the reasons on the basis of which it is claimed that
the information is proprietary, and should be prepared so that proprietary infor-
mation identified ~ in the application is contained in a separate part of the
document. If we do not hear from you in this regard within the specified period,
the report will be placed in the Public Document Room.
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
.
Sincerely,
f.d.
m
R. C.
ewis, Acting Chief
Reactor Operations and Nuclear
Support Branch
Enclosure:
See Page 2
-
8012090
5d$
.__
7
}
. ,
,
.-
,
.
.
OCT2 21980
Mississippi Power and Light Company
-2-
3-
i
- Enclosure:-
,
i
Inspection' Report No. 50-416/80-21
cc w/ enc 1:
'
. C. K. McCoy, Plant Manager
- .