Forwards IE Waste Packaging Insp Rept 15000039/80-14 on 800619 & Notice of Violation
ML20002A911
Person / Time
Site: 02700047, FitzPatrick
Issue date: 09/03/1980
From: Galen Smith
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Pasternak R
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
Shared Package
ML20002A910 List:
References
NUDOCS 8012090158
Download: ML20002A911 (2)


See also: IR 015000039/1980014

Text

-

._

.-

-

..

-

,1 *

-

j/

^

UNITED STATES

g .

=%

NUCLEAR REGULATORY CoMMisslON

,

)d

REGION l

,I

g

631 PARK AVENUE

KING OF PRUS$1 A, PENN$Yt.V ANI A 19406

,

+....

Docket No. 50-333

SEP 0 31330

Power Authority of the State of New York

James A. FitzPatrick Nuclear Power Plant

ATTN: Mr. R. J. Pasternak

Resident Manager

P. O. Box 41

Lyccming, New York 13093

Gentlemen:

Subject:

Inspection No. 50-333/80-14(15000039/80-14)

This refers to an unannounced inspection donducted by Mr. T. C. MacArthur of

our Region II office on June 19, 1980.

A shipment of radioactive waste shipped

from your facility was inspected upon arrival at the Chem-Nuclear Systems, Inc. ,

Barnwell, South Carolina disposal site.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of a

review of the shipping papers, placarding and labeling requirements, radiation

measurements, selective contamination surveys, and observaticas by the inspector.

Based on the results of this inspection, it appears that one of your activities

l

was not conducted in full compliance with NRC requirements, as set forth in the

Notice of Violation, enclosed herewith as Appendix A.

This item of noncompliance

has been categorized into the levels as described in our correspondence to you

1

t

dated December 31, 1974. This notice is sent to you pursuant to the provisions

of Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of

Federal Regulations.

Section 2.201 requires you to submit to this office,

within twenty (20) days of your receipt of this notice, a written statement or

explanation in reply including:

(1) corrective steps which have been taken by

you and the results achieved; (2) corrective steps which will be taken to avoid

further items of noncompliance; and (3) the date when full compliance will be

achieved.

.

In accordance with Section 2.790

1e NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regu.

copy of this letter and the enclosures

will be placed in the NRC's Public t~-ment Room.

If this report contains any

information that you (or your contractor)_ believe to be proprietary, it is

7ecessary that you make a written application within 20 days to this office to

withhold such information from public disclosure. Any such application must be

accompanied by an offidavit executed by the owner of the information, which

identifies the document or part sought to be withheld, and which conte. ins a

statement of reasons which addresses with specificity the items which will be

8012090/ST

..

.

.

.

Power Authority of the State

of New York

2

SEP 0 31330

considered by the Commission as listed in subparagraph (b) (4) of Section 2.790.

The information sought to be withheld shall be incorporated as far as possible

into a separate part of the affidavit.

If we do not hear from you in this

regard within the specified period, the report will be placed in the Public

Document Room.

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

'

-

_

we#

r

Geo eH Smith, Chief

Fue Fa ility and Materials Safety

B nch

Enclosures:

1.

Appendix A, Notice of Violation

2.

Office of Inspection and Enforcement Inspection

Report No. 50-333/80-14 (15000039/80-14)

cc w/ encl:

George T. Berry, President and Chief Cperating Officer

J. P. Bayne, Senior Vice President-Nuclear Generation

A. Klausmann, Director, Quality Assurance

M. C. Cosgrove, Site Quality Assurance Engineer

J. F. Davis, Chairman, Safety Review Committee

C. M. Pratt, Assistant General Counsel

G. M. Wilverding, Manager-Nuclear Licensing

4

l