ML20002B006

From kanterella
Jump to navigation Jump to search
Forwards LER 80-009/03L-0
Date released: 01/16/2020 Download: ML20002B006


LER 80-009/03L-0:on 801101,during Normal Operation, Performance of ICP 2.14 Found P8 Permissive Bistable from Channel N44 to Be Set at 50.5%.Caused by Instrument Drift. Bistable Adjusted & Tested Satisfactorily
ML20002B012
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 11/25/1980
From: Fay C
WISCONSIN ELECTRIC POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML20002B012 (1)
Forwards LER 80-009/03L-0
ML20002B005
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 11/25/1980
From: Fay C
WISCONSIN ELECTRIC POWER CO.
To: KEPPLER J G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML20002B005 (1)