ML20002A231

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-344/80-22 on 800908-12.No Noncompliance Noted
ML20002A231
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 10/02/1980
From: Spencer G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Goodwin C
PORTLAND GENERAL ELECTRIC CO.
Shared Package
ML20002A232 List:
References
NUDOCS 8011050400
Download: ML20002A231 (2)


See also: IR 05000344/1980022

Text

.

-

Tl C -

Er"%g

.,

.

g

UNITED STATES

NUCLEAR REGULATORY COMMISSION

  • 3

o

D

E

REGION V

o,

1990 N. CALIFORNIA BOULEVARD

%

,,,a

SUITE 202, WALNUT CREEK PLAZA

4

WALNUT CREEK. CALIFORNIA 94598

pf

$80

'

o

Docket :lo. 50-344 -

j

Portland General Electric Company

121 S.W. Salmon Street

,

Portland, Oregon 97204'

Attention:

.ir. Charles Goodwin Jr.

Assistant Vice President

Gentlemen:

Subject:

This refers to the inspection conducted by iir. P. P. ilarbut of this

office on Septe..soer e-12.196d of, activities autnorized by 14RC License

ilo. iiPF-1, and to the oiscussion of our finaings held oy iIr. P. P. ilarbut

with Messrs. W. S. drser, d. K. dide sehaes ano other memoers of your

staff ac tne conclusion of tne inspection.

Areas exaained during tnis inspection are descrioed in the enclosed

inspection report. Within enese areas, the inspection cons.sted of

selective examinations of p.oceuures and representative records, in-

terviews wich personnel, and observations by the inspector.

do items of noncompliance uita .idC requirements were identified within

tne scope of this inspection.

In accordance with Section 2.7]J of the WRC's " Rules of Practice,"

Part 2, Title 10, Code.of Federal Regulations, a copy of this letter and

the enclosed inspection report will be placed in the llRC's Public Document

Room.

If this report contains any information that you believe to be

proprietary, it is necassary that you submit a written application to

this office, within 20 days of the date of tnis letter, requesting that

such information be withheld from public disclosure.

The application

must include a full statement of the reasons why it is claimed that the

information is proprietary.

The application should be prepared so that

any proprietary infonnation identified is contained in an enclosure to

tne application, since the application without the encl sure will also

i

be placed in the Puolic Document Room.

If we do not hear from you in

this regard within the specified period, the report will be placed in

i

the Public Document Room.

Z

p

.

-

..

- 2-

,Ji;T

.~99g

,

,

Should you have any questions concerning this inspection, we will be

glad to discuss them with you.

Sincerely,

I

\\

^

c

G. S. Spencer,

lief

Reactor Construction and

Engineering Support dranch

Enclosure:

IE Inspection Report

11 0 . S0-344/80-22

cc w/o enclosure:

C. P. Yundt, PGE

F. C. Gaidos, PGE

J. W. Lentsch, PGE

!

l

l

-

!

.

,

--

4

m.a

-