O JOSEPH M. FARLEY NUCLEAR PLANT UNIT 2 NARRATIVE

SUMMARY

OF OPERATIONS l

OCTOBER, 1980 Alabama Power Company's Joseph h. Farley Nuclear Plant, Unit 2 received its Operating License (O. L.) on 10/23/80.

The projected date for initial core load is late November, 1980.

4 a

A s

8011210 390

~

OPERATING DATA REPORT DOCKET?iO. 50-364 l

DATE 11/1/80 COMPLETED BY IL G. Hairston,III TELEPlic.NE r w Aoo 5156 OPERATING STATUS a

I. Uu Nm Joseph M. Farley - Unit 2 Notes 1) Received Operating

2. Reporting Period:

October. 1980 License 10/23/80.

Initial

3. Licensed Thermal Power (MWt):

2652

. Core load W prd e M M

4. Nameplate Rating (Gross MWe):

860 late November, 1980.

5. Design E ectrical Racing (Net atWe): 829
6. Maximum Dependable Capacity (Gross MWe):

860*

e

7. Maximum Dependable Capacity (Net MWe):

829*

8. If Changes Occur in Capacwy Ratings (Items Number 3 Thsough 7) Since Last Report. Give Reasons:

NA

9. Power level To Which Restnered, If Any (Net MWe):

See item 10

10. Reasons For Restrictions.If Any:

NPF-8 O.M. Parlev Unfe 2 ifcom n n,- r., n 1 Load and s

Low Power Testing) Section 12.0 recuires certain NUREC-0694 conditions to be

~

complete prior to fuel load and zero power testing.

\\

s.

This heek YrAn-N h

II. Hours in Reporting Period 0

0 0

=

12. Number Of Hours Reactar Was Cntical 0

0 0

13. Reactor Reserve Shutdows Hours 0

0 0

~

14. Hours Generator On-Line 0
15. Unit Reserve Shutdows Hours 0

0

16. Gross Thennst Energy Generated (MWH) 0 0

0 0

0 0

17. Gross Electncal Energy Generated (MWH) 0 0

~

0

18. Net Electrical Energy Gene sted (MWH) 0 0

0

19. Unit Service Factor
20. Unit Availability Factor NA NA NA NA NA NA NA
21. Unit Capacity Factor (Using MDC Net)

NA NA

22. Unit Capacity Factor (Using DER Net)

NA NA NA

23. Unit Forced Outage Rate

"^

"A NA

24. Shutdowns Scheduled Over Next 6 Meaths (Ty' pe.Ekste.and Duration of Eachir NA

~

25. If Shur Down Ar End Of Report Persed. Estimased Date ofStartup:

'M

26. Units la Test Status (Prior to Comanerent Operanook Forecast Achiesed INITIALCRITICALITY 1/5/81 NI INITIAL ELECTRICITY I/14/81 NA COMMERCIAL OPERATION 4/1/81 NA

?..

  • The Nameplat'e Rating / Design Electrical Rating will.be used 'forJ he Maximum t

Dependqble Capacity until an accurate value can,be determined ffom operating experience.

(W77) e e

to s.

AVERAGE DAILY UNITPOWER LEVEL I

j f

50-364 DOCKET NO.

2 y

DATE 11/1/80 COMPLETED BY W. G. Hairston, III.

f TELEPHONE (205)899'-5156 October, 1980 DAY AVERAGE DAILY POWER LEVEL

  • DAY AVERAGE DAIL POWER LEVEL (MWe Net)

(MWe-Net) g, No power output in October gy 2

18 3

19 4

3 5

21

6 22 7

23 8

24

~

9 25 10 26 II 27 12

, 28 13 29 I4 30 IS 31 I6 l

i l

INSlRUCTIONS On this format.!ist the averste daily unit power levelin MWe. Net for each day in the repomns month. Cornpute to the nearest whole megswatt.

~

- ' ' +

p)

L g

g u

UNITSilU1 DOWNS ANDl'OWER REDUCTIONS I

I NAME.T, riev -Unit l2.'

DATE 11/1/B0 REPORT MONTil October, 1980 COMPLETED BY t>

c-Unircran III ELEPHONE (205)899-5156 '

.3 ?

'h E

Licensee E-r,.

Cause & Corrective N...

Date g

g i

2g5 Event g,7 g3 Action to yE 5

y p3 Reporiet mO V-H o

Preve.> Recurrence e

u 6

Recei ved Operatin ; License 10/ 23/80 Ini tial core load proje cted for I ;tte November, 1980, T

(<

C U

PE n

Pe

%d

.W N

b I

2 3

4

f. T a ed Reason:

Method:

Exhibit G - Inst suctions S. Sch du cd A Equipment Failure (Explain)

1. Manual for Prepa:ation of Data ll Maintenance or Test 2-Manual Scram.

Entsy Sheets for Licensee C-Refueling 3-Automatic Scram.

Event Report (LER) File (NilREG.

D-Regulatory Rest iction 4-Other (Explain) 0161)

E Operator Training & License lixamination F-Administaative 5

G Operational 1 ros (Enplain)

Exlubit I-Same Source (9/77)

Il-Ot her (Explain)

i e

JOSEPH M. FARLEY NUCLEAR PLANT UNIT 2 NARRATIVE

SUMMARY

OF OPERATIONS OCTOBER, 1980 1

Alabama Power Comp ey's Joseph M. Farley Nuclear Plant, Unit 2 received its Operating License (O. L.) on 10/23/80.

