05000306/LER-1980-035-03, /03L-0:on 801103,remote/local Control Switch on Containment Spray Pump 21 Found Not in Remote Position. Caused by Contractor Workman Bumping Switch.Switch Returned to Remote Position

From kanterella
(Redirected from ML20002B069)
Jump to navigation Jump to search
/03L-0:on 801103,remote/local Control Switch on Containment Spray Pump 21 Found Not in Remote Position. Caused by Contractor Workman Bumping Switch.Switch Returned to Remote Position
ML20002B069
Person / Time
Site: Prairie Island Xcel Energy icon.png
Issue date: 12/03/1980
From: Hunstad A
NORTHERN STATES POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20002B063 List:
References
LER-80-035-03L, LER-80-35-3L, NUDOCS 8012090402
Download: ML20002B069 (1)


LER-1980-035, /03L-0:on 801103,remote/local Control Switch on Containment Spray Pump 21 Found Not in Remote Position. Caused by Contractor Workman Bumping Switch.Switch Returned to Remote Position
Event date:
Report date:
3061980035R03 - NRC Website

text

(7 77)

LICENSEE EVENT REPORT CONTROL BLOCK: l l

l l

l l

'IPLEASE PRINT OR TYPE ALL REQUIRED INFORMATION) lay IM !N lP lI lN l 2 l@l 0 l 0 l - l 0 l 0 l 0 l 0 l 0l -l 0 l 0 l@l 4 l1 l 1 l 1 l 1 l@l l

l@

8 9 LICENSEE CODE 14 15 LICENSE NUMBER 25 26 LICENSE TYPE Jo 57 CA T 58 s.ON'T E

l L @l 0 l 5 l0 l 0 l013 l 0 l 6 l@l 1 l 110 l 3 l 810 l@l112 l 01318 l o l@

S R 7

8 60 61 DOCK ET NUMBER 68 69 EVENT DATE 74 75 REPORT DATE 80 EVENT DESCRIPTION AND PROBABLE CONSEQUENCES h Io l2l l During normal operation, a control room alarm was received announcine l

l o l31 l No. 21 Containment Spray Pump in Local Control. An operator dispatched l

lo l4 l l to investigate found'the Remote / Local control switch not in the Remote l

10 i s ] l Position. Recent similar event was R0-80-28.

Tech Spec 3.3.B.1.a applies.

l l 0 l6 ) l No effect on public health and safety since redundant equipment was operable.

l 101711 I

t 101811 I

DE CO E SU8C E COMPONENT COOE SU8 ode S

E 8

l s 1 s l@ W@ lF lh IC lK lT lB lR lK l h W h W h 7

8 9

10 11 12 13 18 19 20 SEQUENTIAL OCCUR RENCE REPORT REVISION LE R EVENT YEAR REPORT NO.

CODE TYPE N O.

@sgo,/RO l218 l 01 L_j l 0l,l si Ld l 0l 3l W

l_1 l_0J a

g 22 23 24 26 27 28 29 30 31 32 K

AC O ON NT MET HOURS S8 I FOR 8.

SUPPLt MAN FACTURER

(_XJQlF l@

[Z_J@ J@

l 01 0l 0l 0l W@

W@ J@

lZ l9 l9 l9 l@

33 34 35 36 37 40 di 42 43 44 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS h 11101l Contractor worann annaronely hismnna rhn ine n1 switch.

Switch was returned l

Is lil l to the Remote position. Pump was inoperable about 10 minutes.

Covers are 1

1 7 l being fabricated for these switches and selected other safeguard switches.

I L' LJ l l

1 4 l

l 7

8 9 80

$A 5

% POWER OTHER STA~US DIS O RY D6SCOVERY DESCRIPTION

@ W @ l 1l0 l0 lh!

NA l

(A_jhl Control room nnniincintion l

ACTIVITY CO TENT aELEASED OF RELE ASE AMOUNT OF ACTIV!TY LOCATION OF RELi ASE NA l

l NA l

[l_l 6_j [Z_] @ W@l 7

8 9 to 11 44 45 80 PERSONNEL EXPOSURES NUMBER TYPE CE SCRIPitON l 0 l 0 l0 l@y@l NA l

i 7

' PERSONNELINJU ES NUVBER

DESCRIPTION

l0l0l0l@l NA l

i a 8 9 11 12 80 LOSS OF OR DAMAGE TO FACILITY TYPE

DESCRIPTION

NA l

Q W@l 7

8 9 10 80 Q ISSUE @lDESCR,PTION 8012noo 401 i

i i ii i i i i i iiily NA

- 7 8 9 10 68 69 80 %

ns 612-388-1121 NAME OF PREPARER PHONE: