Text
-
~
Regulttery File Cy.
YANKEE ATOMIC ELECTRIC COMPANY
~
'.~
(d T.* y' 3
20 TURNPIKE ROAD,WESTBORO. MASSACHUSETTS 01581 L
E~
TELEPHONE 617 366 9011
'Il Sp^:;." W.;;u L-i C,
August 31, 1972 iCi
,f
. r;. O O
Q,; l fi;y%
.t 4,
,S.
D 'TQ6
/
U-)/
\\
N(y f
,f/f United States Atomic Energy Commission fhD I
CQd' Washington, D. C.
20545 Sgp ~ ' L.u M
4 Attention-Directorate of Licensing W.Eg 11
-O p;r... h4 kM/.
License No. DPR-3 (Docket No. 50-29)
" '~.\\
Reference:
\\.QW.
/p pr%,s
Dear Sirs:
'd%I During the reactor start-up following the reactor scram and tur ine trip on August 27, 1972 difficulty was experienced with control rod No. 19 although this and all other control rods dropped successfully when the reactor scra=med. After a plant shutdown, procedures required that the Safety Group of control rods (Group D to 21 inches) be withdrawn until the reactor is returned to criticality. This portion of the procedure was com-pleted successfully; however, when the Safety Group was manually dr pped of a reactor start-up procedure, control rod No. 19 failed to fall as part With the aid of the pulldown coil, the control rod was into the core.
driven into the core.
Subsequently, the control rod was withdrawn to 90 inches; however, when scrammed, control rod No. 19 failed to fall completely With the aid into the core.
It dropped from 90 to approximately 24 inches.
The control of the pulldown coil, the control rod was driven into the core.
rod was again withdrawn to 90 inches and again the control rod failed to fall completely into the core.
It dropped from 90 to approximately 48 inches.
Again with the aid of the pulldown coil the control rod was driven into the Core.
Since all control rods fell into the core when the reactor scrammed and the plant is operated in accordance with the provisions of Proposed Change No. 100, the decision was made to withdraw group "D" including control rod No. 19 to 90 inches and return the plant to service.
On Wednesday, August 30, 1972 when the plant was taken off-the-line to incorporate the modifications to the low main coolant flow trip circuitry, l
The results all twenty four control rods were successfully drop time tested.
of which are attached.
i
)
k 8011170 [ 7 O p
4
.,,.m....
(
(.
United Err.ces Atomic Energy Commission August 31, 1972 Attention: Directorate of Licensing Page 2.
We trust that the above information is complete and satisfactory; however, should you desire additional information feel free to contact us.
Very truly yours, YANKEE ATOMIC ELECTRIC COMPANY v
Louis H. Heider Manager of Operations GCAlamu Attach =ent cc:
C C
. Rc)... : -
r:.,.
...L3.3I'h MEASURED CONTROL ROD DROP TDIES
~
August 30, 1972 ROD NO.
SEC.
ROD NO.
S F.C.
1 1.81 13 1.68 2
1.60 14 1.79 3
1.54 15 1.92 4
1.63 16 1.98 5
1.63 17 1.62 6
1.61 18 2.24 7
1.69 19
?.18 8
1.97 20 1.80 9
2.10 21 1.60 10
' 66 22 1.98 11 1.74 23 1,77 12 1.C6 24 2.20
AEC DIf IPUTION FOR PART 50 DOCKET MA'M "AL C~
ColiTROL ??O: 4873 (TEMPORARY FO?.M) mU, FIIP.
FROM: Yankee Atomic Elec. Co.
DATE OF DOC:
' Wastboro, Mass. 01581 Louis H. Heider 8-31-72 9-5-72 X
TO:
/
SEliT LOCAL PDR DRL 1 signed 39 INPUT NO CYS REC'D DOCKET IiO:
CLASS:
, @ PROP IIiF0 50-29 40 DESCRIPTION: Ltr rpt proolem on u-z/- / 4 ENCLOSURES:
when Control Rod No. 19 failed to fall into core........W/Attch Measure Control Rod Drop Times dtd 8-30-72
- PLEASE CIRCULATE-INSUFFICIENT CYS FOR FULL DISTRIBUTION rg t---
- m,.
I p
hd!,W 1 '
Iw$.7'] ~pfC
- l.. &....i.x..
PLANT NA!GS: YAEC FOR ACTIO:i/INFOR:J.ATION DL 9-5-72 EtJfLER(L)
KNIEL(L)
VASSALLO(L)
ZEMANN(L)
KilIGHTOli(E!iVIRO j W/ Copics W/ Copies W/ Copics W/ Copie.s W/ Copics CLfaK(L)
SC:GENCER(L)
H. DENTON CHITJ00D(FM)~
YOUIGBIDOD(E!NIF W/ Copies W/ Copies W/ Copies W/ Copics W/ Copies GOLLER(L)
STOLZ(L)
/SCHEMEL(L)
DICKER (E;ND10)
W/ Copies W/ Copies W/6 Copics W/ Copies W/ Copies INTERNAL M 8IBUTIO:s G FILE,
'fECH REVIE'd VCL*lGR H/diLESS WADE (E)
C PDR V-swdIE DE'/20N SHAFER(Ff41)
GC, ROOM F,96A CHROEDER GRIIGS F&M 3ROWN(E)
- :ACClaY G/d M LL 6MIIEr G. WILLIN'S(E)
TIZING/ST5FF ASE L'd!GE KASTHER HUSSB/dICR A/T IND C /JGUSSO PA'JLICKI BALIARD 3dAITM/di
.30YD-L( 3'dR)
Hl.O FINE LIC ASST.
SALTZM/JT fEYO'J.:G-L(PWR)
- 4 % U1'H SERVICE (L)
SKOVHOLT-L STELID ENVIRO FASON L)
PLtd:S P. COLLINS EOORE MUTJF:t WIISON L}
EUD'JIiALD
HOMPSON DICKER KARI LJ DU3E EDESCO KNIGliTON SMITH (L)
INN PEG OPR WIIE & REGION (2)
IDI;G YOUUGBLOOD GE/J1IN (L)
C. lHLES I
d'GRRIS IAII:AS PROJECT LEADER.
DIGGS (L)
N4TfELE EEN/50YA
'fEETS (L)
EXmdiAL D151il.~.4.IiIO:i _
}-IDCI.L PDR W(-ITTIZ(L*.UGHLIN)
(1)(5 X9)-N/SION!1 LAB'S 1-PDR-SAN /IA/?T.'
L -RSIC(EUCH!d!/df)
AHL/ORNL/PUL l-GERALD IELLUCHE 1-ASL3-YORE /SAYRE 1-R. CARROLL-0C, GT-B227 3R00KEAVEN N/C. IA3
-,j KOOD*J/dlD/H.ST.
1-R. CATT.IN, A-170-GT 1-30Ltd;D, IDAHO FALLS, vl6-CYS ACES EOLDING 1-CO?;SULGT'S IDid!O(50-331 Only) la!M/3K/BI!J:G/AGA3IAN 1-RD., MULLER.. F-309Gs O
en p
_..... _