The projected date-for initial core load is late November, 1980.

em

~

~

OPERATING DATA REPORT DOCKETNO. 50-364 DATE 11/1/80 t

COSIPLETED BY W. G. Haftston,II I TELEPHO.NE r,nngoo-5M 6 OPERATING STATUS

1. Unit Name:

Joseph M. Farley - Unit 2 Noge8 1) Received Operating

2. Reportins Period:

october, 1980 License 10/23/80. Initial

~,

3. Licensed Thermal Power (MWt):

2652

. Core loading projected for

4. Nameplate Rating (Gross a We):

860 late November, 1980

5. Design Eectrical Rasmg (Net SIWE): 820
6. Sf azimura Dependable Capacity (Geoss M Wr):

860*

t

7. Afazimum Dependable Capacity (Net SIWE).

_ 829*

8. If Changes Occur in Capacity Ratians (Items Nanber3 71uough 7) Since L'st Report. Give Ransoas:

b a

NA y

.q

9. PowerI.svel To Which Restrused,IfAny (Net AIWe):

See ites 10 b.

10. Rsasos For P= *--* 21f Any:

NPF-8 U.M. Farlev Untt 9 Yfe.one. Fnr v.m1 Load and Low Power Testing) Section 12.0 reouires certain NUREG-0694 conditions to be complete prior to ruel load and zero power testing.

... n;, m.,g p'

' c

.w

11. Hours la ReportingPened

~ '.-

0 0

0

12. Number Of Hours Resctor Was Cntical 0

0

13. ReactorReserveShardown Hours 0

0 0

34. Hours Generator On-Line 0

0-0

15. Unit Reserve Shutdown Homs

- 16. Gross Thermal Energy Generated (MWH) 0 0

0 0

0 0

,~

17. Gross Electrun! Energy Geneested (MWH) 0 0

~

0 Is. Net Erectncal Energy Generated (MWH) 0-0

- 0

19. Unic Service Factor NA NA NA
20. Unit Availability Factor NA NA NA NA
21. Unit Capacity Factor (Using MDCNet)

NA NA

22. Unit Capsory Factor (Using DER Net)

NA NA NA

23. Unit Forced Outage Rate A

^

24. Shutdowns Scheduled Over Next 6 Months (T[vpe. Dare,and Darusson of Each1:~

NA

~

25. If Shut Down At End Of Report Period. Estimased Date ofStartup:

H

26. Units la Test Status (Prior to Ceaummeced Operstaan n:

Forecast Achieved Nd INITIALCRITICALITY 1/5/81 INITIAt. ELECTRICITY 1/14/81 NA COMMERCIAL OPERATION 4/1/81 NA

~

  • The Nameplat'e Rating / Design Electrical Rating vill.be used 'forJ he Maximum t

Dependqble Capacity until an accurate value can,be determined ffhm operating experience.

2. -

M77)

~

%DR TMNalo.

- um

[

~_

c AVERAGE DAlt.Y UNITPOWER LEVEL

,s a

e

+

50-364 DOCKET NO.,

i 1

's,

2 y

q"......,**'

DATE 11/1/80 MMPt.ETED BY W. G. Hairston, III f

TELEPHONE (205)899 _5156 October, 1980 4

DAY AVERAGE DAILY POWER LEVEL

  • DAY AVERAGE DAILY POWER LEVEL (MWe Net)

(MWe Net) 3, No oover output in October 17 i

2 18 3

19 4

2 6

22

..z..-

7 23 3

24 3

10 2d y..

Il 27

~~'

12.

..23

. j,,

13 29 14 30 15 31 16

)

INSTRUCTIONS On this format.I c the average daily unit power levet in MWe Net for each day in the repomos month. Compute eo the nearest whole megswatt.'

~

~

~

y) l i

~

r

--~e

,e~

r e--

e,--

w w

s~'

' -e' w-v=-~w c=

UNITSifU1 DOWNS AND POWER REDUCTIONS DOCKET NO. -

50-364 UNIT NAME J. M. Farley -tInit,2

..a.

DATE 1111/80 REPORT MONTil October, 1980 COMPl.ETED BY u c n,,. o r n,,

tyt TEt.EPff0NE (20$1899-5156 '

% r :k 5*

a re 2E E

., 3 4

. Licensec h

e,,

Cause & Corrective W.

Dale

[

gg g

.g g ;

Event u?

Eb" Action to g3 5 5

j gg g Report

  • N0 H

Prevent Recurrence 6

Recei ved Operatin g License 10/ 23/80 Ini tial core load projected for l ate November, 1980, s

1 C

C3 m

i 2

3 4

Q F: Forced Reason:

Method:

Er.hibit G. Instructions S: Scheduled A Equipment Failure (Explain)

1. Manual for Preparation of Data M

H.Msintenance of Test

2. Manual Scram.

Entiy Sheets for 1.ieensee C. Refueling 3 Automatic Scram.

Event Report (LER) File (NUREG-D Regulatory Restricsion 4 Other (Explain) 0161)

E Operaint Training & License Examination 74 F. Administrative 5

G-Ope ational Estur (Explain)

Exhibit I Same Source N

.19/77) ll-Other (Explain) h 4

. -