O JOSEPH M. FARLEY NUCLEAR PLANT UNIT 2 NARRATIVE
SUMMARY
OF OPERATIONS l
OCTOBER, 1980 Alabama Power Company's Joseph h. Farley Nuclear Plant, Unit 2 received its Operating License (O. L.) on 10/23/80.
The projected date for initial core load is late November, 1980.
4 a
A s
8011210 390
~
OPERATING DATA REPORT DOCKET?iO. 50-364 l
DATE 11/1/80 COMPLETED BY IL G. Hairston,III TELEPlic.NE r w Aoo 5156 OPERATING STATUS a
I. Uu Nm Joseph M. Farley - Unit 2 Notes 1) Received Operating
- 2. Reporting Period:
October. 1980 License 10/23/80.
Initial
- 3. Licensed Thermal Power (MWt):
2652
. Core load W prd e M M
- 4. Nameplate Rating (Gross MWe):
860 late November, 1980.
- 5. Design E ectrical Racing (Net atWe): 829
- 6. Maximum Dependable Capacity (Gross MWe):
860*
e
- 7. Maximum Dependable Capacity (Net MWe):
829*
- 8. If Changes Occur in Capacwy Ratings (Items Number 3 Thsough 7) Since Last Report. Give Reasons:
NA
- 9. Power level To Which Restnered, If Any (Net MWe):
See item 10
- 10. Reasons For Restrictions.If Any:
NPF-8 O.M. Parlev Unfe 2 ifcom n n,- r., n 1 Load and s
Low Power Testing) Section 12.0 recuires certain NUREC-0694 conditions to be
~
complete prior to fuel load and zero power testing.
\\
s.
This heek YrAn-N h
II. Hours in Reporting Period 0
0 0
=
- 12. Number Of Hours Reactar Was Cntical 0
0 0
- 13. Reactor Reserve Shutdows Hours 0
0 0
~
- 14. Hours Generator On-Line 0
- 15. Unit Reserve Shutdows Hours 0
0
- 16. Gross Thennst Energy Generated (MWH) 0 0
0 0
0 0
- 17. Gross Electncal Energy Generated (MWH) 0 0
~
0
- 18. Net Electrical Energy Gene sted (MWH) 0 0
0
- 19. Unit Service Factor
- 20. Unit Availability Factor NA NA NA NA NA NA NA
- 21. Unit Capacity Factor (Using MDC Net)
NA NA
- 22. Unit Capacity Factor (Using DER Net)
NA NA NA
- 23. Unit Forced Outage Rate
"^
"A NA
- 24. Shutdowns Scheduled Over Next 6 Meaths (Ty' pe.Ekste.and Duration of Eachir NA
~
- 25. If Shur Down Ar End Of Report Persed. Estimased Date ofStartup:
'M
- 26. Units la Test Status (Prior to Comanerent Operanook Forecast Achiesed INITIALCRITICALITY 1/5/81 NI INITIAL ELECTRICITY I/14/81 NA COMMERCIAL OPERATION 4/1/81 NA
?..
- The Nameplat'e Rating / Design Electrical Rating will.be used 'forJ he Maximum t
Dependqble Capacity until an accurate value can,be determined ffom operating experience.
(W77) e e
to s.
AVERAGE DAILY UNITPOWER LEVEL I
j f
50-364 DOCKET NO.
2 y
DATE 11/1/80 COMPLETED BY W. G. Hairston, III.
f TELEPHONE (205)899'-5156 October, 1980 DAY AVERAGE DAILY POWER LEVEL
- DAY AVERAGE DAIL POWER LEVEL (MWe Net)
(MWe-Net) g, No power output in October gy 2
18 3
19 4
3 5
21
6 22 7
23 8
24
~
9 25 10 26 II 27 12
, 28 13 29 I4 30 IS 31 I6 l
i l
INSlRUCTIONS On this format.!ist the averste daily unit power levelin MWe. Net for each day in the repomns month. Cornpute to the nearest whole megswatt.
~
- ' ' +
p)
L g
g u
UNITSilU1 DOWNS ANDl'OWER REDUCTIONS I
I NAME.T, riev -Unit l2.'
DATE 11/1/B0 REPORT MONTil October, 1980 COMPLETED BY t>
c-Unircran III ELEPHONE (205)899-5156 '
.3 ?
'h E
Licensee E-r,.
Cause & Corrective N...
Date g
g i
2g5 Event g,7 g3 Action to yE 5
y p3 Reporiet mO V-H o
Preve.> Recurrence e
u 6
Recei ved Operatin ; License 10/ 23/80 Ini tial core load proje cted for I ;tte November, 1980, T
(<
C U
PE n
Pe
%d
.W N
b I
2 3
4
- f. T a ed Reason:
Method:
Exhibit G - Inst suctions S. Sch du cd A Equipment Failure (Explain)
- 1. Manual for Prepa:ation of Data ll Maintenance or Test 2-Manual Scram.
Entsy Sheets for Licensee C-Refueling 3-Automatic Scram.
Event Report (LER) File (NilREG.
D-Regulatory Rest iction 4-Other (Explain) 0161)
E Operator Training & License lixamination F-Administaative 5
G Operational 1 ros (Enplain)
Exlubit I-Same Source (9/77)
Il-Ot her (Explain)
i e
JOSEPH M. FARLEY NUCLEAR PLANT UNIT 2 NARRATIVE
SUMMARY
OF OPERATIONS OCTOBER, 1980 1
Alabama Power Comp ey's Joseph M. Farley Nuclear Plant, Unit 2 received its Operating License (O. L.) on 10/23/80.
