ML20002A723
| ML20002A723 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 11/14/1980 |
| From: | Clayton F ALABAMA POWER CO. |
| To: | NRC OFFICE OF MANAGEMENT AND PROGRAM ANALYSIS (MPA) |
| Shared Package | |
| ML20002A724 | List: |
| References | |
| NUDOCS 8011210387 | |
| Download: ML20002A723 (2) | |
Text
..
Alabama Power company 600 North 15th Street Post Office Box 2641 Birmingham, Alabama 35291 Telephone 205 250-1000 F. L CLAYTON, JR.
Senior Vice President M3h3m3 gg,g tre sournem e4xarc system November 14, 1980 Docket No. 50-364 Cl5 w
N o,
)
Director
~
=j Of fice of Management Information and p;
2V z
Program Control E,j U. S. Nuclear Regulatory Commission i
m
~
Washington, D.C. 20555 g
a
Dear Sir:
RE: Joseph M. Farley Nuclear Plant Unit No. 2 Monthly Operatir.g Data Report Attached are two (2) copies of the October, 1980 monthly operating report for Joseph M. Farley Nuclear Plant, Unit 2, as required by Section 6.9.1.10 of the Unit 2 Technical Specifications. As requested by letter from Mr. John F. Stolz to Mr. Alan R. Barton, dated October 21, 1977, a
" Narrative Summary of Operating Experience" is included in the attached report.
If you have any questions, please advice.
Yours very t,r 12%
nl F. L. Clayton, Jr.
FLCJr/JRC:bhj Attachments cc:
Mr. Ted Cintula (1 copy)
Director, IE (10 copies) 003 Director, RII (1 copy) 5 I I 8011210 ag7 R