Advises That Submittal Date for Inservice Insp Program Revised to Not Later than 900225,per Util 890331 Submittal. New Date Consistent W/Requirement for Submittal within 6 Months of Receipt of Ol,If OL Considered to Be Full Power
ML19354D660
Person / Time
Site: Limerick Constellation icon.png
Issue date: 12/22/1989
From: Hunger G
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 8912290018
Download: ML19354D660 (2)


Text

 :

10 CFR 50.55a

[4%,

l; s-PHILADELPHIA ELECTRIC COMPANY NUCLEAR GROUP HEADQUARTERS 955 65 CHESTERBROOK BLVD.

D WAYNE PA 19087 5691 U

(sis)esosooo December 22, 1989 0

Docket No. 50-353 License No. NPF-85 U.S. Nuclear Regulatory Commission Attn Document Control Desk Washington, DC 20555

SUBJECT:

Limerick Generating Station, Unit 2 Inservice Inspection Program Revised Submittal Date Gentlemen:

Philadelphia Electric Company (PECo) indicated -in a March 31, 1989 submittal that the Limerick Generating Station (LGS), Unit 2 Inservice Inspection (ISI) Program would be submitted to the NRC within-six months of receipt of an Operating License (OL).

PECo's intent at that time was that the OL referred to would be the original

'OL1(issued June 22, 1989).

However, unforeseen circumstances have resulted in. minor delays.

The ISI Program is now expected to be finalized for submittal to the NRC no later than February 25, 1990.

This submittal date corresponds to "within six months-of receipt of an OL" if-the OL is considered to be the full power license (issued August 25, 1989).

My staff has discussed this revised submittal schedule with the NRC Project Manager for LGS and understands this schedule revision to be acceptable.

As before, the ISI Program will include augmented inspections for the feedwater check valves (as discussed in our letter

"?

of January 3, 1989) and augmented inspections to detect intergranular stress corrosion cracking.(as discussed in our letter of August 2, 1989).

45 hof7 8912290018 891222 PDR ADOCK 05000353 i 9 o

PDC

i*V0'U.S. NuclGar'R;gulatory Commicsion D3c:mbar 22, 1989

,Rocumtnt Control D30k Page 2

..3' If you have any questions regarding this matter, please Very truly yours, ft G. A. Hunger, Jr.

Director Licensing Section Nuclear Services Department cc:=

W. T. Russell, Administrator, Region I, USNRC

-T.

J. Kenny, USNRC Senior Resident Inspector, LGS b

F p