ML19354E653

From kanterella
Jump to navigation Jump to search
Concurs W/Final Aptech Rept Re Borg-Warner Swing Arm Failure & Establishes Acceptability of Other Borg-Warner Check Valve Swing Arms Installed at Facility
ML19354E653
Person / Time
Site: Comanche Peak Luminant icon.png
Issue date: 01/23/1990
From: William Cahill
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
TXX-90033, NUDOCS 9001310520
Download: ML19354E653 (1)


Text

,

.,, ~

M-F E Log # TXX-90033 File # 903.9 10010 illELECTRIC January 23, 1990 William J. Cahill, Jr.

Enecuave iter />rsident U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C.

20555

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET NO. 50-445 APTECH REPORT REGARDING THE BORG-WARNER CHECK VALVE SWING ARMS Gentlemen:

On December 20, 1989. TV Electric letter TXX-89860 provided additional information regarding Borg Warner check valve swing arms and stated that the final APTECH report for the swing arm study would be. completed by December 29, 1989.

TV Electric has reviewed and concurs with the final APTECH report which contains the evaluation of the Borg-Warner swing arm failure and establishes the acceptability of other Borg-Warner check valve swing arms installed in Unit 1.

The final APTECH report has been made available for NRC staff review.

Should you have any questions regarding the APTECH report, contact Mr. C. B. Hogg at (817) 897-6569.

Sincerely, MAL 44W> b

~

William J. Cahill, Jr.

By:

  1. b N1 Roger D$ Walker, Manager _ Nucl ear ' Li censing CBC/cbc c - Mr. R. D. Hartin, Regio:i IV Resident Inspectors, CPSES'(3)

(

M7

-9001310D20 900123 p-PDR ADOCK 05000445~

A PDC 3 O 400 North Olive Street L B. 81 Dallas, Texas 7520!