The projected date-for initial core load is late November, 1980.
em
~
~
OPERATING DATA REPORT DOCKETNO. 50-364 DATE 11/1/80 t
COSIPLETED BY W. G. Haftston,II I TELEPHO.NE r,nngoo-5M 6 OPERATING STATUS
- 1. Unit Name:
Joseph M. Farley - Unit 2 Noge8 1) Received Operating
- 2. Reportins Period:
october, 1980 License 10/23/80. Initial
~,
- 3. Licensed Thermal Power (MWt):
2652
. Core loading projected for
- 4. Nameplate Rating (Gross a We):
860 late November, 1980
- 5. Design Eectrical Rasmg (Net SIWE): 820
- 6. Sf azimura Dependable Capacity (Geoss M Wr):
860*
t
- 7. Afazimum Dependable Capacity (Net SIWE).
_ 829*
- 8. If Changes Occur in Capacity Ratians (Items Nanber3 71uough 7) Since L'st Report. Give Ransoas:
b a
NA y
.q
- 9. PowerI.svel To Which Restrused,IfAny (Net AIWe):
See ites 10 b.
- 10. Rsasos For P= *--* 21f Any:
NPF-8 U.M. Farlev Untt 9 Yfe.one. Fnr v.m1 Load and Low Power Testing) Section 12.0 reouires certain NUREG-0694 conditions to be complete prior to ruel load and zero power testing.
... n;, m.,g p'
' c
.w
- 11. Hours la ReportingPened
~ '.-
0 0
0
- 12. Number Of Hours Resctor Was Cntical 0
0
- 13. ReactorReserveShardown Hours 0
0 0
- 34. Hours Generator On-Line 0
0-0
- 15. Unit Reserve Shutdown Homs
- 16. Gross Thermal Energy Generated (MWH) 0 0
0 0
0 0
,~
- 17. Gross Electrun! Energy Geneested (MWH) 0 0
~
0 Is. Net Erectncal Energy Generated (MWH) 0-0
- 0
- 19. Unic Service Factor NA NA NA
- 20. Unit Availability Factor NA NA NA NA
- 21. Unit Capacity Factor (Using MDCNet)
NA NA
- 22. Unit Capsory Factor (Using DER Net)
NA NA NA
- 23. Unit Forced Outage Rate A
^
- 24. Shutdowns Scheduled Over Next 6 Months (T[vpe. Dare,and Darusson of Each1:~
NA
~
- 25. If Shut Down At End Of Report Period. Estimased Date ofStartup:
H
- 26. Units la Test Status (Prior to Ceaummeced Operstaan n:
Forecast Achieved Nd INITIALCRITICALITY 1/5/81 INITIAt. ELECTRICITY 1/14/81 NA COMMERCIAL OPERATION 4/1/81 NA
~
- The Nameplat'e Rating / Design Electrical Rating vill.be used 'forJ he Maximum t
Dependqble Capacity until an accurate value can,be determined ffhm operating experience.
- 2. -
M77)
~
%DR TMNalo.
- um
[
~_
c AVERAGE DAlt.Y UNITPOWER LEVEL
,s a
e
+
50-364 DOCKET NO.,
i 1
's,
2 y
q"......,**'
DATE 11/1/80 MMPt.ETED BY W. G. Hairston, III f
TELEPHONE (205)899 _5156 October, 1980 4
DAY AVERAGE DAILY POWER LEVEL
- DAY AVERAGE DAILY POWER LEVEL (MWe Net)
(MWe Net) 3, No oover output in October 17 i
2 18 3
19 4
2 6
22
..z..-
7 23 3
24 3
10 2d y..
Il 27
~~'
12.
..23
. j,,
13 29 14 30 15 31 16
)
INSTRUCTIONS On this format.I c the average daily unit power levet in MWe Net for each day in the repomos month. Compute eo the nearest whole megswatt.'
~
~
~
y) l i
~
r
--~e
,e~
r e--
e,--
w w
s~'
' -e' w-v=-~w c=
UNITSifU1 DOWNS AND POWER REDUCTIONS DOCKET NO. -
50-364 UNIT NAME J. M. Farley -tInit,2
..a.
DATE 1111/80 REPORT MONTil October, 1980 COMPl.ETED BY u c n,,. o r n,,
tyt TEt.EPff0NE (20$1899-5156 '
% r :k 5*
a re 2E E
., 3 4
. Licensec h
e,,
Cause & Corrective W.
Dale
[
gg g
.g g ;
Event u?
Eb" Action to g3 5 5
j gg g Report
- N0 H
Prevent Recurrence 6
Recei ved Operatin g License 10/ 23/80 Ini tial core load projected for l ate November, 1980, s
1 C
C3 m
i 2
3 4
Q F: Forced Reason:
Method:
Er.hibit G. Instructions S: Scheduled A Equipment Failure (Explain)
- 1. Manual for Preparation of Data M
H.Msintenance of Test
- 2. Manual Scram.
Entiy Sheets for 1.ieensee C. Refueling 3 Automatic Scram.
Event Report (LER) File (NUREG-D Regulatory Restricsion 4 Other (Explain) 0161)
E Operaint Training & License Examination 74 F. Administrative 5
G-Ope ational Estur (Explain)
Exhibit I Same Source N
.19/77) ll-Other (Explain) h 4
. -